Emergency plan for power supply company to deal with bad weather
Emergency plan for power supply company to deal with bad weather

In normal study, work or life, it is inevitable that some accidents will happen suddenly. In order to prevent things from getting worse, it is often necessary to make emergency plans in advance. What formats should I pay attention to when writing emergency plans? The following is the emergency plan for the power supply company to deal with bad weather, which I compiled for you, for your reference, hoping to help friends in need.

General rules for 1

1. 1 In order to effectively prevent, timely control and eliminate the hazards of sudden production accidents (hereinafter referred to as sudden accidents) caused by bad weather (such as fog, freezing, strong wind, tornado, rainstorm, thunderstorm, hail, flood, etc.), this plan is formulated. ), organize emergency repair in time to ensure the safe operation and reliable power supply of the power grid.

1.2 the company set up the disastrous weather emergency headquarters, which is responsible for the unified leadership and unified command of the company's disastrous weather emergency treatment.

1.2. 1 Bad weather emergency headquarters is under the command of the general manager, with other company leaders as deputy commanders, and is composed of the heads of production technology department, safety supervision department, administration department, political work department, trade union, dispatching communication center, power transmission and distribution department, substation work department, marketing department, rural power development department, Qiyuan company and various power supply departments. The headquarters is located in the emergency command center on the fifth floor.

1.2.2 there is a bad weather emergency handling office in emergency headquarters, which is located in the production technology department.

1.3 After receiving the early warning information of bad weather, the Emergency Office announced the start of this plan, and under the unified leadership of the headquarters, it carried out emergency treatment for sudden accidents.

1.4 in case of bad weather, all subordinate units of the company shall, under the unified leadership of the emergency office, start their own emergency plans at the same time to deal with unexpected accidents.

1.5 The emergency work in severe weather should follow the policy of putting prevention first and being always ready, and implement the principles of unified leadership, graded responsibility, quick response, safety and high efficiency.

2 Organization and responsibilities

2. 1 Emergency Leading Group for Severe Weather

2. 1. 1 The company set up a severe weather emergency leading group.

2. 1.2 Main responsibilities of the company's severe weather emergency leading group:

(1) Carry out the laws and regulations of the superior on emergency rescue and treatment of accidents;

(2) Accept the leadership of the emergency leading group of the municipal company and request the local government to provide emergency assistance for the emergency treatment of the company;

(3) Unified leadership of the company's emergency rescue and emergency treatment;

(4) Study on major emergency decision-making and deployment;

(5) Announcing the company's entry and lifting the early warning;

(6) Declare the Company to enter and lift the state of emergency;

(seven) to decide on the implementation and termination of the emergency plan;

(8) release relevant information;

2.2 Severe Weather Emergency Office

2.2. 1 the emergency leading group has a bad weather emergency handling office, which is located in the production technology department and is responsible for daily work.

2.2.2 Main responsibilities of the office:

(1) Implement various tasks deployed by the emergency leading group;

(2) Supervise the implementation of emergency instructions issued by the emergency leading group;

(3) Organize to formulate emergency plans and supervise their implementation;

(4) Grasp the emergency handling situation and report the major problems in the emergency process to the emergency leading group in time.

2.3 Professional Working Group for Emergency Response to Severe Weather

The emergency office for severe weather consists of emergency departments such as power grid dispatching (located in dispatching communication center), equipment maintenance (located in transmission and distribution department and substation department), accident investigation (located in safety supervision department), marketing service (located in marketing department), material support (located in logistics sub-center), security (located in security office), logistics support (located in life service center) and news release (located in political work department).

3 Information collection, release and reporting

3. 1 information system

3. 1. 1 The company establishes a system for collecting, publishing and reporting information about bad weather and unexpected accidents caused by bad weather. The dispatching communication center is responsible for the collection of disastrous weather information, the determination of disaster level, information release and report. Dispatching communication center shall timely notify the release of bad weather information after the base adjustment notice or the bad weather forecast notice issued by XX Meteorological Observatory.

3. 1.2 The responsible department for determining the emergency level is the dispatching communication center.

3. 1.3 Report of unexpected accidents to superiors (municipal company, municipal party committee, municipal government, municipal safety production supervision and management bureau, etc.). ) According to the principle of unification and coordination, the responsible departments shall report to their respective centralized departments.

