Current location - Recipe Complete Network - Catering training - How to fill in the safety checklist for returning to work after the Spring Festival?
How to fill in the safety checklist for returning to work after the Spring Festival?
After the Spring Festival, the construction project safety checklist should be filled out according to the actual situation and the requirements of superiors. There are templates on the Internet that you can download yourself.

First, immediately carry out the inspection of safety production conditions for returning to work after the holiday. All construction and supervision departments should resolutely overcome the idea of paralysis and lax, and attach great importance to the construction safety after the Spring Festival. The construction unit shall, in view of the situation of the project under construction, formulate a detailed inspection plan for returning to work and conduct a comprehensive investigation of the potential safety hazards of its affiliated projects; The supervision unit shall review the inspection scheme submitted by the construction unit to ensure that the inspection content is comprehensive and the scheme is feasible, and follow up the rectification to ensure safety.

All newly resumed projects under construction must meet the conditions of safe production, pass the inspection and be signed by the project leader of the construction, supervision and construction unit before they can resume work. The signature data of conditions for safe resumption of production shall be filed as project safety data for future reference. Without the approval of the project shall not be unauthorized construction. At the same time, for projects that resume work after the Spring Festival, the technical and management personnel of the construction, supervision and construction units must take up their posts and do a good job in safety management in time. Any off-duty project leader (project manager) or project leader shall not resume work without authorization.

Two, strengthen the inspection of key links and key parts. First, the drainage measures of deep foundation pit support, the slope displacement of deep foundation pit should be comprehensively re-measured, and all kinds of pipeline trenches should be excavated in strict accordance with relevant technical specifications, and illegal soil accumulation along the pit side is strictly prohibited; The second is to strengthen the inspection of tall formwork support system, especially the strict inspection of open-air tall formwork. During the inspection, it is important to check the compactness of the foundation soil at the bottom of the formwork upright post, whether there is any gap during jack-up support, the verticality of the upright post, the setting and fixing of the sweeping rod, horizontal tie rod and bracing, etc. Third, all tower cranes, attached lifting scaffolding, hanging baskets and other construction hoisting machinery should be inspected and debugged by professionals before returning to work, and can only be put into use if they are qualified; Fourth, we should carefully check the fixing of cantilever beams of high-rise scaffolding, the laying of wall parts, safety nets and scaffolding; Fifth, it is necessary to check the fire safety of the construction site and staff quarters, focusing on whether the fire safety measures at the welding site and the inflammable and explosive goods warehouse are in place; Sixth, strengthen the safety inspection of construction electricity, conduct a comprehensive inspection of all accessories and distribution lines in the on-site distribution box one by one, and replace them in time if any damage or failure is found; Seventh, temporary buildings, protective sheds and fences after cold, rainy and snowy weather in winter. A comprehensive inspection will be carried out one by one to eliminate potential safety hazards in time.

Third, actively carry out safety education and training activities. Effectively improve the safety awareness of managers and operators, conscientiously implement the three-level safety education, strengthen the safety awareness and operational skills training for migrant workers who enter the market after returning to work, and improve the safety awareness and level of on-site operators. General contracting enterprises should strengthen the safety training for three types of personnel and special operations personnel. All construction enterprises should keep abreast of the ideological status of workers who have returned to their posts, and conduct safety education and training for new workers or workers who have changed their posts. Workers who have not received safety education and training are strictly prohibited from working at their posts.

Fourth, strengthen the supervision and inspection after the project resumes work. The construction departments of counties and districts should attach great importance to the construction safety management after the resumption of work during the Spring Festival, earnestly strengthen supervision and organize special inspections in time. If the hidden dangers are not checked as required, or the main management personnel of the project return to work without authorization, and the operators do not receive safety education before returning to work, they will be regarded as not meeting the conditions for returning to work, and immediately ordered to stop work for rectification.