Current location - Recipe Complete Network - Food world - Suzhou traffic control information time section + subway adjustment information + bus adjustment information
Suzhou traffic control information time section + subway adjustment information + bus adjustment information

In October, Suzhou will have traffic control due to construction and various activities, so everyone should pay attention to relevant traffic control information, as well as adjustments to buses and subways. Tourists traveling to Suzhou should pay special attention to traffic control. Road section, let’s take a look.

Traffic control

Jinling East Road adopts temporary traffic control

Due to the construction needs of Jinling East Road reconstruction project in Suzhou Industrial Park, starting from October 10, 2020, Suzhou police will adopt phased temporary traffic control on Jinling East Road:

(From October 10, 2020 to April 30, 2020, Jinling East Road (from Yilingshan Street to the east side about 100 meters away) will be unnamed The road section is fully closed for construction, and motor vehicles are prohibited from passing through. Motor vehicles can detour from Weisheng Road, National Highway 312, and Tonghe Road. Non-motorized vehicles and pedestrians can pass through the construction road.

(2 years. From October 10 to April 30, 2020, Jinling East Road (Weisheng Road to Yilingshan Street) will be semi-closed for construction, and vehicles and pedestrians can pass normally.

(From May 1, 2020 to 2020 On December 30, the section of Jinling East Road (only the small road on the east side of Jinyuan to the south gate of Yonghewan Community) will be fully closed for construction. During this period, motor vehicles are prohibited from passing. Motor vehicles can detour from Yilingshan Street. Non-motor vehicles and pedestrians It can be accessed from the construction access road

(From May 1st to December 30th, 2020, the small section on the east side of Jinling East Road (from Weisheng Road to Weijinyuan) and from the south gate of Yonghewan Community. The Yilingshan street section is subject to semi-closed construction, and vehicles and pedestrians can pass normally

Shao Mozhen Lane and Furenfang Lane are under overhaul control

Shao Mozhen Lane and Furenfang Lane. The overhaul construction is planned to start on October 10, with a total construction period of 60 days. The existing asphalt surface layer of the motorway will be milled and paved, and the sidewalks and paving will be replaced with granite materials during the construction period. The organization plan is as follows:

1. Shaomo Zhenxiang:

The Shaomo Zhenxiang overhaul project adopts half-width mobile enclosure construction. The section from Dajingxiang to Qianjiang will be operated by motor vehicles from the north. Motor vehicles traveling south are one-way, and motor vehicles traveling from south to north can detour from Gongxiang or Renmin Road.

2. Furenfang Lane:

Furenfang Lane is undergoing major repairs. The project also uses half-width mobile fencing construction, and motor vehicles use the remaining half of the road to travel in one direction from east to west.

Traffic control for the Suzhou Beautiful Countryside Healthy Tour

October 13, 2020. , the autumn "ABC Cup" Suzhou Beautiful Rural Health Tour will be held in Beilian Village, Tongli Town, Wujiang District. In order to ensure the smooth progress of the event and the safety and orderliness of road traffic during the event, according to the "Road Traffic Safety of the People's Republic of China and the State" According to the provisions of Article 39 of the Law, the following temporary traffic control measures will be adopted on relevant roads:

1. The section of Tongzhou Highway (from the traffic light intersection of Beilian Village Gate 1 to the intersection of Sutongli Highway in October this year From 8:00 to 9:30 am on the 13th and from 11:00 to 13:00, motor vehicles and non-motor vehicles are required to travel in one direction from west to east, and pedestrians are strictly prohibited from walking on the motor vehicle lane.

2. North. Liancun South Ring Road, West Ring Road (the section from the South Ring Road intersection to the west entrance of Beilian Road, Beilian Road, and Subei Road (the intersection from the east entrance of Beilian Road to the intersection of Beilian Modern Industrial Park Management Committee) at 8:00 a.m. on October 13, 2018 Motor vehicles and non-motor vehicles are prohibited from passing between 00:00 and 13:00.

Passing vehicles, pedestrians and residents along the route are requested to make travel arrangements in advance, follow the on-site traffic sign instructions, and obey the instructions of the on-site management personnel. Please inform each other that the control measures may cause you travel inconvenience. , please understand!