3. 1.3. 1 The responsible department reporting to the municipal company, municipal party committee and municipal government is the administration department.

3. 1.3.2 Responsible departments reporting to professional departments (safety supervision, biotechnology, dispatching, marketing, rural power, etc.). ) they are all professional counterparts.

3. 1.3.3 The responsible department reporting to the Municipal Safety Supervision Bureau is the safety supervision department.

3. 1.4 If it may affect users or has affected users, the responsible department for transmitting information and explaining the work to users is the customer service center.

3. 1.4. 1 Marketing Department shall establish a contact system for important users, clarify the responsible person and contact users, and obtain relevant information (such as leaders or managers in charge of electric power) and contact information of these users.

3. 1.4.2 After receiving the bad weather information that may lead to power failure, the contact person in charge shall be responsible for informing the contacted users of the situation, and doing a good job in forecasting and preventing power failure accidents.

3. 1.4.3 When an important user loses power due to an accident, contact the responsible person to contact the user and do a good job of explanation. Immediately contact the person in charge for contact and explanation after the sudden accident affects the user; Contact the user within 2 hours after the accident (contact the user within 6 hours after the accident at night).

3. 1.4.4 For users with high requirements for power supply reliability, the marketing department should check the power supply methods and measures of users, and urge these users to take corresponding rectification measures when necessary (such as adopting dual power supply methods or providing standby power generation equipment).

3. 1.5 If it may affect or has affected the rural power system, the responsible department for transmitting information and explanations to the rural power system is the Ministry of Rural Power Development.

3. 1.5. 1 Establish the contact system of rural power units, clearly contact the responsible person, and obtain the relevant information and contact information of these units.

3. 1.5.2 after receiving the bad weather information that may cause accidents, the marketing department shall contact the responsible person to inform the important user units of the situation, and make accident prediction and power outage prevention measures.

3. 1.5.3 In case of power failure due to an accident, the Rural Power Development Department shall contact the responsible person to be responsible for contacting and explaining the villages and towns.

3. 1.5.4 The contact responsible person is responsible for checking the power supply mode and measures of the contact unit, and urging users to take power-saving measures when necessary.

3. 1.6 The responsible department for news gathering, information release to the news media and information release to the society is the political work department.

3. 1.6. 1 The Political Work Department is responsible for establishing the contact system of news organizations.

The political work department should establish a normal contact mechanism with the news media and coordinate the notification system before the news media form a power news report.

3. 1.6.2 Information that needs to be released to the news media and society shall be reviewed and approved by the Emergency Office and released by the Political Work Department.

3.2 Information Collection and Release

3.2. 1 The dispatching communication center shall keep in touch with local and meteorological departments to obtain bad weather information at any time.

3.2.2 Other departments shall report to the dispatching communication center and emergency office in time after obtaining the bad weather information.

3.2.3 After the dispatching communication center collects the bad weather information, it shall immediately send an early warning signal to the emergency office and the heads of relevant departments.

3.3 Information report

3.3. 1 When bad weather causes an unexpected accident under any of the following circumstances, the dispatching department (or the accident department) shall immediately report to the competent leader of the company and the person in charge of relevant units.

3.3. 1. 1 Personal accident with serious injury or above.

3.3. 1.2 Power grid accidents with first-class obstacles and above.

3.3. 1.3 Equipment-type obstacles and above equipment accidents.

3.3. 1.4 10 kV and above lines are inverted (tower) and disconnected.

3.3. 1.5 10 kv and above main electrical equipment is damaged.

3.3. 1.6 Dispatching communication and relay communication are interrupted.

3.3. 1.7 caused power failure for important users.

3.3. 1.8 Other accidents that need to be reported.

3.3.2 When the sudden accident caused by bad weather in one of the following scenarios reaches the early warning level of large-scale power outage, the corresponding early warning information will be started.

3.3.3 Relevant units shall immediately report unexpected accidents in accordance with the Provisions on the Investigation of Electric Power Production Accidents of State Grid Corporation.

3.3.4 No unit, department or individual may conceal, delay reporting, make false reports, fail to report or instruct others to conceal, delay reporting, make false reports or fail to report unexpected accidents.

