New printed circuit board (PCB) project of Chongqing Fangzheng Gaomi Electronics Co., Ltd.: a tender announcement for power transformation and distribution project.
This news was published at 9: 42: 23 on August 4, 2008.
Chongqing Founder Gaomi Electronics Co., Ltd. plans to build a new printed circuit board (PCB) project in Xiyong Microelectronics Park in Shapingba, Chongqing. The project has completed the relevant procedures such as project establishment and land use planning permission, and the construction funds have been fully implemented. Now it has entered the stage of civil construction in an all-round way, and will soon enter the stage of electromechanical installation.
The first phase of the project covers an area of about 6,543,800+079,000 square meters, with a total construction area of about 6,543,800+045,000 square meters. The construction content includes circuit board workshop, power station, warehouse, wastewater treatment station, chemical warehouse, production and research building, canteen, dormitory, guest house, administrative office building and other supporting facilities.
According to the site conditions and progress requirements of the project, it is planned to install and debug the power distribution system (printed circuit board) of the project, and the tender is specially open.
The contents of the project mainly include:
1. Power station: the primary power distribution system (power distribution, emergency diesel power generation system and power monitoring system) in the power distribution room.
2. The second workshop: the primary power transformation and distribution system in the power transformation and distribution room.
3. Living area: the primary distribution system in the distribution room.
4. Outdoor: High-voltage power cable project.
First of all, the basic requirements are as follows:
(1) an enterprise with independent legal personality and passed the annual inspection of industry and commerce;
(2) Having the first-class qualification for contracting mechanical and electrical equipment installation engineering or the third-class qualification for contracting power transmission and transformation engineering (or above the third-class license for Chongqing electric power facilities), and having passed the qualification examination in recent years;
(3) The registered capital is required to be above 6,543,800+million;
(4) The bidder and its project manager have no bad records in recent three years;
(5) It is in good financial condition. If the property is sealed up, frozen or bankrupt, its bid application will not be accepted;
Second, the registration instructions:
A registered agent must carry the following information
(1) Letter of introduction or power of attorney of the enterprise
(2) the applicant's identity card and a copy.
(3) Copy of business license (copy)
(4) Special engineering design or construction qualification grade certificate (original and copy)
(5) Relevant company information
Registration time and deadline: August 4, 2008 afternoon17: 00;
Registration place: 3rd floor, Kant Building, No.34 Jinhong Road, Longxi Town, Yubei District, Chongqing;
Contact: Wu De and
Chuanzhen: 023-67530700
Tel: 023-6753938 1
Chongqing Fangzheng Gaomi Electronics Co., Ltd.
July 25(th), 2008