How to handle the procedures of dumping soil in Kunming soil yard

The procedures for dumping soil in Kunming Dump are as follows:

1. Materials required.

1, the traffic police department into the city pass certificate;

2. Certificate of designated spoil disposal site;

3. Responsibility letter for city appearance cleaning at the borrow point;

4. A copy of the contract for cleaning;

5. Print a written application (the content should indicate the address, quantity, transportation route and contact information);

6. Construction drawing of excavation site;

7. Transport agreement and transport qualification approval certificate (original and photocopy);

8. pictures of "three pools and one equipment" on site;

second, the handling process.

1. Go to the traffic police department to apply for a city pass

2. Submit an application

3. Preliminary examination

4. Fill in the form after passing the preliminary examination

5. On-site investigation

6. Be in charge of the leadership's examination and approval

7. Issue certificates

Extended information on dump management:

.

2. The dump should do a good job of three inspections in class one in strict accordance with the requirements, and fill in the Dump Safety Checklist in time and truthfully.

3. Establish a monitoring system for the dump, and monitor it regularly. If it is abnormal, control measures should be taken in strict accordance with the Safety Regulations for Metal and Non-metal Mines.

4. Measure the height of the dump section and the length of the dump line, and the measurement accuracy shall meet the requirements of production measurement accuracy. The measured dumping parameters should not exceed the design parameters, and the corresponding measures should be checked in special areas, and measured once every quarter.

5. Measure the reverse slope of the dump, with no less than 2 sections per 111m, and the measurement accuracy shall meet the requirements of production measurement accuracy. The measured reverse slope should be measured once every quarter within the scope of the dump

6. The bottom width, top width and height of the safety retaining wall should be measured in the dump of the automobile, and the measured parameters of the safety retaining wall should meet the requirements of safety retaining walls of different types of automobiles.

7. The dump should strengthen the inspection of safety facilities, which mainly includes: the quantity and quality of wire ropes and shackles; Whether lighting facilities can meet the requirements; Configuration and integrity of safety warning signs and communication tools.

8. Build reliable flood interception and drainage facilities around the dump to intercept the hillside catchment.

6.2 the platform in the dump site is provided with a 3% reverse slope, and a drainage ditch is built on the platform in the dump site to intercept the catchment on the platform surface and slope surface. When there are water outlets in the dump, measures should be taken to drain the water before dumping.

9. Before the flood season, dredge the flood intercepting ditch inside and outside the dump, check the safety of the flood drainage system in detail, prepare enough materials for flood fighting and emergency rescue, and implement first aid

Xishan District People's Government of Kunming-what materials should be prepared for the approval of the Waste Disposal and Discharge Certificate?