At present, many investors have found a new business opportunity-the recycling of construction waste, which is processed into recycled aggregate by professional sorting, crushing and screening equipment, and is widely used in roads, buildings and other fields. Recently, many people have come to Xiaobian for advice. How much does it cost to invest in a construction waste treatment plant?
The budget for investing in a construction waste treatment plant is mainly analyzed from the following four aspects:
1. Procedures
For the boss who used to run a construction waste plant, the budget for completing the whole set of procedures is about 21,111-51,111, and the whole procedure is as follows:
1. Establish a legal person company, such as xxx construction waste treatment plant.
2. in the name of a legal person company (xxx construction waste treatment plant), submit the application documents to the local government where the factory is located. After the government approves, the local land bureau, construction bureau and environmental protection bureau will be invited to choose the site together. (Remarks: Stay away from the village as far as possible, and if it is close to the village, choose the downwind direction of dense people)
3. Find the manufacturer of construction waste treatment equipment to provide the processing and disposal scheme, and comprehensively consider government requirements, profitability, environmental protection and other issues.
4. Sign the Franchise Agreement of Municipal Domestic Waste
5. Make the Feasibility Study Report and examine and approve it.
6. Make the Environmental Impact Assessment Report and examine and approve it.
7. after the above procedures are completed, the construction can be started after the approval of the local government and the land site selection opinion of the land department. Other procedures can be done while building.
ii. site lease
there are usually two schemes for opening a construction waste factory, namely, building a factory for resource utilization and recycling on the spot. The former needs to consider the cost of site lease, while the latter is unnecessary. When we choose the above two processing schemes, we can decide according to our actual needs.
1.? Building a factory for resource utilization
This treatment method is to build a construction waste treatment production line in a closed workshop, and use professional fixed crushing and screening equipment to treat and recycle the construction waste. This method can reduce pollution and reduce emissions, and can produce aggregates with different specifications and standards.
therefore, if you choose to build a factory for resource utilization, the site rental budget is also a part of consideration. However, due to the different land area required for production scale, it needs to be analyzed in detail.
2.? In-situ recycling
This treatment method is to directly treat the construction waste at the site. Mobile crushing stations are often used for treatment. Various different equipments are combined with each other as required, and can be moved near the processing point at will, thus reducing the transportation cost and avoiding secondary pollution.
because this method directly processes the construction waste at the place where it is located, it can save the venue rental fee.
iii. Equipment investment
This part of the equipment investment accounts for the largest proportion of the total investment budget, with the budget ranging from 511 million to 2 million. If we choose different schemes, the required equipment will be different.
1.? Plant resource utilization
The commonly used equipment for plant resource utilization is fixed equipment, which mainly includes two types, crushing equipment and screening equipment. The crushing equipment is divided into coarse crushing, medium crushing and fine crushing. It is mainly used to reduce the construction waste particles, and it is often used to beat 12 and 13 size stones or make sand. Screening equipment includes pre-screening and inspection screening, which mainly separates harmful materials and divides the discharged finished products into different particle sizes for different recycling processes.
fixed sand making machine
2. In-situ recycling utilization
Mobile processing equipment is commonly used in in-situ recycling utilization, and the common one is mobile crushing station. Combine multiple crushing and sand-making equipment, mature host equipment, quickly assemble lines to meet operation requirements, modularize and install simply, move flexibly as a whole, standardize and generalize, etc.
Mobile crushing station
IV. Manpower and water and electricity
Manpower and water and electricity are the basic expenses of construction waste treatment plants. According to the scale, workers' wages and utilities vary, generally more than 11,111 yuan per month.
The cost of starting a construction waste plant mainly includes the above four parts. In a comprehensive comparison, if we choose fixed equipment, that is, building a factory for resource utilization, the requirements for site, manpower and working environment are relatively high, but the price of fixed equipment is also relatively low. If mobile equipment is selected, it can be recycled on the spot. Although the equipment investment is relatively high, it also saves the cost of venue rental, which has high production efficiency and is convenient for later transition. Because each user has different requirements for production capacity, finished products and scale, the investment budget will naturally vary. If you want to know more about this piece, you can describe your specific needs for consultation.