Traffic control at Wujiang Station of the Tour of Taihu Lake International Road Cycling Race

From 7:30 am to 14:00 pm on October 13, 2020 at the Shuixiu Street intersection of Kaiping Road (Starting point - East Taihu Avenue (turn right - Yingbin Avenue (turn left - the roads surrounding East Taihu Hotel and Sports Park (circle - Yingbin Avenue (turn right - East Taihu Avenue (turn right - Shuixiu Street (turn left - Shuixiu Street intersection of Kaiping Road (terminal) The following temporary traffic control measures will be adopted on the relevant roads.

1. Shuixiu Street (section from Gaoxin Road to East Taihu Avenue, East Taihu Avenue ( Shuixiu Street to Yingbin Avenue, Kaiping Road (Yingshan Street to Fengqing Street, Wuyun Road (Yingshan Street to Fengqing Street, Yingbin Avenue), and the roads surrounding East Taihu Hotel and Suzhou Bay Sports Park (S230 auxiliary road Motor vehicles and non-motor vehicles are prohibited on the roads and other unnamed roads, and pedestrians are strictly prohibited from walking on the motor vehicle lanes;

2. The middle intersection of Pangyang Road, S230 Provincial Road, is temporarily closed, and the right-in and right-out procedures are adopted (for pedestrians) Except for management measures, vehicles heading towards the East Taihu Hotel will use the S230 East Taihu Avenue auxiliary road (from north to south to Pangyang intersection, turn right into the waiting area and pass as required.

Kunshan International Ten Thousand People Cycling Conference Traffic Control

Specific route: Kunshan Dayuwan West Central Channel (starting point - Wuhan University Road - Chuanshi Road - Sanlin Road - Wuhan University Road - Chuanshi Road - Zu Chong Road - Xiao Lin Road - Zuchong Road - Ma'anshan Road - Stadium Road - Culture and Sports Road - Sports Center North Square (end point

Note: This cycling conference is all held in non-motorized lanes, and the non-motorized lanes along the ride Vehicle parking is prohibited.

Traffic controlled routes and intersections:

1. Starting point

Controlled hours: 7:00 a.m. - 10:00 a.m.

Controlled area:< /p>

① Motor vehicles are prohibited from entering at the south entrance of Xiaolin Road in Dayu Bay

② Motor vehicles are prohibited from entering at the west entrance of Zuchong Road in Dayu Bay

③ Dayu Bay Wuhan Motor vehicles are prohibited from entering at the entrance and exit of Daxue Road

④ Motor vehicles are prohibited from traveling westward on the west side of the west entrance of the parking lot inside Dayuwan

2. End point

Control time: 7:00 am - 12:00

Restricted area:

①Motor vehicles are prohibited from traveling south at the intersection of Ma'anshan Road and Gymnasium

②Qianqian Piano Shop on Gymnasium Road Motor vehicles are prohibited from traveling northward on the north side

③Motor vehicles are prohibited from exiting at the entrance and exit of Gate 1 of the Gymnasium on Gymnasium Road

Temporary control in the middle and late stages of G312 and S228 traffic nodes

< p>Due to the construction needs of the supporting project of the second phase of the Central North Line project, in the middle and late this month, the Suzhou Municipal Public Security Bureau Traffic Police Detachment will implement temporary traffic control at the G312 and S228 traffic nodes:

(11 October 18 From 0:00 to 6:00 in the morning on the same day, the S228 main line in the section from Taiyang Road to Sudai was closed in both directions. Vehicles traveling from south to north took the off-ramp at the S228 Sudai Road exit, detoured via Dongtinghe Road to the S228 Taiyang Road ramp and entered S228. In the direction of Changshu; vehicles from north to south take the off-ramp at the S228 Taiyang Road exit, detour via Dongtinghe Road to the S228 Sudai Road ramp and enter S228 towards the city.

(210 months). From 0:00 a.m. to 6:00 a.m. on the 31st, the G312 west-turn south ramp (towards the city is closed). Vehicles traveling from west to south exit the ramp at the G312 Sudai Road exit and detour from Taiyang Road and Dongtinghe Road to S228 Su. Take the ramp on Dai Road and enter S228 toward the city.

