How to write the inspection report?

? What are the specific formats? Below I will bring you a sample report on the inspection situation for your reference!

Supervision Report Fan Wenyi

Counties * * * districts * * and units directly under the municipal government:

From * * to * * *, the effectiveness inspection team of the Municipal Soft Construction Office and the Municipal creation mode Office will supervise the completion of creation mode tasks undertaken by counties * * * districts * *. According to the inspection, there are still some problems in * * * district of each county to varying degrees. The details are as follows:

Project progress

*** District

1. Renovation of industrial pollution sources

Sewage treatment facilities of XX Chemical Co., Ltd. are under construction, and civil works have been completed, which will be available in XX month. Xx city dye chemical plant, the enterprise is ready to move to xx industrial park, and the new factory building is under construction, which requires that it must be moved before the end of xx month.

2. Remediation of oil fume and dust

The Administrative Measures for Examination and Approval of Catering Industry was promulgated, and the catering industry with an area of more than 111m2 was required to install oil fume purification devices. At present, 211 oil fume purification devices have been installed.

there are 178 boilers in * * * of the whole region, 158 of which have been dismantled, and the rest are under work, and all of them are planned to be dismantled before the end of May.

*** Second * p>×× District

1. Renovation of industrial pollution sources

Dust removal and desulfurization facilities of××× Co., Ltd. have been put into operation; Xx steel pipe co., LTD., waste acid treatment facilities have been put into operation.

2. Remediation of oil fume and dust

At present, 44 oil fume purification devices have been installed in the whole region, and the newly approved catering industry is required to install oil fume purification devices. A preliminary plan has been made for boiler demolition.

3. Implementation of sewage treatment plant and construction of ×× pipe network

The sewage treatment plant processes 5,111 tons of sewage every day, and the influent concentration is about COD211, which basically meets the requirements. Xx pipe network and 211 meters long without construction, supervision is under construction, plan all through in early xx month.

4. landfill site closure project

the landfill site has been closed and is now being afforested.

*** San * *××× District

1. Renovation of industrial pollution sources

××× Foundry Co., Ltd. has no pollution discharge permit; Xx paper packaging materials co., LTD. District * * * arrangement of demolition, is under discussion.

2. Remediation of oil smoke and dust

Newly approved mandatory installation of oil smoke purification devices in catering industry, and 24 oil smoke purification devices have been installed at present;

113 boilers should be dismantled in the whole region, and 111 boilers have been dismantled. Among the boilers that have not been dismantled, Tongchunyu bathroom has completed the steam pipeline transformation and changed to direct gas supply; Tianhe Hotel, boiler renovation is being implemented.

3. Comprehensive improvement of urban environmental sanitation

The water quality of the p>×× River is poor and smelly; There is domestic garbage piled up under the road and bridge of XXX River.

*** Four * * * * District

1. Renovation of industrial pollution sources

The new sewage treatment facilities of XXX Paper are under construction, which is planned to be completed at the end of XXX, and passed the acceptance in the first ten days of XXX; Modern dyeing and bleaching wastewater treatment project has been basically completed, and has applied to the Municipal Environmental Protection Bureau for acceptance.

2. Remediation of oil smoke and dust

At present, 46 oil smoke purification devices have been installed, and the second batch of 31 catering units are being fully promoted to install oil smoke purification devices.

There are 115 boilers that should be dismantled in the whole region, 9 of which have been dismantled, and 11 have been shut down. The rest are difficult to dismantle because there is no central heating pipeline, and the direct supply of hot water is being investigated in this region.

3. Implementation of sewage treatment plant and construction of pipe network

At present, the water inflow of sewage treatment plant only reaches 51% of the design capacity, and the water inflow and the concentration of water inflow can not meet the requirements, and the sewage interception pipe network is not in place. The construction of No.1 pump station involves the demolition of 8 households, and 6 households have been demolished at present. According to the introduction of the deputy head of XX, the other 2 households are applying for court enforcement. During the inspection, the deputy district chief of XX said that the task would definitely not be completed by the national creation mode in June according to the current progress.

