The Third Hong Qi Gate in Shunde District was built in that year.
Hong Qi Gate in Shunde District was built at 1996. According to the relevant public information, the Sanqihongqi Water Control Project was built in 1996, with a grade of Grade III and a medium scale. It consists of a row of pumping stations, sluices and shiplocks. The pumping station is located on the right bank, with five horizontal units of 1600ZB7.3-3.4 and five T36. -240/65434./S, with a total installed capacity of 1800KW. There is a sluice with 3 holes and a clear width of 7M in the middle, and the designed flow is 107.2m? /S (including ship lock), three-hole and one-in-one structure, plane steel gate, breast wall for water retaining, gate room length17.2m, width 26.4m.. The ship lock is located on the left bank, with single-track and single-stage layout. The front and rear shiplocks are 8m wide and the engine room is15m wide.