Traffic control for the Taihu Lake International Race Walking Race

The Taihu Lake International Race Walking Race will be held from October 20th to 22nd. It will be held in Wuzhong District on October 20. In order to ensure the safety and smooth progress of the competition, temporary traffic control will be implemented on the roads passing by the competition:

(From 7:00 to 9:00 on October 20, Xuxiang intersection of Taihu Avenue No vehicle traffic is allowed until the Zhoushan intersection of Huan Taihu Avenue;

From 8:00 to 12:00, Huan Taihu Avenue (200 meters after Taihu International Conference Center to Lupu Port Bridge, Taihu International Conference Center to Taihu Water Conservancy Vehicle traffic is prohibited 2.3 kilometers behind the hub.

(From 22:00 to 24:00 on October 20, the intersection of Wujun Road and Taihu Embankment is closed to motor vehicles.

(October 31 From 8:00 to 12:00 on the 21st, vehicle traffic is prohibited on Wujun Road (the section from Taihu Embankment to Shao'ang, and from Taihu Embankment (Wujun Road to the end of Taihu Embankment).

(410 21:00 to 24:00 , the western half of Jinshan South Road (the section from Zhuyuan Road to Yushan) is closed to motor vehicles.

(From 8:00 to 11:45 on October 22, the section from Jinshan South Road (Yushan Road to Zhongshan West) will be closed to vehicles.

The above control time is an estimated time, and the specific time will be based on the actual situation. The control time shall prevail. Road closures and traffic restrictions not listed in the notice shall be implemented according to the traffic signs and markings set up on the road and the instructions of the traffic police during the event.

Please plan. Vehicles traveling on the above-mentioned roads are required to choose lanes in advance or pass at a staggered time limit. Vehicles and pedestrians traveling around the controlled roads must obey the instructions and guidance of on-site personnel.

The intersection of Baodai East Road and Dongyuan Road is closed. Construction Control

Due to the need for road restoration construction at Baodai East Road Station of Rail Transit Line 3, in order to ensure traffic safety and construction safety during road construction, from October 8 to December 31, Suzhou City The Traffic Police Detachment of the Public Security Bureau will implement temporary traffic control at the intersection of Baodai East Road and Dongyuan Road:

During the road construction, the south entrance of Baodai East Road Dongyuan Road (south of Baodai East Road on Dongyuan Road) The side section is closed for construction, and vehicles are prohibited from passing through. Vehicles can detour from Wenqu Road and Yuebang Street

Changshu International Half Marathon Traffic Control

"Changshu Bank Changshu International Half Marathon. The "Marathon" competition will be held in Shanghu Scenic Area on October 27, 2020. In order to ensure the safety and smooth progress of the competition, in accordance with Article 39 of the "Road Traffic Safety Law of the People's Republic of China", it was decided that Shanghu Marathon will be held during the event. Temporary traffic control measures will be implemented on some roads around the scenic area:

1. From 00:00 on October 24th to the end of the competition on October 27th, the unnamed road in front of Gate 1 of Shanghu Scenic Area (Qiuyan Road to the scenic area Half of the road on the west side of Parking Lot 1, half of the road on the east side from Gate No. 1 of Shanghu Scenic Area to Tai Highway, and half of the road on the east side of Tai Highway (from the unnamed intersection to the T-shaped intersection of Tai Highway) are prohibited for pedestrians and vehicles (including motor vehicles and non-motor vehicles, the same below)

2. From 19:00 on October 26, 2020 to the end of the event on October 27, vehicles and pedestrians are prohibited from passing and parking on Taipei Highway and Fushui Embankment (vehicles and pedestrians with special certificates for the competition) Except for personnel.

From 00:00 to 12:00 on October 27, 2020, Huanhu Road in Shanghu Scenic Area (including the area surrounded by Fushui Dike) is prohibited from passing and parking by vehicles and pedestrians ( Vehicles and personnel holding competition-specific certificates are excluded.

The general public is kindly requested to arrange travel time and routes in advance, and vehicles in the controlled area should leave the controlled area in advance.

