chengdu metro line 4
Introduction:
1. Chengdu Metro Line 4 is an east-west trunk subway in Chengdu. The first phase was approved in July, 20 1 1 year, and the construction started in February, 201year, and was put into production on February 26th, 201year. The second phase was put into trial operation on June 2, 20 17.
2. Chengdu Metro Line 4 is the third subway line in Chengdu, operated by Chengdu Metro Co., Ltd. Metro Line 4 serving Wenjiang District, Qingyang District, Jinjiang District, chenghua district, Longquanyi District and Chengdu connects many scenic spots in Chengdu, which is another "one stop, one scene" subway line created by Chengdu.
3. By the end of 2065438+June 2007, the total length of Chengdu Metro Line 4 was 43.3 kilometers, with 28 underground stations (including 9 interchange stations), 2 elevated stations, Wen Jia Automobile Factory and Xihe Parking Lot.