1. Total construction area: 3 138 1 m2, total construction area: 30909 m2, five floors above ground and one underground, building height: 30.90m, green area:14200m2, square area: 5/kloc. Second, the main function layout of the floor is to prepare the underground equipment room, the main venue pool on the first floor of the parking garage, 8 small and medium-sized conference rooms in 16 of 82m2, the main venue pool on the second floor of 55m2 in small 8 and the conference rooms in 8 districts and counties in the main venue pool on the third floor of144m2. There are 8 conference rooms in the county * * * The fourth floor (west) has 139 1 multi-function hall, the press conference hall (east) covers an area of 635 square meters, and the VIP international conference hall has 349 seats on the third floor (Hall 6), Longwan Hall (Hall 5), Ruian Hall, Military Hall (Hall 2) and Military Hall.
The Great Hall of the People in Wenzhou is located on the east side of Guangming Bridge, Huiming Road, Wenzhou City. It was completed and put into use in 2003. It is a landmark building integrating modernization and intelligence.
Building area 1.800 m2, main venue: number of seats in audience hall 1, including 858 pool seats and 533 box seats. Abutment width is 2 1.5M, abutment height is 8.45M, abutment depth is 1 1.4M, and space height is 9.5m. The total area of the auxiliary station is 80M2. There are 2 dressing rooms (male 1, female 65438) with a total area of 100.86M2 and 8 stage suspenders/kloc-0, including 4 lighting suspenders. There are 348 lighting circuits, with large screen rear projection on both sides. GRANDMA2048 master control dimmer, MIDASL3000 mixer, 32 channels and 8200W power amplifier. The total electricity consumption of the theater is 239KW, and it is equipped with central air conditioning.