Subway operation adjustments

Starting from October 14, Suzhou Rail Transit will further adjust the network operation hours and driving intervals to facilitate citizens’ daily travel.

The specific adjustments are:

Line 1

On weekdays, the shortest driving interval during morning peak hours is shortened from 2 minutes and 30 seconds to 2 minutes and 20 seconds. The shortest driving interval during peak hours remains unchanged at 3 minutes;

On weekends, the driving interval between 7:29 and 10:00 in the direction of Zhongnan Street is shortened from 6 minutes to 5 minutes, and the driving interval during other periods remains unchanged;< /p>

The first bus stop and time have been adjusted. The first train bound for Zhongnan Street departs from Mudu at 5:40, and the first train bound for Mudu bound for Leqiao, Xinghai Square, Xinghu Street, and Zhongnan Street departs from 6:10 to 6:00 at the same time.

Line 2

On weekdays, the shortest driving interval during the morning peak period is shortened from 3 minutes and 50 seconds to 3 minutes and 40 seconds, and the driving interval during the evening peak period is shortened from 5 minutes and 30 seconds to 5 Minutes and 20 seconds; weekend driving intervals remain unchanged;

The first train time and stop have been adjusted. The 4 stations bound for Qihe and Likou in the direction of Sangtian Island and Yueliangwan and Sangtian Island in the direction of Qihe will depart at the same time at 5:40 in the morning;

The time of the last bus has been adjusted. The last train time on Qihe Road (bound for Laodong Road) has been extended from 22:56 to 23:06, the last train time on Xujiang Road (bound for Sangtian Island) has been extended from 22:47 to 23:03, and the last train time on Sangtian Island (bound for Qihe Road) 22:20 is extended to 22:30.

Line 4

The first train time and stop have been adjusted.

The main line is bound for Tongli and Longdao. Bang and the west of Pinglong Road, bound for Suzhou Bay East, Tongli and branch line Muli in the direction of Longdaobang ***5 stops, departing at the same time at 5:40;

The first train of the branch line Hongzhuang is earlier Departure at 6:08

Temporary bus adjustments

In order to facilitate the smooth holding of the bicycle race, buses 716, 719, and Buses 735, 720, 726, and 742 are temporarily adjusted. The route adjustments are now announced as follows for citizens’ reference:

1. Bus No. 716: Wenyuan Road Bus Terminal to Suzhou Bay Food New World< /p>

Cancel the direction of Gaoxin Road, Hujing Street and Wuyun Road and adjust the direction of Gaoxin Road, Tiyu Road and Fengqing Street (temporary adjustment time period 6:20-18:00;

Cancel Stops: Suzhou Bay Food New World, Wuyun Road Temporary Terminal***, 2 stops in total, East Taihu Ecological Park is temporarily adjusted as the temporary terminus;

Currently stops along the road: Wenyuan Road Bus Terminal, Wujiang RT-Mart Supermarket , Yicai Bridge, Shuixiang Garden, Perxiang Garden (Taoliyuan, Mingcheng Garden, Yongding Hospital, Wujiang Shixiao Kindergarten, Wujiang Meteorological Bureau, Experimental Primary School Taihu Campus (only downlink), Wujiang Technical High School (only uplink), Wuyue Plaza East (Temporary, Gaoxin Road Qiufeng Street, Wujiang Middle School, East Taihu Ecological Park.

2. Bus No. 719: Wujiang Bus Station to Shuixiu Street

Cancel Kaiping Road to East Taihu Lake Avenue, Shuixiu Street, Kaiping Road, and Hujing Street will be adjusted to the direction from Kaiping Road to Chunlan Street, East Taihu Avenue, Provincial Highway 230, and Kaiping Road;

Canceled stops: (Kaiping Road, Kaiping Road, Chunlan Street (downward only, (East Taihu Avenue East Taihu Avenue Fengqing Street), East Taihu Avenue Shuixiu Street (upward only), (Shuixiu Street Shuixiu Street East Taihu Avenue (downward only), (Kaiping Road Kaiping Road Shuixiu Street (only Downbound, (Shuixiu Street, Shuixiu Street, Kaiping Road (only upbound, (Lakeview Street, Suzhou Bay Food World, Carnival Hotel, (Shuixiu Street), Shuixiu Street***), a total of 9 stops, the remaining stops remain unchanged;