4. Early warning system

4. 1 establishment of early warning system

4. 1. 1 Set the flag.

Set signs such as alarm contact information on the line tower. The power transmission and transformation department is responsible for the implementation.

4. 1.2 Establish an incentive fund.

The company shall set up an award fund, and the administrative department shall formulate the award standard, and put forward the award opinions for the personnel who report in time or assist in emergency repair, which shall be implemented after being approved by the competent leader.

4. 1.3 Give full play to the patrol protection function of power supply enterprises.

Incorporate the line under the jurisdiction of the municipal company that passes through rural areas and urban areas into the assessment content of power supply enterprises, sign a responsibility agreement, and clarify the maintenance content and assessment methods.

4. 1.4 Take technical measures.

Install high-precision line fault location device in substation to improve fault location accuracy.

4. 1.5 Establish a communication system.

Provide necessary communication tools for management and emergency repair personnel, such as mobile phones, hand-held (car-mounted) walkie-talkies, etc., and keep the communication smooth.

4.2 Early Warning Release and Plan Start-up

4.2. 1 After receiving the bad weather information that may cause unexpected accidents, the dispatching communication center shall immediately issue an early warning signal.

According to the influence degree of bad weather, the warning signal is divided into yellow, orange and red from light to heavy:

4.2. 1. 1 When the disastrous weather meets the following conditions, a yellow warning signal for typhoon, rainstorm, fog, thunderstorm, gale, blizzard and icing will be issued:

May be affected by the weather within 24 hours, with an average wind force of 6 or above or a gust of 7 or above; Or have been affected by the weather, the average wind force is 6-7, or the gust is 7-9 and may continue; 6 hours of rainfall will reach more than 50 mm, or has reached more than 50 mm and the rainfall may continue; /kloc-Fog with visibility less than 500 meters may appear within 0/2 hours, or fog with visibility less than 500 meters and greater than or equal to 200 meters has appeared and may continue; It may be affected by thunderstorms and strong winds within 6 hours, with an average wind force of more than 6 or a gust of more than 7 accompanied by strong lightning; Or have been affected by thunderstorms and strong winds, with an average wind force of 6-7, or gusts of 7-8 accompanied by strong lightning, and may continue; /kloc-It may be affected by strong winds within 0/2 hours, with an average wind force of above 6 or a gust of above 7; Or have been affected by strong winds, with an average wind force of 6-7, or gusts of 7-8 and may continue; /kloc-snowfall with snow thickness greater than 25mm occurs within 0/2 hour; The lines are covered with 2-5 mm thick ice.

4.2. 1.2 When the disaster weather meets the following conditions, an orange warning signal for typhoon, rainstorm, fog, thunderstorm and gale, gale, blizzard and icing will be issued:

/kloc-It may be affected by weather changes within 0/2 hours, with an average wind force of above 7 or a gust of above 9; Or it has been affected by weather changes, with an average wind force of 9 ~ 10, or a gust of wind 10 ~ 1 1 and may continue; 3 hours of rainfall will reach more than 50 mm, or has reached more than 50 mm and the rainfall may continue; Fog with visibility less than 200 meters may appear within 6 hours, or fog with visibility less than 200 meters and greater than or equal to 50 meters has appeared and may continue; It may be affected by thunderstorms and strong winds within 2 hours, with an average wind force of 8 or above, or a gust of 9 or above, accompanied by strong lightning; Or have been affected by thunderstorms and strong winds, with an average wind force of 8-9, or a gust of 9- 10 accompanied by strong lightning, and may continue; It may be affected by strong winds within 6 hours, with an average wind force of 8 or above or a gust of 9 or above; Or it has been affected by strong winds, with an average wind force of 8-9, or a gust of 9- 10 and may continue; /kloc-snowfall with snow thickness greater than 50 mm within 0/2 hours; The icing thickness of the line is 5- 10 mm. ..

