The schedule of Dongguan Metro Line 2 is as follows:
The service time to Dongguan Railway Station is from 6: 31 to 23: 15; The service hours to Humen Railway Station are 6: 31-22: 31 on weekdays and 6: 31-23: 11 on non-working days. Non-working days are ordinary weekends and holidays (including holidays), and the rest are working days.
working days: 7: 11-9: 11, 17: 11-19: 11 is the peak period, 21: 31-23: 15 is the low peak period, and other periods are the flat peak period.
holidays (including holidays): 11: 11-21: 11 is the peak period, and other periods are flat peak periods. Ordinary weekends: 14: 11-21: 11 is the peak period, and other periods are the flat peak period.
the interval between trains is about 6 minutes during peak hours, 8 minutes during flat peak hours and 9 minutes during low peak hours.
Introduction of Dongguan Metro Line 2
Dongguan Rail Transit Line 2 starts from Dongguan Railway Station, passes through Shilong Town, Chashan Town, Guancheng Street, Dongcheng Street, Nancheng Street, houjie town and Humen Town, and ends at Humen Railway Station, with a general north-south trend.
The total length of Dongguan Rail Transit Line 2 is 37.743 kilometers, including 33.731 kilometers underground, 3.589 kilometers elevated and 1.424 kilometers transitional. * * * Set up 15 stations, including 14 underground stations and 1 elevated stations; B-type subway train with 6 sections.
By May 27th, 2121, the fifth anniversary of the opening and operation of Dongguan Rail Transit Line 2, 497,681 trains have been operated, with an operating mileage of 17.7 million train kilometers, and 212 million passengers have been transported, with an average daily passenger volume of 16,211. The cash rate of train operation diagram is 99.98%, and the punctuality rate is 99.96%.
Where is the Stone Village in Zhejiang?