Current location - Recipe Complete Network - Complete recipe book - Details of the kitchen, bathroom floor tiles construction process and technology?
Details of the kitchen, bathroom floor tiles construction process and technology?

Kitchen, bathroom paving tiles construction process and technology:

One, grass-roots level cleanup

coated waterproofing layer construction, the grass-roots level on the surface of the gray skin with a shovel off, with a broom will be dust, sand, and other debris to sweep clean, especially the root of the pipe, floor drains and drainage and other parts of the careful cleanup. If there is oil, the application of wire brush and sandpaper brush off. The surface of the grass-roots level must be flat, depression with cement putty to make up for the flat.

Two, detail additional layer construction

1, open the drum and stir first. It is strictly prohibited to dilute the product with water or other materials.

2, detail additional layer construction: dip the paint brush into the mixed paint in the pipe roots, floor drains, yin and Yang corners, and other easy to leak the weak parts of the uniform brush, not miss the coating. Room temperature 4h table dry, and then brush the second coated waterproof coating, 24h drying can be a large area of coated waterproof layer construction, each additional layer thickness should be 0.6mm.

Three, coated waterproof layer construction HB kitchen and bathroom special waterproof coating general thickness of 1.1mm, 1.5mm, 2.0mm, according to the design of the thickness is different, can be divided into two or three times for membrane construction.

1, open the drum first stirred evenly.

2, the first layer of coating film: the HB kitchen and bathroom special waterproofing has been stirred.

Extended information

Kitchen, bathroom floor tiles Note:

1, one is the wall tiles should be paved from the bottom upwards, and a wall can not be pasted to the top of the wall at once, the joints are generally 1 ~ 3 mm. Secondly, before paving, we should first deal with the flatness of the wall and deal with cracks. Third, the bonding material should be coated with the center slightly higher than the surrounding area, and the rubber hammer should be used to strike the appearance to fix it, so that it can prevent air from accumulating in the bonding layer. Together with the level test.

2, the ground should be leveled. There are some civil construction on the ground is not flat, encountered this situation we should be uneven local water mud mortar paving. Paving can use different colors of tiles (darker) around the box, and the box tiles with a lighter color. Of course, the kitchen and toilet floor must have a slope, so as to facilitate drainage.

3, tile decoration is another thing to pay attention to is the treatment of waterproof layer. Wall and floor tiling construction process and attention to construction. In the kitchen and toilet local walls should be highly attentive. Due to the replacement of porcelain tiles usually damage the original cement paddle waterproof layer. Remedy is to play a layer of asphalt waterproof layer before tiling. The gap between the tiles filled with white cement should also be made up.

4, the tile surface to set flat, the point of view to be accurate, the interface to the line. Tile mesh to be soaked in water for half a day before use. Toilet floor to have a proper slope, not water tile interface to sweep the white cement with vine brush white cement, not in the brick surface with cement stains. Tile paving and cutting finished with cardboard to cover the brick surface, and at least 24 hours before walking on the brick surface.