4.2. 1.3 Typhoon, rainstorm, fog, thunderstorm, gale, gale, blizzard and frozen red warning signal will be issued when the disastrous weather meets the following conditions:

It may be or has been affected by the typhoon within 6 hours, and the average wind power can reach above 10, or it has reached above 10 and may continue; The rainfall in 3 hours will reach 100 mm or above, or it has reached 100 mm and the rainfall may continue; Strong fog with visibility less than 50 meters may appear within 2 hours, or strong fog with visibility less than 50 meters has appeared and may continue; It may be affected by thunderstorms and strong winds within 2 hours, and the average wind power can reach more than 10 with strong lightning; Or it has been affected by thunderstorms and strong winds, and the average wind force is above 10 with strong lightning, and it may continue; There may be strong winds above the average wind power 10 within 6 hours, or there have been strong winds above the average wind power 10 and may continue; Snowfall with snow thickness greater than 100mm occurs within 12 hours; The thickness of floating ice on the line is 10- 15mm (reference: according to the standard wind level in the power supply area and the wind level specified by China Meteorological Bureau, the secondary wind speed should be reduced accordingly).

4.2. 1.4 When the ice thickness of the line exceeds 15mm; ; When the wind force exceeds the maximum design requirement of 30m/ s, start the red warning of bad weather.

4.2.2 After receiving the early warning information, all units should immediately put relevant personnel, materials and equipment on standby, and all communication tools related to emergency rescue should be kept open day and night.

4.2.2. 1 After receiving the yellow warning information, the emergency personnel on duty and the leaders on duty in production should enter the combat readiness state;

4.2.2. 1.65438+

4.2.2. 1.2 Production Technology Department organizes relevant departments and units to make special plans for preventing various disasters. The marketing department should make all preparations for the emergency plan for power failure of important users.

4.2.2. 1.3 All operating units should strengthen equipment inspection and operation monitoring, find and handle equipment defects in time, and report any problems found in time. At the same time, it is necessary to strengthen duty, arrange all preparations for emergency repair, and ensure smooth communication.

After 4.2.2.2 received the orange warning information, emergency headquarters, the office staff, the shift leader of production duty and the administrative duty of each unit were in place in time, so they had to enter the post preparation state (day and night), and the duty and stationmaster were on duty, and the emergency rescue teams of various departments entered the preparation state;

4.2.2.2.1The dispatching communication center should adjust the operation mode according to the actual situation, and do a good job in accident prediction and important equipment tripping treatment; Operators on duty should strengthen their duty work and pay close attention to the running state of the equipment.

4.2.2.2.2 Production Technology Department shall organize relevant departments and units to make special plans to prevent all kinds of disasters. The marketing department should make all preparations for the emergency plan for power failure of important users.

After 4.2.2.3 received the red warning information, all personnel of the emergency office and all units arrived at their posts, mainly production deputies. The maintenance personnel, emergency rescue teams, materials and equipment of all relevant units all entered the post preparation state (day and night) and stood by, and carried out emergency rescue at any time.

4.2.3 When sudden events caused by disastrous weather cause large-scale power outage, the Emergency Plan for Large-scale Power Grid Blackout shall be started immediately.

5 sudden accident treatment

5. 1 Receive information and arrive at the scene of the sudden accident.

5. 1. 1 After receiving the accident information, the emergency office should immediately start the emergency plan of the unit and organize relevant personnel to arrive at the scene of the accident quickly.

5. 1.2 After the maintenance (emergency repair) personnel arrive at the scene of the accident, they should quickly find out the accident situation, report to the dispatcher on duty in time, and pay attention to protecting the scene of the accident.

5. 1.3 After arriving at the scene of the accident, the person in charge of the biotechnology and safety supervision department and the special person shall pay attention to collecting relevant information, take photos (videos) of the scene and keep them properly.

5. 1.4 define the on-site emergency repair headquarters and the rear commander-in-chief, and organize the follow-up personnel to make preparations.

5.2 Reserve maintenance personnel

5.2. 1 Each unit shall establish a mechanism to concentrate large-scale personnel for emergency repair under bad weather conditions.

5.2.2 Each unit should have personnel who can directly participate in the emergency repair, and have contact information to keep the communication smooth.

5.2.3 Each unit should know the situation of the backup personnel who can take part in the emergency repair. When the backup personnel of the unit are insufficient, the emergency office should coordinate to solve it.

