Current location - Recipe Complete Network - Catering training - How to apply for installation of rural charging pile
How to apply for installation of rural charging pile
In general, as long as the purchase of electric energy vehicles, some 4S stores will assist the owner on the submission of installation materials to the power supply bureau, at this time the need for the user to provide a copy of the identity card, the car charging conditions to determine the book, the village committee agreed to install the instructions and the parking space indicates.

Different cities have information differences

1, electricity user identification information;

2, electricity address property ownership ownership certificate;

3, such as entrusted to other people on behalf of the need to provide on behalf of the person's identity and authorization to a, the submission of the application and review materials

Power of attorney;

4, such as for the bank deductions need to submit the relevant electricity bills Payment information.

5, for the occupation of community public **** place of the project, such as community parking lot, etc., but also need to provide the owners' committee or property issued by the charging infrastructure construction of the consent letter.

6, such as only rented parking spaces, at the same time need to provide the consent of the owner of the parking space materials, owners of identity documents, as well as electricity bill guarantee, customer statement.

The required information must be provided in the original, as well as a copy of the original verified by the customer and signed by the customer, the enterprise and public institution customers in the copy of the signature and official seal. When handling the business, residential customers need to sign and confirm on the "electricity business list", and enterprise and public utility customers must be stamped on the "electricity business list".

Second, the installation of construction

After the review of materials, you can start the installation, but in accordance with the fast and slow will be affected by the conditions of the village and the location of the garage, any of which is different, the construction time there is a certain difference, for example, some only need two hours, while some may take a whole day to complete the construction.

Three, acceptance

After the installation is completed, it is necessary to go to the Electricity Bureau to report, and then by the staff of the Electricity Bureau to the site acceptance, acceptance, to the meter with a seal. Then the power bureau to make for the electricity card, and by the charging pile company to receive forwarded to the owner, or the owner himself to the power supply bureau to collect, so that it can be.

Legal basis:

"The Chinese People's **** and State Safety Production Law"

Article 29

Production and management units to adopt new processes, new technologies, new materials or the use of new equipment, must be aware of the safety and technical characteristics of their mastery, to take effective safety protection measures, and special production safety education and training for employees.

Article 36

The design, manufacture, installation, use, testing, maintenance, transformation and retirement of safety equipment shall conform to national standards or industry standards. Production and management units must carry out regular maintenance of safety equipment, maintenance, and regular testing to ensure normal operation. Maintenance, maintenance, testing should be recorded and signed by the relevant personnel. Production and management units shall not shut down, destroy directly related to production safety monitoring, alarm, protection, life-saving equipment, facilities, or tampering, concealment, destruction of their relevant data and information. Catering and other industries in the production and operation of units using gas, combustible gas alarm devices should be installed, and to ensure its normal use.