1. bottle: 0.011 yuan / gram * 15 grams * 24 bottles = 3.96 yuan
2. bottle cap: 0.03 yuan / one * 24 = 0.72 yuan
3. logo: 0.013 yuan / one * 24 = 0.312 yuan
4. labor wages: 0.6 yuan / case
5. electricity: 0.4 yuan / case
6. packaging film: 0.4 yuan / case 4. labor wages: 0.6 yuan / box
5. electricity: 0.4 yuan / box
6. packaging film: 0.70 yuan / one
A bottle of water production costs total: 0.278 yuan
A case of bottled water production costs total: 6.692 yuan
Benefit analysis: according to this data analysis, a set of hourly production of 2000-2500 bottles of water. 2000-2500 bottles of bottled water production line, 1 hour of production according to the minimum 2000 calculated as 2000 bottles / 24 bottles = 83.3 pieces of 1 day according to 12 hours of production,
83.3 × 12 = 999.6 (about 1000 pieces) a bottled water wholesale price for the outside world is 12 yuan, a single piece of profit of 12-6.692 = 5.308 yuan, the daily profit of 5.308*1000 = 5.308 yuan. 5.308 * 1000 = 5308 yuan, monthly profit of 5208 * 30 = 159240 yuan to remove the business worker expenses (telephone charges) 15924-500 = 158740 yuan can be seen from the investment point of view of the analysis of the pure water plant is a typical investment is less, quick results, high returns, no risk investment projects.
First site, how large-scale plant, such as 2,000 bottles of drinks or water per hour, the minimum plant requirements are 800 square feet, there is really no 500 square feet also make up.
1, water treatment. Reverse osmosis is about 40-60 thousand.
2, filling machine. If the demand for daily output of 1000 pieces, can work overtime production, the use of 1000-1500 bottles / hour rotary filling line is enough. Better quality of the whole set does not exceed 150,000 yuan.
3, equipment materials and key components. Equipment in order to be durable, must use 304 stainless steel materials, in addition to piping, valves, pumps, etc. need to use a better.
4, if the PET bottle, the back channel of the pouring, cooling and other facilities.
5, a half-ton coal boiler, plus installation and transformation of 20,000 yuan.
6, plant height of 4M or more, the area of 700 square feet or more is good (a line).
7, pure production equipment is about 350,000 to 400,000 can be taken, but now the auxiliary facilities are more expensive, such as plant renovation, personnel disinfection facilities, clean room, laboratory, etc., it is estimated that you need 300,000 yuan to be more insured.
8, in addition to rent, reserve also need at least 300,000 yuan to prepare.
9, therefore, today to start a can make stable quality and can maintain the survival of the beverage factory, at least 1 million yuan.
10, it should be noted that once started, there is no turning back, small beverage business investors are often only concerned about the cost of investment in equipment, ignoring the supporting, auxiliary facilities, start-up costs, declaration of QS, custom molds, packaging design, plate making, recruitment, training, trial production and other late fees and time costs. Develop more than two sets of programs and contingency measures and implement them carefully.
I hope my answer can help you, invest with caution.