Operation time of Kunming Metro Line 6: Starting point: 7: 00- 19: 05 East Bus Station, and ending point: 7: 00- 19: 05 Airport Center. Kunming Rail Transit Line 6, Kunming, China 1 Metro Line, was put into operation on June 28th, 20th1February. The first phase project (Airport Central Station to East Bus Station) was put into operation on September 23, 2020, and the second phase project (East Bus Station to Tangzixiang Station) was put into operation, and the logo color was cyan. Kunming Rail Transit Line 6 starts from the airport central station in Guandu District, passes through Panlong District and ends at Tangzixiang Station in Guandu District. It is a subway line connecting the main city of Kunming and kunming changshui international airport.
1, Kunming Metro 1 Line Branch Operation Time: Starting Station: Chunrong Street 6: 28-23: 2 1, Terminal: Kunming South Railway Station 6: 20-22: 20.
2. Operation time of Kunming Metro Line 2: Starting point: North Bus Station 06: 20-22: 00, and ending point: Huancheng South Road 07: 05-22: 45.
3. Operation time of Kunming Metro Line 3: Starting point: Xishan Park 06: 20-22: 20 1 Terminal: East Bus Station 06: 20-22: 45.