The current stops along the way: Wujiang Bus Station, Chang'an Road Changban Road North, Evergrande Building Materials Market West, Renshe Building, Kaiping Road Huayuan Road, Wujiang Administrative Service Center, Kaiping Road Zhongshan South Road, Kaiping Road Peri Xiangnan Road, Experimental Primary School Taihu Campus, Wujiang Technical Secondary School, Kaiping Road Dongmei Street, Line 4 Suzhou Bay East Station, Kaiping Road Xiarong Street, Kaiping Road Chunlan Street (only upbound (return.

Three , Bus No. 735: Shuixiu Street to Shuixiu Street from Tongli Bus Station

Cancel the direction from Tiyu Road to Xiarong Street, Gaoxin Road and Shuixiu Street and adjust it to Tiyu Road to Xiarong Street and Gaoxin Road , Chunlan Street, Kaiping Road, Su Zhentao Highway, and Gaoxin Road;

Canceled stops: (Shuixiu Street, Shuixiu Street, (Gaoxin Road, Suzhou Bayview Garden, Wujiang Middle School (only downbound ***3) The remaining stops remain unchanged;

The current stops along the way are: Tongli Bus Station, Tongli Ancient Protection Committee, Tongli Ancient Town Shipai Building, Yingyan Road Fuji Road, Yunli Road Fuhua Road West, Yunli Road Uplink only, County House Street (downlink only, Sanjiajing East (uplink only), Ginkgo Square (uplink only), Songling Primary School, Wujiang Postal Building, Century Building, Wujiang Park, Wujiang Shi Xiao Aide Campus, Wujiang Experimental Junior High School, Yongding Hospital Ximen, Wujiang Shi Xiao Kindergarten, Lanjingyuan, Yuantong Temple West, Gujiadang Road Qiufeng Street, Wujiang Middle School (only upwards, Suzhou Bay Experimental Junior High School (only upwards)).

4. Bus Route 720: Tongli Bus Station to Shuixiu Street

Cancel the direction from Xiarong Street to Gaoxin Road and Shuixiu Street, and adjust it to Xiarong Street to Gaoxin Road, Chunlan Street, Kaiping Road, Su Zhentao Highway, Gaoxin Road direction;

Canceled stops: (Gaoxin Road, Suzhou Bayview Garden, (Shuixiu Street, Shuixiu Street, Wujiang Middle School (only downbound ***) Stops, other stops remain unchanged;

Now stops along the way: Tongli Bus Station, Tongli Ancient Protection Committee, Tongli Ancient Town Shipai Building, Yingyan Road Fuji Road, Yunli Road Fuhua Road West , Yunli Road Xingdong Road, Shanhu Garden Community, Pangdong Road Shanhu East Road, Pangdong Road Huxin East Road, Pangdong Road Zhaqiao Road, East Taihu Avenue Pangjin Road West, Chang'an Road Changban Road North, Chang'an Road Lianyang Road North, Science and Technology Entrepreneurship Park, Chang'an Road Pangyang Road South, Chang'an Road Ludang Road North, Chengnan Garden South Gate, Huayuan Road Ludang Road North, Huayuan Road Panyang Road South, Jiangnan Huafu, Pangyang Road Zhongshan South Road East, Zhenze Middle School, Lianyang Community East, Xiqingyuan, Longhe Garden, north of Landsea Green County, east of Songling Avenue on Ludang Road, south gate of Suzhou Jiuyuan, north of BFSU Suzhou Bay Foreign Languages ??School, Pangyang Road on Xia Rong Street, east of Xia Rong Street on Taihu Avenue, east Taihu Building (only upwards, Kaiping Road, Xiarong Street, Sixin Road, Xiarong Street, Wujiang Middle School (only upwards, Suzhou Bay Experimental Junior High School (only upwards), turn back.

