1, installed on the channel where oily sewage flows, and the sewage outlet is aimed at the oil-water separation zone.
2. The entrance of the grille can be connected with other equipment through pipes.
3. When installing, the oil-water separator must be adjusted to a horizontal position.
4. Before the first use, the equipment should be filled with tap water, and the water level regulating tank should be adjusted so that the top of the water level regulating pipe is at the same level as the upper edge of the oil spill tank.
5. The position of the water inlet pipe should keep a certain distance from the sundries separation box, so as to facilitate the removal of the sundries separation box.
6. Introduce oily wastewater, and adjust the water level regulating pipe again until the oil drainage pipe only discharges oil without drainage.
7. If the oil drain pipe position is too low, open the equipment cover plate and take out the oil with tools.
8. When draining oil, first open the oil valve, drain some water at the bottom, and then collect waste oil.
9. After the regulating tube is adjusted, don't touch it at will, which will affect the effluent quality.