4. Closure project of landfill

At present, the closure project has basically ended according to the requirements of EIA, and the greening has not yet been carried out, and no greening construction was seen during the inspection.

5. Comprehensive improvement of urban environmental sanitation

There is no enclosure at the demolition site, and there is a lot of garbage in the back alley. During the inspection, some people are dumping construction garbage at the roadside of the landfill.

*** Five * * * Development Zone

1. Renovation of industrial pollution sources

The environmental protection department is urging XXX cement plant, thermal power plant and XXX key pollution source manufacturers to implement various environmental protection management systems.

2. Remediation of oil smoke and dust

71 boilers of various types were shut down and dismantled in the whole region.

3. Construction of sewage interception pipe network

The construction of pipe network in the old district is basically completed, and it is planned to be put into operation in early May, and the sewage interception pipe network in the new district has been completed.

4. Comprehensive treatment of urban environmental sanitation

The water quality of the XX river is poor, and there are floating objects on some rivers and garbage beside the river.

xuexila

xx, xx, XXXX

Supervision Report Fan Wener

According to the arrangement of the leading group for the efficiency construction of the town organs, the town of performance of office began to carry out special supervision on the efficiency of the organs from XX. The inspection is now reported as follows:

1. Basic information:

1. Work efficiency has been further improved. The special supervision activities on the efficiency of organs have promoted the system construction and behavior management of various functional departments, enhanced the efficiency consciousness of cadres and workers, improved the subjective initiative of work and improved the service level. Judging from the spot check, all key tasks are progressing smoothly. The relevant offices, stations and institutes did not relax their focus on key tasks, the leaders took the lead, all the staff worked hard, grasped the key points of work, strengthened work measures, and successfully completed all the key tasks undertaken in sequence. In particular, family planning, high-speed expropriation and demolition, new rural cooperative medical care, winter rape planting, and party and government services have achieved remarkable results.

2. Work discipline has been further strengthened. All offices, stations and institutes of government agencies can strengthen system construction, strengthen internal management, standardize work behavior and investigate serious responsibilities in accordance with relevant regulations. The staff of government agencies have changed their work style and enhanced their sense of responsibility and discipline. For example, the Agricultural Office fills in the whereabouts of the staff on the whereabouts card, which is convenient for handling things. Judging from the inspection situation, the violation of work discipline at work has been significantly reduced.

3. The institutional environment is further beautified. All offices, stations and institutes have cleaned the health responsibility area as required, which has improved the office conditions and beautified the working environment. The office is clean, the windows are bright, and the overall environment is obviously improved.

Second, the problems found in the inspection

1. The situation of loose work still exists. A few cadres and workers still have breakfast in the canteen at 8: 31, and the masses can't find anyone until after 8: 31. A few government officials still do things unrelated to work during working hours;

2. Internal management is lax. The heads of some offices, stations and offices are not clear about the whereabouts of the staff during working hours.

according to the inspection, the rewards and punishments are as follows:

1. 3 people are late for work. Disposition: Deduct bonus of RMB 111 each.

2. Outstanding performance in the work, each with a reward of 111 yuan.

Third, work suggestions

We should focus on strengthening three kinds of consciousness:

1. Strengthen the sense of responsibility, start with the attendance system, and focus on overcoming the word "lazy" that is not good at doing the job, but willing to do it, so as to further strictly enforce work discipline and responsibility;

2. Enhance institutional awareness, conscientiously implement various systems for the efficiency construction of organs, earnestly improve the style of organs, and strive to improve the service level;

3. Enhance the awareness of supervision, strengthen internal management, and ensure the effectiveness of all work in efficiency construction.

the efficiency construction of organs is a long-term and continuous work, and it is a real work, which can't stay in form or go through the motions. To this end, the leading group for the style and efficiency construction of town organs requires that all offices, stations and institutes should further improve their understanding of the significance of efficiency construction, earnestly perform their duties, strengthen measures, work hard, ensure practical results, and solidly promote the healthy development of the efficiency construction of town organs. In the next stage, the leading group for the efficiency construction of town organs will adopt irregular, flexible and diverse forms of supervision, and make unannounced visits. The verified phenomena and problems that are contrary to the efficiency construction will not only serve as an important basis for daily supervision and evaluation, but also be severely punished according to regulations. People and things that seriously undermine the efficiency construction will be seriously investigated and dealt with, and will never be tolerated.