5. Bus No. 726: Ludang Lake Wetland Park to Shuixiu Street

Cancel the direction from Kaiping Road to Fengqing Street, East Taihu Avenue, Yingshan Street, Wuyun Road, and Shuixiu Street, and adjust it to Kaiping Road to Chunlan Street, East Taihu Avenue, and Su Zhentao Highway, Kaiping Road direction;

Cancel stops: (Shuixiu Street Shuixiu Street, (East Taihu Avenue East Taihu Avenue Shuixiu Street, East Taihu Avenue Fengqing Street (upbound only, (Fengqing Street Green Space) Taihu East Bank North (only downbound, Fengqing Street Kaiping Road (upbound only), (Kaiping Road Kaiping Road Fengqing Street (downbound only), Kaiping Road Chunlan Street (downbound only***) 7 stops in total, the rest of the stops remain unchanged ;

Now we stop along the way: Ludang Lake Wetland Park, Nanyue Haoting, Longhe Garden, Landsea Green County North, Taihu New City Science and Technology Park, Jixiang Garden, Changyi Garden, East Taihu Experimental Primary School, Wuyue Plaza West (only upbound), Line 4 Suzhou Bay Station (only downbound), Kaiping Road Xia Rong Street, Kaiping Road Chunlan Street (only upbound (return.

6. Bus No. 742: Wenyuan Road Bus From hub station to Hengshan Cultural and Sports Plaza

Cancel the direction of Yingbin Avenue and 230 auxiliary road and adjust to the direction of 230 Provincial Highway;

Cancel stops at: East Taihu Hotel and Suzhou Bay Sports Park , Wangyan Hot Spring (only 3 stops in total on the downlink;

The current stops along the road are: Wenyuan Road Bus Hub Station, Huayuan Road Tiyu Road South, Wujiang Building, Olin Tsinghua East District, Yongding Hospital, Wujiang Shi Xiao Kindergarten, Wujiang Meteorological Bureau, Wujiang Technical Secondary School (only downlink, Kaiping Road Dongmei Street Road, Wuyue Plaza West (only downlink), Line 4 Suzhou Bay East Station (only uplink), Wujiang Middle School (only uplink, Chunlan Street High-tech Lu Nan (only downbound, Kaiping Road Chunlan Street (only downbound, Kaiping Road Xia Rong Street (only upbound), Xiarong Street, Kaiping Road (only downbound), East Taihu Building (only downbound), Xia Rong Street East Taihu Avenue, Chengzhong Bridge West, Tong'an West Road, Ruiyuan Road, Tongxin Intersection, Tongxin Bridge West, Tongxin Intersection (upbound only, Chuangye Road, Tongxin Road (downbound only, Wannan Community Service Station, Wanping Station, Xinqi Line Taihu Intersection, Jiuquqiao East, Ji Ganglukou, Xinhu Village Group 1, Xinhu Village, Miaoqian Bridge, Miaoqian, Xijiaowei Bridge, Shidang Bridge, Tianshi Bridge, Zhengtong Bridge, Jijiawan Bridge, Beiheng Village Committee, Hengshan Central Primary School, Hengshan Bank of China, Nanju Road Bridge Road West, Hengshan Theater, Hengshan Cultural and Sports Plaza.

Due to the construction needs of Jinling East Road, bus routes 106, 111, 119, and 148 will be temporarily adjusted starting from October 12. The specific plan is as follows:

Bus route 106

p>

The direction is from Jinling East Road, Sifang Street, and Putian Road, and is temporarily adjusted to Jinling East Road, Weisheng Road, 312 National Highway, Tonghe Road, and Putian Road.

Canceled stops: Jinling Road Weisheng Road East, Yonghewan Garden, Putian Village, Putian Road Sifang Street, Putian Road Loushang Road.

Bus No. 111

The route starts from Jinling East Road and is temporarily adjusted to Jinling East Road, Weisheng Road, 312 National Highway, Tonghe Road, Putian Road, Sifang Street, and Jinling East Road .

Canceled stops: Jinling Road Weisheng Road East, Yonghewan Garden, Putian Village,

Added stops: Putian Road Sifang Street, Putian Road Loushang Road.

Bus No. 119

The route starts from Jinling East Road and is temporarily adjusted to Jinling East Road, Weisheng Road, National Highway 312, Tonghe Road, and Jinling East Road.

Canceled stops: Jinling Road Weisheng Road East, Yonghewan Garden, Putian Village, Loushang Street.

