Does LED lighting workshop need fire hydrant system and self-spraying? Length 23.4, width 9.24, height 13.4m, fourth floor ~ I checked the specifications and thought that only a fire extinguisher was
Does LED lighting workshop need fire hydrant system and self-spraying? Length 23.4, width 9.24, height 13.4m, fourth floor ~ I checked the specifications and thought that only a fire extinguisher was needed. In order to enable the engineering department to complete and exceed the indicators issued by the hotel in 2008, the equipment management has reached a new level, and the quality and technical level of department personnel have been greatly improved. Establish and improve equipment files, and cultivate an all-round back office system with multiple functions, multiple posts and multiple salaries. In order to make the equipment run safely, energy-saving and efficiently, this scheme is specially formulated.

I. Department structure and staffing

1, manager 1 → supervisor 1 → data, quality inspection 1 → operation 5 → general worker 7, department capacity 15.

Engineering manager

Responsible/in charge

Foreman information, quality inspection

Operating post

Maintenance post: elevator, weak current audio, wood paint, mechanical hardware, strong electricity, water heating.

2. Pay according to the post, the basic post index of each person is 1.0, the minimum is not less than 0.8, and the maximum is not more than 1.5 (refer to the post setting standard for post competition).

3. The post competition is conducted by superposition method, and the competitive position with its own advantages is selected, but it must meet the basic conditions. Those who do not have the post conditions cannot participate in the post competition.

Second, the conditions for competing for posts

1, current staff of engineering department, hotel staff and social technicians.

2, love the party, love socialism, good professional ethics.

3. Hold the relevant post operation certificate.

4, with forms, equipment maintenance plan and other cultural level.

5. Have the practical operation ability of relevant positions.

6. Good health, age 17 years old, under 50 years old.

Third, the rules and time limit for post competition

1. Post-Games management team: team leader

deputy group leader

2. Post competition procedure: On-the-job personnel of the engineering department enter the post competition according to their own posts; Foreign personnel need to carry out capital verification and related documents, and enter the next step after passing the examination. Different positions have different test questions: theoretical defense accounts for 30 points and practical operation accounts for 70 points. After the comprehensive assessment by the post competition management team, the post will be decided according to the individual's willingness to choose the post.

3. Duration: The post competition time will be conducted irregularly according to the work situation of the department. If there is any deviation in post indicators after trial operation, it will be adjusted in the next round of post competition. After the games, the management team comprehensively evaluated the post-games personnel, divided the corresponding posts, and then entered the posts to perform their duties. Those who fail to pass the examination of departments and supervisory committees will be dealt with by adjusting positions and employee codes.

Fourth, post setting

manager

Responsibilities: Implement the annual departmental plan and economic indicators issued by the general manager. Scientifically and reasonably set posts, set the annual work target of the department, implement the medium and long-term maintenance plan of facilities and equipment, assign daily, weekly, monthly and annual maintenance responsibilities to people, and implement the listing system for major equipment maintenance responsibilities. Establish and improve equipment files, formulate energy-saving operation plans, quantify the working standards of various positions in the department and the detailed rules for the implementation of employee assessment; Check weekly, go to the site for major equipment maintenance, and plan equipment maintenance by yourself. Be loyal to your duties, be strict with yourself, and supervise and lead this department out of a new way of equipment management. Directly report to the competent vice president for the work of the department.

Responsible/in charge

Job description: Assist the manager in daily scheduling, and do a good job in equipment maintenance management of all departments of the hotel and equipment management of the exhibition center. As the trainer of the department, the administrative manager makes various training plans. Go to the site for emergency maintenance, formulate and sort out small, medium and large equipment maintenance plans and spare parts plans, sort out and fill in equipment maintenance records, collect equipment data, and assist the manager in archiving facilities and equipment. Responsible for the inspection and assessment of work standards of each post. Supervise subordinates to strictly operate procedures to ensure safety and no accidents. Lead by example and report directly to the manager for the supervisor's work.

Data and quality inspection post index 0.7

Job Description: Proficient in the application of computer office software and engineering management software, with a certain level of English and a certain electrician foundation. Assist the manager to take charge of the daily affairs of the department, accept orders and assign tasks, copy water and electricity meters, collect and archive department reports, facilities and equipment data, evaluate and inspect department employees, check the working standards of each position, check post hygiene, gfd and study and training plan. Supervise and inspect the daily, weekly, monthly, quarterly and annual maintenance plans of facilities and equipment. Purchase and application of maintenance department products. Management of public tools: recording, maintaining, placing, borrowing and returning records are real-time and accurate. Collect and fill in the monthly data of the department in time according to the requirements of the supervisory Committee, and assist the operation of the computer room during the day. Responsible for the reception and communication of relevant cooperation units and the communication between departments. Set an example, keep a secret, do not disclose data and information of any department and hotel, and be directly responsible for the work of this position to the manager.

