Current location - Recipe Complete Network - Complete recipe book - The use of straw crusher tips
The use of straw crusher tips

The ten safe use tips of straw crusher

(1) The straw crusher should be fixed on the ground, which can be fixed with cement. If the working place is changed frequently, the pulverizer and motor should be installed on the machine base made of angle steel.

(2)After the straw crusher is installed, it should be carefully checked whether it is installed in place and whether it is not installed firmly enough. Whether the motor shaft and the pulverizer shaft are parallel, at the same time to check whether the transmission belt elasticity is appropriate.

(3) Before starting the straw crusher, rotate the rotor by hand to check whether the operation is flexible and normal, whether there is no collision in the casing, whether the rotor is rotating in the right direction, whether the motor and crusher lubrication is good.

(4) straw crusher do not often change the pulley, in order to prevent the speed is too high or too low.

(5) straw crusher should be started after idling for 2 to 3 minutes, no abnormalities before feeding work.

(6) straw crusher feeding should be uniform, if you find a murmur, bearings and body temperature is too high or outward spraying of materials and other phenomena, should be immediately shut down to check and troubleshooting.

(7) straw crusher before the work of the staff should carefully check the material to prevent metal, stone and other hard objects into the crushing chamber caused by accidents.

(8)When feeding, the staff should stand on the side of the straw crusher to prevent being bounced out of the debris injury. Crush long stalks when the hand must not be gripped too tightly to prevent the hand is brought in.

(9) straw crusher in the stop before stopping feeding, to be removed from the machine after the material is clean, and then cut off the power to stop. After stopping the machine to carry out cleaning and maintenance.

(10) straw crusher operation after 300 hours, must clean the bearings, replace the oil; load oil, to full bearing seat clearance 1/3 as good, at most not more than 1/2. long time downtime, should be unloaded drive belt.