Lanzhou-Xinjiang Railway is the main railway transportation line from Xinjiang to China and an important part of the northwest railway network in China. In the more than 30 years after the completion of Lanzhou-Xinjiang Railway, Urumqi Railway Bureau has carried out large-scale transformation of the line, gradually realized power connection and adopted electrical centralization. Advanced technologies and equipment such as semi-automatic block and wireless train dispatching have fundamentally changed the backward situation of technology and equipment, and increased the line capacity to 2 million tons, reaching the domestic advanced level. 1986, China realized the traction power diesel engine for the first time.