Leading post index 0. 1

Job description: Be familiar with the performance of the operating equipment in the computer room, master the operating procedures of each equipment, and guide the team members to standardize and strictly operate the procedures. Be able to make daily maintenance plan of equipment, collect and sort out operation records, and make reasonable duty and scheduling plan. Familiar with the parameters and performance of facilities and equipment in various areas of the hotel, master the maintenance technology of facilities and equipment, and lead the team to accurately judge the equipment failure and properly handle it. Be able to make daily, weekly and monthly maintenance plans for major facilities and equipment, as well as the quality plan of the maintenance department. Emergency treatment of sudden failure of major equipment, and comprehensive maintenance and guarantee of key equipment supervisors in important parts in a planned and step-by-step manner. By analogy, directly report to the supervisor for the work of the team.

V. Operation on duty

Post indicator: 0.6

Job responsibilities: 1. Be familiar with the performance of operating equipment in this position, hold relevant certificates, and strictly abide by operating procedures. Abide by the equipment operation and operation ticket system formulated by the department.

2, skilled operation of equipment start-stop, according to the operation plan formulated by the department, make the equipment run in the best state, save energy and reduce consumption.

3. When entering the work, wear labor protection articles and use qualified tools.

4, accept the correct instructions, correct real-time fill in the operation record, found abnormal report quickly.

5. The working voltage, current, temperature, pressure and sound of the equipment can be accurately controlled within the standard range, and the working voltage, current, COS¢, suction and exhaust pressure of the main engine, pipeline pressure and inlet and outlet water temperature can be recorded every hour.

6, do 6 minutes to send electricity and quickly turn on the water pump air conditioner.

7, each shift to do daily maintenance for each running equipment, make the equipment is always in good running condition.

8, the personnel on duty to do regular inspection, listen, smell, touch, plug with and without leakage phenomenon, can find the initial fault in advance.

9. Keep the post and computer room clean when on duty, and achieve "three cleanness": equipment cleaning, system piping cleaning and computer room cleaning.

10, each shift will check the piping system of Tianhu Building and Tinghu Building in the trench, and make records.

1 1, which has certain equipment maintenance ability and cooperates with emergency maintenance in the middle and late shifts. Maintain the equipment responsible for this position according to the standard.

12, obey the command, actively participate in various activities of the department or hotel, and constantly learn and improve the technical level.

13, strictly abide by the handover system, arrive at the post fifteen minutes in advance, and make the above records. If the operating equipment is abnormal or faulty and cannot be handed over, it must be handled together or reported to the superior for approval.

14, be loyal to your duties and keep secrets. Do not disclose any operation data and equipment data; Non-duty personnel are not allowed to enter the machine room area, and maintenance personnel must have a maintenance plan to enter. If there is a visit, it must be approved by the manager and carried out according to the scheduled route under the leadership of the supervisor. Photographs and videos are not allowed during the visit. After the visit, people must be counted and recorded.

15. Make the daily, weekly and monthly maintenance plan of the equipment in charge, and report the work of this position directly to the foreman.

Division of facilities and equipment maintenance for each post:

Position indicator of position A: 0.9 1

1, 500 kw diesel engine 0. 1

2500 kW generator 0.06

3. Power generation panel, storage battery and charging 0.0 1

4, air conditioning system water pump 0.0 1.

5, fire sprinkler pump 0.02

6. Fire hydrant pump 0.02

7. 0.0 1

8. Roof expansion tank 0.0 1

9. Two water collectors and valves 0.0 1

10, 1 hot water irrigation 0.0 1

1 1, two water collection pumps and control system 0.0 1

12, hot water tank, hot water internal circulating pump, hot water system pipes, valves, insulation and accessories 0.02

13, cables, water supply and drainage pipes, fire-fighting pipes and valves in the trench from the machine room to the exhibition center 0.02

Post index: 0.3 1

Post indicator of post B: 0.92

1, 0.03 on both sides of the fire control panel.

2. Water central air conditioner LED liquid crystal display control panel 5 0.05

0.03 of 800KVA main transformer

4. 1250KVA main transformer, 0.03

5, microcomputer control high voltage distribution cabinet 5 0.04

6, microcomputer control DC panel A0.02.

