What should I do if I am fined by the environmental protection department for unqualified sewage treatment?
The best way to avoid it is not to discharge sewage at will. If our company has no ability, we can find a third-party sewage treatment company to deal with it.

According to the Regulations on Urban Drainage and Sewage Treatment:

Forty-second prohibited from engaging in the following activities that endanger the safety of urban drainage and sewage treatment facilities:

(a) damage and theft of urban drainage and sewage treatment facilities;

(two) drilling and blocking urban drainage and sewage treatment facilities;

(three) to discharge or dump toxic, flammable, explosive and corrosive waste liquid and waste residue into urban drainage and sewage treatment facilities;

(four) dumping garbage, muck, construction mud and other wastes into urban drainage and sewage treatment facilities;

(five) the construction of buildings, structures or other facilities that occupy urban drainage and sewage treatment facilities;

(six) other activities that endanger the safety of urban drainage and sewage treatment facilities.

Article 47 If, in violation of the provisions of this Ordinance, the competent department of urban drainage issues a permit for discharging sewage into the drainage pipe network to drainage households that do not meet the statutory conditions, or refuses to issue a permit for discharging sewage into the drainage pipe network to drainage households that meet the statutory conditions, the directly responsible person in charge and other directly responsible personnel shall be punished according to law; If the behavior of the directly responsible person in charge and other directly responsible personnel constitutes a crime, criminal responsibility shall be investigated according to law.

Forty-eighth in violation of the provisions of this Ordinance, the construction unit or the construction unit will connect the rainwater pipe network and the sewage pipe network in the rain and sewage diversion area, and the urban drainage department shall order it to make corrections and impose a fine of 50,000 yuan to 654.38 million yuan; If losses are caused, it shall be liable for compensation according to law.

Article 49 If, in violation of the provisions of these Regulations, drainage units and individuals within the coverage of urban drainage and sewage treatment facilities fail to discharge sewage into urban drainage facilities in accordance with relevant state regulations, or discharge sewage into rainwater pipe networks in rain and sewage diversion areas, the competent department of urban drainage shall order them to make corrections and give them a warning; If it fails to make corrections within the time limit or causes serious consequences, the unit shall be fined between 654.38+10,000 yuan and 200,000 yuan, and the individual shall be fined between 20,000 yuan and 654.38+10,000 yuan; If losses are caused, it shall be liable for compensation according to law.

Article 50 If, in violation of the provisions of this Ordinance, drainage households discharge sewage into urban drainage facilities without obtaining a drainage pipe network sewage permit, the competent department of urban drainage shall order them to stop the illegal act, take control measures within a time limit, and reissue the drainage pipe network sewage permit, and may also impose a fine of not more than 500,000 yuan; If losses are caused, it shall be liable for compensation according to law; If a crime is constituted, criminal responsibility shall be investigated according to law.

In violation of the provisions of this Ordinance, the drainage households do not discharge sewage in accordance with the requirements of the permit for discharging sewage into the drainage pipe network, and the urban drainage department shall order them to stop the illegal act, make corrections within a time limit, and may impose a fine of not more than 50,000 yuan; If serious consequences are caused, the license for discharging sewage into the drainage pipe network shall be revoked, and a fine of not less than 50,000 yuan but not more than 500,000 yuan shall be imposed, which can be notified to the society; If losses are caused, it shall be liable for compensation according to law; If a crime is constituted, criminal responsibility shall be investigated according to law.

Article 51 If, in violation of the provisions of these Regulations, the maintenance or overhaul of urban drainage facilities may affect or seriously affect the drainage, the maintenance and operation unit of urban drainage facilities fails to notify the relevant drainage households in advance, or fails to report to the competent department of urban drainage to take emergency measures in advance, or fails to conduct a comprehensive inspection, maintenance and cleaning of urban drainage facilities in accordance with flood control requirements, which affects the smooth drainage in flood season, the competent department of urban drainage shall order it to make corrections and give a warning; If it fails to make corrections within the time limit or causes serious consequences, it shall be fined from 654.38+10,000 yuan to 200,000 yuan; If losses are caused, it shall be liable for compensation according to law.

