Acceptance content and specification of main structure of building engineering
The content is as follows:

1, check the structure type, size, quantity, location, anchorage and joint, lap length, protective layer thickness, rust removal, decontamination, steel bar replacement and paint film treatment. Beard.

2, check the prestressed engineering, steel structure engineering inspection, check the appearance quality of the main body of the project.

3, check the welded joint and mechanical joint. Construction process quality of structural concrete and load-bearing components. Supplementary information about the quality behavior and quality system of all participants in the project.

4. Construction quality, structural quality and function of construction surface, main materials related to structural safety and function, factory certificates of building components and equipment, test reports, witness sampling inspection data and structural entity test reports.

Extended data:

The quality management of the construction site should have corresponding construction technical standards, a sound quality management system, a construction quality inspection system and a comprehensive construction quality rating system. Construction quality control shall be carried out in accordance with the following provisions.

Materials, semi-finished products, finished products, building components, appliances and equipment used in construction projects shall be subject to on-site acceptance. Every working procedure should be controlled according to the construction technical standards, and every working procedure should be inspected after completion. Handover inspection should be carried out between related professional jobs.

For the entrusted supervision project, under the condition of complete supervision data, the supervision unit shall put forward the project quality evaluation report, which shall be reviewed and signed by the chief supervision engineer and the relevant person in charge of the supervision unit. The project quality evaluation report of the project not entrusted with supervision shall be completed by the construction unit.