800KVA transformer 0.03

8. 0.03 for 5 sets of high-voltage distribution cabinets in the Convention and Exhibition Center

9, DC screen two 0.03

10, 1000KVA main transformer 0.03

Post indicator: 0.32

Position indicator for position c: 0.88

1, 0.03 surface 6 of low-voltage distribution panel of Tianting Lake building system

2, high voltage junction box 0.0 1

3, water central air conditioning No.4 host 0.02

5. 1 Lake Pump 0.0 1

6. Air conditioning system No.2 water pump 0.0 1

7. 1 Hot Water Pump 0.0 1

8, air-cooled heat pump No.2 host 0.04

9, air cooling system No.4 and No.5 water pump 0.02

10, 0.0 1

1 1, 0.02 for diesel boiler system

12, piping, valves, insulation and accessories of lake water system 0.03

13,0.04 underground drainage system of machine room

14. Cable, water supply and drainage, fire-fighting pipes and valves in the trench from the machine room to Tianhulou 0.03 Post index: 0.28.

Post d Post indicator: 0.89

6 side of low-voltage distribution panel of water source power system 1, 0.03

2, 1 water source host 0.03

3, water central air conditioning No.3 host 0.02

4. Air conditioning system water pump No.3 0.0 1

5, No.2 hot water pump 0.0 1

6, hot water frequency conversion control cabinet 0.0 1

7, air-cooled heat pump 1 host 0.04

8. No.3 water pump of air cooling system is 0.0 1.

9. Air cooling system pump control cabinet 2 0.0 1

10, plate heat exchanger No.2 0.0 1

1 1, water system piping, unpopular, water source air conditioning system insulation and accessories 0.06.

12, 0.05 for the cable, water supply and drainage, fire-fighting pipes and valves in the trench from the machine room to Tinghu Building.

Post indicator: 0.29

Post E Post indicator: 0.89

7 1, 0.03 of low-voltage distribution panel of convention and exhibition center

2, water source heat pump No.2 host 0.05

3. Air conditioning system No.4 water pump 0.0 1

4. 1 0.0 1

5, cold water pump frequency conversion control cabinet 0.0 1

6. Water pump control panel on both sides of water source heat pump 0.02

7. Electronic descaler 0.0 1

8. System water processor 0.0 1

19, cyclone desander 0.0 1

10, 0.0 1

1 1, lake pump control cabinet 0.02

No.2 water pump of air cooling system12,0.01

13, four hot water internal circulation pumps 0.03.

14, 1 plate heat exchanger 0.0 1

15, 0.02 pipes, valves and accessories of fire water system in engine room

16. Cable, water supply and drainage, fire-fighting pipeline and valve in the house management ditch from the machine room to the lake water pump 0.03 post index: 0.29.

Post indicator of post F: 0.94

8 1, 0.03 of low-voltage distribution panel of convention and exhibition center

2, central air conditioning control computer and printer 0.0 1

3. 0.0 1 for pump control cabinet II of convention and exhibition center.

4. Low-voltage switchboard 0.03 on face 6

5, No.2 cold water pump 0.0 1

6.2 and 3 plate heat exchangers 0.02

7, air-cooled heat pump No.3 host 0.03

8. Air cooling system 1 No.0 water pump1

9. Two water supply pumps in the Convention and Exhibition Center 0.03

10, and all pipes, valves, insulation, pressure gauges and accessories behind the main valve of the air-cooled heat pump system are 0.06.

Post indicator: 0.24

VI. Maintenance

Job responsibilities: 1. Familiar with the present situation and performance of hotel facilities and equipment.

2, have more skilled operation and maintenance skills, strictly abide by the operating rules, and abide by the department of equipment maintenance and hot card system.

3. When entering the work, wear labor protection articles and use and care for tools according to the specifications.

4. Accept the correct instructions. Can accurately judge and quickly deal with equipment failures.

5. Don't replace what can be repaired, and don't use inferior parts.

6. Actively coordinate with * * * to complete larger maintenance tasks.

7. Actively participate in various activities of hotels and departments, study hard and constantly improve maintenance skills.

8. Obey the deployment, bear hardships and stand hard work, and handle emergencies without remembering personal gains and losses. 9. Responsible for equipment maintenance, which is both division of labor and cooperation, loyal to their duties and confidential, and shall not disclose any equipment data to the outside world.

10, strive to do a good job of regional facilities and equipment maintenance, and do a good job of maintenance aftermath to ensure the safe, energy-saving and effective operation of equipment and facilities.

1 1. Abide by the employee code, treat guests politely, and the facilities and equipment are in good condition of 95%.