5.3 Repair tools and instruments

5.3. 1 All units should be equipped with emergency repair tools and large tools, such as lighting, traffic vehicles (including off-road vehicles that can be used in bad weather and bad road conditions) and cranes.

5.3.2 Each unit shall know the storage location, quantity and present situation of emergency repair tools and instruments, and ensure that they are ready for emergency repair.

5.3.3 emergency headquarters is responsible for coordinating and solving the shortage of emergency repair tools and equipment in this unit.

5.4 spare parts

5.4. 1 All units shall have callable spare parts for substations and transmission lines.

5.4.2 Each unit shall know the quantity, current situation and storage location of spare parts in time, and can call them at any time.

5.4.3 The production technology department is responsible for coordinating and solving the shortage of spare parts in this unit.

5.5 Emergency repair site command

5.5. 1 For the on-site emergency repair command attended by a single unit, the unit is responsible for determining the on-site commander.

5.5.2 For emergency repairs involving multiple units, the emergency office shall designate a special person to be responsible for unified command, and the emergency repair personnel of each unit shall obey the command of the on-site commander.

5.6 Recovery of accident equipment

The recovery of accident equipment is ordered by the dispatching department responsible for dispatching the equipment, and other departments obey the orders of the dispatching department.

5.7 Coordinate relevant personnel of the company headquarters to rush to the scene of sudden accidents.

According to the requirements of the emergency office, relevant personnel from relevant departments of the company headquarters arrived at the scene.

5.8 Coordinate the company leaders and the leaders of the superior departments to the scene of the sudden accident.

5.8. 1 According to the emergency, the administration department is responsible for coordinating the company leaders to arrive at the scene.

5.8.2 When the leader of the superior department needs to arrive at the scene of an unexpected accident, the administrative work department shall be responsible for coordination.

6 logistics support

6. 1 personal safety guarantee

6. 1. 1 During emergency repair, all participants should pay attention to personal safety and carry out emergency repair on the premise of ensuring personal safety.

6. 1.2 All personnel who arrive at the scene of the sudden accident should pay attention to personal safety and must obey the on-site command. The person in charge of emergency repair is responsible for supervising and implementing the safety measures at the emergency repair site and the personal safety of all personnel.

6. 1.3 The unit (department) is responsible for the daily safety education and training of personnel who arrive at the scene of sudden accidents.

6.2 Traffic guarantee

6.2. 1 Appropriate means of transportation (which can be used in bad weather and bad road conditions) shall be provided to meet the needs of company leaders and personnel of relevant departments to rush to the site in time.

6.2.2 When the relevant departments have no vehicles or are short of vehicles, the production technology department will provide vehicles. The vehicle should be in good condition and ready for use.

6.2.3 The unit is responsible for the daily training and management (including safety training) of vehicle drivers.

6.3 Logistics Supply

The life service center is responsible for the logistics support of the emergency repair site, including food, drinks, heating (refrigeration) facilities and other necessities. When necessary, emergency headquarters is responsible for coordinating related matters.

6.4 unified repair personnel

The emergency office should know the personnel who can take part in accident emergency repair in the whole company, including the distribution of each unit, the number of personnel, contact information, traffic guarantee, etc. And you can call them at any time.

6.5 large-scale construction instruments

The emergency office shall uniformly grasp the distribution and status of large-scale construction machines and tools throughout the company, and can call them at any time. Such as work vehicles, lifting equipment, off-road vehicles and other machines and tools.

6.6 Spare parts under unified management

The production technology department should master a certain number of spare parts and be able to call them at any time.

7. Supplementary provisions

7. 1 This plan is formulated by XX Power Supply Co., Ltd., and the production technology department is responsible for the interpretation.

7.2 All units of the company shall, in combination with their actual conditions, formulate emergency plans for sudden production accidents caused by bad weather and set up emergency offices.

7.3 This plan is applicable to the case that bad weather does not constitute a large-scale power outage.

7.4 When the emergency caused by bad weather reaches the grade standard specified in each plan, the corresponding emergency plan shall be started.

7.5 Sudden accidents caused by other reasons shall be implemented with reference to this plan.

7.6 This plan is applicable to XX Power Supply Co., Ltd. and will be implemented as of the date of promulgation.

;