Bus No. 148

The route starts from Jinling East Road and is temporarily adjusted to Jinling East Road, Weisheng Road, National Highway 312, Tonghe Road, and Jinling East Road.

Canceled stops: Jinling Road Weisheng Road East, Yonghewan Garden, Putian Village, Loushang Street.

At the same time, the Loushang Street (north side station) was temporarily moved from Jinling East Road to Sifang Street, and the Tonghe Road (north side station) was moved about 200 meters eastward.

Due to the construction of Metro Line 6, the north side of the intersection of Jinshang Road and Xinqing Road is closed. Starting from October 12, bus routes 130 and 141 will be temporarily adjusted. The specific plan is as follows:

Bus No. 130 and 141

The routes starting from Jinshang Road will be temporarily adjusted to Jinshang Road, Chuangyuan Road, Xinghua Street, Xinqing Road and Jinshang Road.

Temporarily canceled stops: Jinshang Road, Chuangyuan Road (west side,

Temporarily added stops: Chuangyuan Road, Jinshang Road (south side.

Due to traffic control , starting from October 11, bus routes 62 and 621 will be temporarily adjusted. The specific plan is as follows:

Bus routes 62 and 621

Directions include: Dongshan Avenue, Mudong Road, Dongshan Avenue, temporarily adjusted to: Dongshan Avenue

Temporarily cancel the stops: Duqiao Village, Xiaolu, Cable Factory, Ferry Bridge

The intersection of Shoubaodai East Road and Dongyuan Road. Due to the impact of the closed construction, bus route 5007 has been temporarily adjusted since October 9. The specific plan is as follows:

Bus route 5007

Direction: Wenqu Road-Dongyuan Road-Bao Daidong Road - Baodai West Road, temporarily adjusted to Wenqu Road - Dongwu North Road - Baodai West Road

Temporarily cancel the stop: Wu Zhonggong *** Cultural Center,

Temporary additional stops: Dongwu Tower (east side.

Due to emergency repairs on Haiyun Road, bus 855 will be temporarily adjusted starting from October 12th. The specific plan is as follows:

Bus 855

The direction of the road is from: 312 National Highway Overpass, Haiyun Road, Huayi Road, temporarily adjusted to: 312 National Highway Overpass, Haiyun Road, Huaxing Road, Haiting Road, Huayu Road, Haiyun Road, Huayi Road. The "Changfangcun" station will be temporarily moved to about 50 meters south of the intersection of Huayun Road and Haiyun Road.

During the temporary adjustment, the "Haiting Road Huayu Road West" station will operate on a single trip. It passes twice. It still stops on the south side when heading to "Xingeng Village Committee", and still stops on the north side when heading to "Wangting First and Last Station East".

Due to emergency construction on Wangsheng Road, Starting from October 13, Route 876 will be temporarily adjusted. The specific plan is as follows:

Bus Route 876

The direction is from: Sudai Road, Wangsheng Road, and the temporary adjustment is: Sudai Road , Xingyuan Road, Dongtinghe Road, Wangsheng Road

Temporarily cancel the stops: Wangsheng Road Sudai Road West, Wangsheng Road Zhanshang Road East, Muxiang,

Temporarily increase the stops. : Wanggeng, Fangbang, Dongtinghe Road and Wangsheng Road North

At the same time, the "Huwan Police Office" station will be moved about 100 meters south.

Bus transportation will be restored<. /p>

Due to the completion of the closure construction of the section of Jinchu Road (Huquan Road to Hulin), bus No. 34 will resume from October 15. The specific plan is as follows:

Bus No. 34

p>

The direction is from: Huquan Road, Hulin Road, restored to: Huquan Road, Jinchu Road, Hulin Road

Restored stops: Baiyang Bay (East, Jinchu Land Rover). Quan Road West.

At the same time, new bus shelters in Yili Logistics Park and Baiyangwan (West) will be opened, involving bus lines 85, 306, 311, and 529.

Due to the construction of Matang Road Ended. Starting from October 15th, bus route 666 will resume temporary adjustment. The specific plan is as follows:

Bus route 666

Direction: Gusu West Road-Mudong Road, resume Adjusted to: Gusu West Road-Zoumatang Road-Muxu Road.