12, the direction of daily maintenance, fill in the maintenance dynamic column, and report the faults that the equipment responsible for this position can't handle immediately.

13, daily maintenance should be given priority, and all links such as receiving orders, inspecting goods, fitting, repairing, signing, recording and reporting should be done well.

14, do a good job in post and computer room sanitation, and achieve "three cleanness": clean equipment, clean system pipes and clean computer room.

15. Make the daily, weekly and monthly maintenance plan of the equipment in charge, and report the work of this position directly to the foreman.

Division of equipment maintenance for each post:

Post setting: the job content of each post is the daily, weekly, monthly, quarterly and annual maintenance of the designated area and system; The cleaning standards of subordinate equipment and places refer to the post work standards of the department, and the work quality inspection is carried out according to the post evaluation rules.

Electrical class a

Weak current A post: post index: 1.2

2. Post index of monitoring system (Tianhu Building and Tinghu Building): 0. 1.

3. Post index of door lock system (Tianhu Building, Tinghu Building and Cuihu Building): 0. 15.

5. Work index of passenger control system (network, software, switch, server): 0. 1.

6. Postal index of voice telephone system (all telephones in the library): 0. 15.

7. Indoor equipment and sanitation of weak current computer room, computer maintenance of library, IP network system, wine pipe network system (software maintenance, data backup, photoelectric exchange, distribution frame, server, terminal): 0.2.

8. Operating index of video signal system (amplifier, receiver, set-top box, branch and terminal): 0. 1.

9. Operation and maintenance of conference audio-visual system (transmitter, projector, mixer, audio source, recorder, power amplifier, speaker): 0.4.

Weak B post: post index: 1.5

10, job index of professional stage sound system operation and maintenance (theater: sound source and peripheral equipment, microphone, mixer, front and rear amplifiers, speakers): 0.4.

1 1, professional stage lighting system operation and maintenance (theater: power distribution cabinet, silicon box, console, computer light console, light rack lifting equipment, computer light system lamps, dimming light system lamps) post index: 0.4.

12. Operation and maintenance of professional conference video system (multi-function hall, People's Hall, CPPCC hall, VIP room, Yushui, Fenyi, Gaoxin and Fairy Lake) conference microphone, conference voting host, public address host, tape recorder, sound box, computer imaging system, projector, LCD and LED screen: 0.5.

Class b 1 1, the first and second floors of the theater, the fire center, the distribution panel and cables of the exhibition hall; Fire fighting, water supply and drainage, air cabinets, HVAC pipes and valves. Work index: 0.2.

Electrical and HVAC class b

Maintenance post c: post index: 1. 15.

Class A 1, Tianhu Building, Tinghu Building, Cuihu Building and Exhibition Center (automatic fire alarm system, broadcasting system, fire telephone and fire linkage system) post index: 0.2.

1, power distribution cabinets and panels (main desk, fire control center, business center, shopping mall and teahouse) in lobby, atrium, east and west machine rooms on the first floor of Tianhu Building; Fire fighting, water supply and drainage, air cabinets, HVAC pipes and valves. Work index: 0.2.

2. Rooms, walkways, atriums, power distribution panels and cables on the second and third floors of Tianhu Building; Fire fighting, water supply and drainage, air cabinets, HVAC pipes and valves. Work index: 0.2.

3. The large conference rooms on the second and third floors of Tianhu Building, the distribution panel and cables of the air-conditioning machine room; Fire fighting, water supply and drainage, air cabinets, HVAC pipes and valves. Post index: 0. 15.

7. Emergency maintenance of passenger control system hardware in Tianhu Building. Post index: 0. 15.

18, positioning of submersible pump and buoy in Ertaihu Lake. Post index: 0. 1.

20. Parking lot lighting. Post index: 0. 1.

2 1. Mingzhu Road Lighting. Post index: 0. 1.

Maintenance post d: post index: 1. 1.

2. Fire shutter and shutter motor in the atrium of Tianhulou. Work index: 0.2.

4. Rooms, walkways, power distribution panels and cables on the fourth and fifth floors of Tianhu Building; Fire fighting, water supply and drainage, air cabinets, HVAC pipes and valves. Work index: 0.2.

5. Rooms, walkways, power distribution panels and cables on the sixth and seventh floors of Tianhu Building; Fire fighting, water supply and drainage, air cabinets, HVAC pipes and valves. Post index: 0. 15.

6, Tianhulou roof distribution panel, cable, exhaust fan; Fire pool and pipeline, water supply and drainage, air cabinet, HVAC pipeline, valve, expansion tank. Post index: 0. 15.