Extended data:

Related reports:

If the assessment of water pollution prevention and control is unqualified, it is also necessary to interview. Yesterday, the reporter learned from the Municipal Environmental Protection Bureau that the assessment results of the city's water pollution prevention and control work in various districts in 20 16 have been released. Among them, Daxing District and Pinggu District failed the assessment, and the relevant responsible persons of the two districts have been interviewed, demanding that the rectification be accelerated.

In order to thoroughly implement the Action Plan for Water Pollution Prevention and Control (namely "Water Ten Articles"), strengthen water pollution prevention and control, and ensure the safety of water environment, in February 2065, this Municipality issued and implemented the Work Plan for Water Pollution Prevention and Control in Beijing (hereinafter referred to as the Work Plan), which mainly defined the objectives and tasks of water pollution prevention and control in this Municipality during the Thirteenth Five-Year Plan period.

According to reports, in the first year of the implementation of the 20 16 Work Plan, the whole city made concerted efforts with Qi Xin, and the surface water quality of the whole city improved steadily. The permanganate index and the average annual concentration of ammonia nitrogen in the surface water monitoring section decreased by 4.4% and 4.9% respectively. The proportion of river length with inferior grade V water quality decreased by 4.6% year-on-year; By the end of 20 16, the city's sewage treatment capacity has increased to 6.72 million cubic meters per day, the sewage treatment rate has increased to 90%, and the city's six districts have reached 98%. The problem of insufficient sewage treatment capacity in central cities, new towns and key towns has basically been solved.

In order to urge the district governments to fulfill their responsibilities for water pollution prevention and control according to law and conscientiously implement the requirements of the work plan, the Municipal Environmental Protection Bureau, the Municipal Water Affairs Bureau and other 1 1 departments jointly issued the "Assessment Measures" in March this year to assess the water pollution prevention and control work in various districts every year. According to the assessment method, from March to June this year, the Municipal Environmental Protection Bureau, the Municipal Water Affairs Bureau and other departments 1 1 organized a comprehensive assessment of the water environment quality objectives and the completion of key water pollution prevention and control work in each district in strict accordance with the relevant provisions of the assessment method.

The reporter learned that the contents of this assessment include the completion of water environment quality objectives and the completion of key work of water pollution prevention and control. The completion of water environmental quality objectives specifically assesses the completion of surface water environmental quality objectives, the elimination of black and odorous water bodies, the water quality standards of drinking water sources, and the protection of groundwater quality.

The completion of the key work of water pollution prevention and control will specifically assess eight indicators, including industrial pollution prevention and control, urban pollution control, agricultural and rural pollution prevention and control, ship pollution prevention and control, water resources conservation and protection, water ecological environment protection, strengthening scientific and technological support, responsibilities of all parties, and public participation. The perfect score for the completion of the water environment quality target and the key work of water pollution prevention and control is 100.

According to the results of the completion of water environmental quality objectives, the grades are divided into four grades: excellent, good, qualified and unqualified; Then check the completion of the key work of water pollution prevention and control. If the score is greater than 60 points, the water environment quality grade is the comprehensive evaluation result; Otherwise, the quality grade of water environment will be reduced by one grade as a result of comprehensive evaluation. The comprehensive assessment results are divided into four grades: excellent, good, qualified and unqualified.

Based on this assessment standard, because the completion of the key work of water pollution prevention and control in each district is above 60 points, the comprehensive assessment results are consistent with the completion of the water environment quality target, that is, Miyun District and Huairou District are excellent; Haidian District, Yanqing District, Xicheng District, Dongcheng District, Changping District, Fangshan District, Mentougou District and Shijingshan District are better; Shunyi District, Chaoyang District, Fengtai District and Tongzhou District are qualified; Daxing District and Pinggu District are unqualified. The assessment results will serve as an important basis for the comprehensive assessment and evaluation of leading bodies and leading cadres in various districts and a reference for the allocation of funds related to water pollution prevention and control.

Recently, the Municipal Environmental Protection Bureau, together with the Organization Department of the Municipal Party Committee and the Municipal Water Affairs Bureau, interviewed the heads of Daxing and Pinggu District governments who failed the assessment, pointed out the existing problems to the two districts and put forward rectification requirements. In the next step, the two districts should further raise awareness, earnestly implement territorial responsibilities, speed up the progress of pollution control, strictly supervise and enforce the law, and continuously improve the quality of water environment.