Floors: There are 89 floors in total, and the number of floors used is 81. Floor 81 and above are equipment floors, maintenance ladder brackets and mezzanines.
Floor usage:
B4-B2 parking, hotel logistics
B1 non-motor vehicle parking, hotel logistics, equipment room
B1 mezzanine catering, food store, hotel logistics, equipment room, sightseeing lobby
1F top business lobby, hotel lobby, banquet hall, shopping plaza, commercial atrium
2F-5F Shopping Plaza
6F Shopping Plaza, Banquet Hall, Cinema
7F Conference Hall, Banquet Hall
8F-9F Fitness Center, Swimming Pool, Outdoor Garden, SPA< /p>
10F Office
11F-12F Refuge Floor, Equipment Floor
15F-41F Super 5A Grade A Office Building
42F-43F Equipment Room
45F-46F Sky Lobby/Restaurant
47F Coffee Bar
48F Hotel Logistics
49F-71F Six-star Intercontinental Hotel Guest Rooms
72F Observation Floor
73F, 75F Equipment Floor
76F-77F Chinese Restaurant
78F-79F Special Western Restaurant
p>
80F-81F Presidential Suite
82F Greenland Plaza MOUNT CLUB
83F Water Tank Floor
85F-86F Computer Room
87-89F Lighthouse Elevator: 7 vertical elevators, 6 groups of 12 escalators (Mitsubishi);
Air conditioning: VAV variable air volume full air conditioning system to maintain indoor constant temperature and humidity, according to the actual load in the air-conditioned room Changes are used to adjust the air supply volume. The air-conditioning box adopts the VTS brand imported from Europe, the terminal equipment adopts the American Royal brand, and the air-conditioning host adopts Yuanda lithium bromide direct-fired unit;
Water supply system: German Wilo water storage with variable frequency pressurization The system directly supplies each floor;
Fire alarm: adopts bus structure to ensure the stable operation of the fire protection system;
Monitoring and security: independent subsystem, including CCTV, wireless patrol, Parking lot management and integration with BMS;
Communication: 24-core optical cable is sent to the building telephone room (equipped with a telecommunications module bureau), and 6-core optical cable is sent to the weak current well on the floor, which can easily implement program-controlled switches or Virtual network communication. Main building exterior wall: unitized glass curtain wall, low-radiation high-efficiency insulating glass (LOW-E insulating glass);
Podium exterior wall: dry-hanging stone, silver gray LOW-E insulating glass, cup lighting fixtures Forming a very rhythmic light beam;
Lobby: dark granite floor, metal aluminum plate ceiling, selected natural black hole stone wall, noble style;
Office floor elevator hall: high-end glass Bricks and stainless steel decorative strips on the floor, painted glass and stainless steel decorative strips on the walls, mirror glass and stainless steel decorative ceilings, elegant quality;
Office floor corridor: artistic vitrified tiles and stainless steel floor tiles complement each other, metal plate ceiling , artistic stone walls, top taste;
Public bathroom: equipped with internationally renowned Spanish Roca sanitary ware, extraordinary comfort. It is reported that the Zifeng Building poured 12,000 cubic meters of concrete at one time, and the continuous pouring time was as long as 55 hours, creating many firsts in the history of Nanjing architecture in terms of continuous concrete pouring and pouring time.