19. Lighting system of Tinghu Building (including bridgehead lights and lampposts). Work index: 0. 1.

22. Illuminate the outline of Tianhu Building and project lights on the roof. Post index: 0. 1.

23. Tianhulou Square Lighting (including post lights and square floodlights). Post index: 0. 1.

24. Other lighting. Post index: 0. 1.

Maintenance e-post: post index: 1. 15.

Grade A 4. Post index of elevator system (Tianhu Building, Tinghu Building, Convention and Exhibition Center Machine Room, hoistway): 0.25.

9. Switchboards and cables in all guest rooms and computer rooms of Cuihu Building; Fire fighting, water supply and drainage, wind cabinet, heating and ventilation pipeline, valve. Post index: 0. 15

12, distribution panel and cable of air-conditioning room on the second floor of convention and exhibition center; Fire fighting, water supply and drainage, wind cabinets, HVAC pipes and valves. Post index: 0. 1.

13. Air conditioning cabinets, air supply and exhaust cabinets, sewage pumps, power distribution panels and cables in the air conditioning room at the bottom of the stage; Fire fighting, water supply and drainage, air cabinets, HVAC pipes and valves. Work index: 0.2.

14, six exhaust hoods are sent from east to west in the theater and exhaust hoods in the multi-function hall. Work index: 0. 1.

15, distribution panels and cables on the first, second, third and fourth floors in the back area of the stage; Fire fighting, water supply and drainage, wind cabinets, HVAC pipes and valves. Post index: 0. 1.

16, multi-function hall, projection hall, fish hall, VIP room and distribution hall, power distribution panel and cables; Fire protection, water supply and drainage, air cabinets, HVAC pipes and valves; Exhaust fan for toilet. Work index: 0. 1

17, the first floor of Gaoxin CPPCC National People's Congress Exhibition Center, Fairy Lake, central exhibition hall, household central air conditioning, power distribution panel, cables and exhaust fans; Fire fighting, water supply and drainage, air cabinets, HVAC pipes and valves. Post index: 0. 15.

Hardware and decoration class c

Maintenance post f: post index: 1. 1.

Class B 10, daily facilities and equipment maintenance of Houhu Building, and post index of all facilities and equipment in barber shop and swimming pool: 0. 1.

1. Sticking index of all glass doors and windows, handrails, bathroom partitions and mechanical hardware in the museum: 0.2.

3. Valves and accessories, porridge carts, linen carts, luggage carts, greeting cards, spittoons, umbrella stands, metal products in pipes and ditches. Job index: 0.25.

4. The job index of kitchen range, cooking fume system with water, sink, faucet, water supply and drainage pipeline, grease trap, counter and freezer (Tinghu Building, Convention and Exhibition Center) is 0.25.

8. Monitor cables of all guest rooms, lunch boxes, Duomei Hall, Yin Di Hall, Jingboxuan Hall, Longpan Hall, power distribution panel and computer room; Fire fighting, water supply and drainage, air cabinet, heating and ventilation pipeline, valve. Post indicator: 0.3

Maintenance post g: post index: 1.3

5. All doors, door covers, mechanical locks, ceiling maintenance, furniture, skirting boards, wood products, window covers and floors of the dining room. Work index: 1.0.

7. Lobby, public areas, walkways (walls, ceilings), floors, wall tiles and granite in the museum. Work index: 0.3.

Maintenance H post: 6 people. Latex and paint in all areas of the museum, room wallpaper, post index: 1.0.

Engineering Department 2008/ 1/3 1

Modified on February 2008/14

Second revision on February 20, 2008

It was revised three times on March 2, 2008.

It was revised four times on March 9, 2008.

March 2008 +0 1 five revisions.

Note: 1. This draft is a discussion draft, which will organize a number of experienced technicians to make a more reasonable adjustment to the division of the number of post-responsible equipment. After adjustment, according to the principle of different positions and different salaries, set each position indicator as the actual value. Encourage multi-skills and pay more. After the scheme is determined through discussion, there will be matching work standards and evaluation rules to evaluate the work of each post, and the post index is 1. If the assessment does not deduct points, the basic monthly salary is 1 100.

2. Employees can choose according to their own specialties and specialties. At present, the engineering department is divided into two parts, one is the operation of the computer room and the other is the maintenance of equipment. Each person can choose one or more positions, and the salary is calculated according to the position. The Engineering Department will conduct quality inspection in the whole process according to the detailed rules of post evaluation, and evaluate the post salary and employee's work performance with the integral system. Those who fail to pass the examination for two consecutive months will leave their posts automatically.