Jiangnan Baijingtu Songjiang Prefecture Reclamation Raiders Complete Collection
Talent is suitable for people:
Yamato Nadeshiko: When I was working in the crab pond, I got an extra1015/20/25/30 servings of meat.
Xu Guangqi: In the farmland improvement work, extra 10/20/30/40 products were obtained.
Huang Daopo: When working in the standard cloth workshop, the output increased by 100/ 150/200%, and the labor demand was-1/-2.
These three people, if any, don't hesitate to take her away directly!
Land reclamation trio:
Wen Zhiming+Wu Li+Xu Xiake
Wen Zhiming speeds up the construction of new buildings, Wu Li speeds up the upgrading of buildings, and Xu Xiake speeds up the exploration of new fields, which is just like sitting on a Shenzhou rocket!
Part I: Open source
In the early stage of land reclamation, resources are tight, so you can use the talent of characters to open up sources!
It is recommended that Li Shizhen and Shen Kuo both get 100/ 150/200% product, which is rich in resources and happy! But the disadvantage of Shen Kuo is that the labor consumption will be+1.
Other suggestions:
Judy: He worked in agriculture and animal husbandry for more than 1 hour, and got 30/50/80 resources at random. The workers he needed were-1/-2/-3.
When Wang Wufeng was in charge of financial management, he randomly obtained 30/40/50 resources and needed-1 worker.
Wen _ When he was in charge of agriculture and animal husbandry, he randomly obtained 20/20/30 resources, and the workers he needed were-1/ less workers/less workers.
When she Xiang was in charge of building a commercial building, she randomly obtained 30/60/90 resources and needed-1 worker.
When Zhang Zeduan upgraded its buildings, it randomly obtained 50/75/ 100 resources.
Part II: Throttling
In addition, another problem faced by land reclamation in Hangzhou is food shortage.
This requires the use of our master of hunger management-Xuanzang.
Xuanzang's participation in any work can reduce food consumption by 30/60/ 100%.
Bring him a 50-level whip, and the early construction of Songjiang House will be contracted for him!
Other suggestions:
When Bai Juyi built and upgraded a commercial building, all resources except food were reduced by 20/40/60%, and the required workers were-1.
When Zhan Zhao was responsible for building the production building, the required raw materials decreased by 10/20/30%, and the required workers were-1-2/-3.
Part III: Acceleration
Another problem facing land reclamation is the slow progress, so rational use of personality talent can make land reclamation get twice the result with half the effort!
When Ma is in charge of agriculture and animal husbandry, he will finish the progress 20/30/40% immediately, and the required workers are-1-1-2.
When Wu Zetian takes part in any work, she will complete the progress at once by 5/115%, and the required workers are-1.
When Chang Yuchun was in charge of production, he immediately completed the progress of 10/20/30%. And the required workers-1.