Canceled stops: Mudu Tianhua School, Fenghuang Road, Jinqiao Industrial Park, Sunzhuang Road,

Restored stops: Xiecun Community, Zoumatang Road, Baodai West Road South, Mudu Duxin Citizen Service Center.

Due to the completion of Suxi Road construction, bus No. 85 will resume from October 16. The specific plan is as follows:

Bus No. 85

The route is from: Wendu Road, Changzhouyuan Road, G312, Xinzhen Road, Zhongtang Road, Zhenbei Road, Suxi Road, restored For: Wendu Road, Suxi Road.

Canceled stops: Zhenbei Road, Xitang Road East,

Restored stops: Huayang Village, Zhujiaqiao, Tongxin Village Community Service Center.

At the same time, the station on the east side of "Zhujiaqiao" was moved about 50 meters north.

Bus operation terminated

Bus holiday 5

In order to further optimize the allocation of bus resources, starting from October 17, bus operation will be terminated on Holiday 5. The specific plan is as follows:

The direction before cancellation: Huayi Stars Plaza, Yangcheng Lake Avenue, Jinlin Road, Yangcheng Ring Road, Yangcheng Lake Avenue, Xinghu Street, Fengting Avenue, Zhujing Road, Zhihe West Road, Yujing Road , Fengting Avenue, Xingang Interchange, Xinggang Street, Xingrong Street, Suzhou Center;

Stops before cancellation: Huayi Stars Plaza, Yiou Lai, Yangcheng Lake Avenue Keneng Road West, Zhongxin Technology City, Qingjian Lake Commercial Plaza, Weiting Hongqiao, Huning City Railway Park Station Square, Gulou No. 2 Village, Gulou New Village, Gaobang New Village, and Suzhou Center.

Bus stops will be cancelled

Bus routes 45, 512, 513, 552 and 932

Due to the need for the resumption of construction of the surface road of Rail Line 3, the bus stops will be canceled from October 10 Starting today, buses 45, 512, 513, 552, and 932 will no longer stop at the "Wuzhong Gong *** Cultural Center" (south stop).

Bus optimization and adjustment

In order to further facilitate passengers’ travel, starting from October 18, bus route 615 will be optimized and adjusted, and the section of express line 11 will be adjusted simultaneously. The specific plan is as follows: < /p>

Bus No. 615

Directions from: Mudu Bus Exchange Hub-Jinshan South Road-Cuifang Street-Nanting Road-Xiecun Road-Baodai West Road-Gucun Road- Dongxin Road-Jixiang Road-Dongli Road-Shijin Road-Xujin Road-Zixu Road-Xuxiangyuan first and last station;

Adjusted to: Mudu Bus Exchange Hub-Yushan Road-Jinfeng South Road- Zhongshan West Road-Cuifang Street-Nanting Road-Xiecun Road-Baodai West Road-Gucun Road-Dongxin Road-Jixiang Road-Dongli Road-Shijin Road-Xujin Road-Zixu Road-Sunwu Road transfer hub Station;

Added stops: Xiajiabang, Yushan Road West, Yushan Road Jinfeng Road West, Jinfeng Road Yushan Road South, Jinfeng Road Zhuyuan Road North, Jinfeng Road Shanzhuang Road, Jinfeng Road Jinchang Road, Jinfeng Road Huayuan Road, Jinfeng Interchange (east side, Mudu Ancient Town, Sunwu Road Bus Parking Lot;

Canceled stops: Nanbang, China Garden Hotel, Tianping Hotel, Mudu Tianhong, Mudu .

Operating hours:

Mudu bus interchange hub 6:00-19:30

Sunwulu bus interchange hub 6:00-19 :30.

Departure interval: 20-25 minutes

Bus Express Section 11

Direction: Xujin Road-Zixu Road-Xushi Street- Xuxiangyuan first and last station;

Adjusted to: Xujin Road-Zixu Road-Xushi Street-Xuxiangyuan first and last station-Xushi Street-Zixu Road-Sunwu Road-Sunwu Road bus parking lot

< p>Added stop: Sunwu Road bus parking lot.