Xuexila

xx, xx, XXXX

Fan Wensan

The state taxation bureaus of * * * counties and cities, and the internal organs, directly affiliated institutions and institutions of the municipal bureau:

In order to conscientiously implement the work arrangements of the municipal bureau party group, ensure the smooth implementation of government decrees and promote the construction of "eleven projects", the municipal bureau The situation is now reported as follows:

1. Overall situation

Through supervision, we believe that all units have been able to implement the "four evaluation activities" files issued by the Municipal Bureau of Work Style and Efficiency, the rectification of work style and discipline, and the implementation of "striving for excellence". First, leaders attach importance to and carefully organize. All units have set up corresponding leading groups to strengthen the leadership of the four activities and ensure that all activities are carried out effectively and orderly. The second is to fully mobilize and advance step by step. According to the contents of the archives, overall planning and scientific arrangement are basically achieved. This article is from data management download. The third is to learn and check, and check and change. After the meeting of automatic workers in each unit, they can persist in inquiring about problems in their study and rectify them in time. The fourth is to establish a system and strictly check attendance. All units have established attendance and out-of-town registration systems, and the commuting system is well implemented. The staff in the hall are well dressed and tidy, with good hygiene. The fifth is to implement the plan and implement the policy. Each district bureau strictly implements the plan and completes the tax task in a good situation; The preferential tax policies have been basically put in place, and the deferred tax payment has been handled according to the procedures; The tax storage rate and declaration rate have reached the requirements of the provincial and municipal bureaus.

ii. shortcomings

the inspection found that there are still some shortcomings in each unit. First, daily attendance needs to be further strengthened. There are some phenomena in some units, such as a few people being late for work, taking time off without a leave slip, and going out to work registration is too simple. Second, although the tasks of building a clean and honest government in 211x have been decomposed, they are not closely integrated with the actual situation of the unit, and there is no specific time limit for completion; Individual units did not formally write in the document processing. This article is from data management download. Third, in some units, the work style efficiency construction, work style discipline rectification, "striving for Excellence" and the implementation of the "four evaluation activities" of the municipal party Committee and the city are not detailed, and the work of the unit is not tight, and the study and discussion are not deep and thorough. The benchmarking management of "Eleven Projects" lacks annual implementation opinions and has not fully entered the implementation stage. Fourth, the study records and meeting records are incomplete and the contents are not detailed. Fifth, the hygiene of each unit needs to be further strengthened, and there are cases such as untidy arrangement of things in the office and dust on the desktop.

Third, several requirements

First, leaders should attach importance to and clarify responsibilities. Leaders of all units should attach great importance to it and earnestly shoulder the leadership responsibilities of building work style and efficiency, rectifying work style and discipline, "striving for Excellence first", "four evaluation activities" and "creating five cities in succession". Functional departments should earnestly perform their duties, further refine various plans and work measures, and ensure the steady and solid progress of various activities.

Second, we must be strict in discipline and pay close attention to implementation. All units should seriously inquire about their own shortcomings, rectify the problems found by the inspector group in time, at the same time, further strengthen work discipline, improve the system of leave and going out to register, increase attendance assessment and supervision, and ensure that there is no violation of discipline.

thirdly, we should strengthen supervision and serious accountability. All units should clearly supervise and supervise personnel, increase the intensity of attendance assessment and supervision and supervision, and severely deal with units and individuals that violate work style and efficiency and unit rules and regulations.

Fourth, monthly supervision and timely feedback. Each unit shall supervise and supervise on a monthly basis and report the results of supervision and supervision to the Party Office/Supervision and Supervision folder of the Municipal Bureau through FTP in time.

211x x month x day