The whole line passes through Kaifu District, Furong District, Tianxin District and Yuhua District.
Railway route planning
Changsha Rail Transit 1 Line runs north-south. The first phase of the project starts from the government station of Kaifu District, Furong North Road in the north, goes south along Furong North Road, passes through Changsha Sewage Treatment Plant and Liuyang River, turns west, crosses the Xinhe Delta, transfers to Changsha-Zhuzhou-Xiangtan Intercity Railway through Kaifu Temple Station, passes through Yingpan Road Tunnel along Huangxing North Road, and transfers to Rail Transit Line 2 at Wuyi Square Station.
After passing through huang xing road pedestrian street, drive east along Laodong West Road, transfer to Rail Transit Line 3 at Houjiatang Station, then turn at Houjiatang intersection, continue laying southward along Furong South Road, cross Xinzhong Road Interchange and Beijing-Guangzhou Railway, cross Changsha Railway Institute and Hunan Provincial Government, cross South Third Ring Road, and transfer to Changsha-Zhuzhou-Xiangtan Intercity Railway at CITIC Square Station.
After leaving CITIC Plaza Station, the line leaves from the hole on the south side of Zhong Yi Road and transits from subgrade to viaduct at the entrance of Environmental Protection Avenue. The line is laid overhead along the green belt of Furong Avenue to Shangshuangtang Station at the terminal and connected to Shangshuangtang Depot.
Refer to the above contents: Baidu Encyclopedia-Changsha Rail Transit 1 Line
What delicious foods can be made with milk?