Current location - Recipe Complete Network - Catering training - Is there any impact on the quality of renovation in winter time?
Is there any impact on the quality of renovation in winter time?

It is perfectly fine to renovate normally in winter. Outdoor especially cold, indoor are above 20 degrees, renovation is no problem. In the south, the seasons are like spring, so you can renovate at any time of the year. Although the weather in the north is very cold, but never stop renovating in the winter. If the winter wood decoration, wood by the cold wind to collect dry moisture, at this time the combination of a good smooth surface, in later seasons, will not crack. So winter wood renovation is more suitable. Can be renovated all year round, my home renovation is carried out in the winter, winter decoration must be good insulation and ventilation, cold weather, close the doors and windows, hot weather, open the windows, to prevent cracking and adhesion of wood and paint, tiles are not firm.

Engineering team cost is low, now the cost of labor is higher than a year, in the winter construction and renovation work less, so the engineering team side should be able to save a little, if it is the next year, there will certainly be a different degree of rise. Worried about the deformation of wood, mainly worried about thermal expansion and contraction problems brought about by the end of the heating, worried about wood products will be with the temperature for thermal expansion and contraction and deformation or fracture and other phenomena. But as long as more attention is paid to the maintenance process and the transportation process, it is completely safe to decorate.

Because now we use indoor waterproof coatings are water-based environmentally friendly waterproof coatings, if the indoor temperature in winter is below freezing, then it will freeze, seriously affecting the quality of waterproofing, so again to remind you of the indoor temperature below freezing do not waterproof construction! Winter decoration is only affected by low temperature and dry air. General low temperature weather on the renovation of tiling and oiling has a certain impact on the construction of low temperature weather, putty, wall paint, cement, waterproofing will dry slower, this time as long as the patience of some of them will be no problem.

Winter construction will be equipped with antifreeze, water will be used below 80 degrees of hot water. Therefore, under normal circumstances, the temperature problem can be solved by means of construction. Southern winter, the temperature is not too low can be constructed. There is a heated room, the wall painting and framing project can also be relatively smooth, but the time to be postponed, because it is not possible to open the window for a long time to ventilate, the construction of moisture needs to be gradually dispersed out.