Current location - Recipe Complete Network - Food world - Wuhan Metro Operation Timetable
Wuhan Metro Operation Timetable
The operation schedule of Wuhan Metro is as follows:

According to the information released by Wuhan Metro Group, during working days, the operation hours of rail transit 1, 2, 3, 4, 6, 7, 8, 1 1 are from 6: 00 to 23: 00, and the operation hours of rail transit Yangluo line are from 6: 00 to 22: 30.

During the rest days, the operation hours of rail transit 1, 2, 3, 4, 6, 7, 8, 1 1 lines are from 6: 30 to 23: 00, and the operation hours of rail transit Yangluo line are from 6:30 to 22:30.

Wuhan rail transit line:

The first phase of the North Extension Line of Wuhan Rail Transit Line 7 and the second phase of Line 16 were put into operation initially. The operating mileage of Wuhan Metro reaches 460 kilometers, with 29/kloc-0 stations.

On the same day, the second phase of Wuhan Rail Transit Line 3, the third phase of Wuhan Rail Transit Line 6, and the fourth phase of 1 1 were started, and there were 12 projects under construction in Wuhan Metro, with a total mileage of about162.5km. The coverage of rail transit network continued to strengthen the connection between the new urban area and the main urban area, and accelerated the drawing of "Wuhan on the track".

The first phase of Qianchuan Line runs through Line 7, and the total length of the north-south extension line of Line 7 is 68.7 kilometers, which is 60.8 kilometers longer than the current Line 2 (including the airport line and the south extension line). It has become the longest subway line in Wuhan and ranks in the top 10 in the list of the longest subway lines in China.