Work together to prevent and reduce disasters and build harmony with one heart and one mind. Before facing all kinds of sudden disasters and accidents, you can prepare the emergency plan in advance. What should be written in the emergency plan? Considering your needs, I specially bought the "template encyclopedia of emergency plan for water and power outages in factories" for reference only. Let's take a look!

Template of Emergency Plan for Water and Power Shutdown in Factory 1 1. Purpose

In order to prevent sudden power failure from causing injuries to people in shopping malls and ensure the safety of goods.

Second, the scope of application

Applicable to shopping mall properties in this area.

Iii. responsibilities

1, high-voltage power distribution engineering personnel are responsible for understanding the causes of power failure, and promptly inform the monitoring center and important tenants to do a good job of sending standby power and restoring normal power supply.

2. The monitoring personnel are responsible for explaining the power outage and closely monitoring the key parts, and cooperate with the security personnel to prevent personal injury and loss of goods.

3. The security personnel are responsible for the security work of each entrance and exit and the security patrol work of the power outage area, and cooperate with the floor management personnel to do a good job in the evacuation of customer personnel and the safety of goods.

4, management staff to do a good job of organization and coordination and aftermath.

5. Floor management personnel and shop assistants should do a good job in guiding customers to evacuate and ensuring the safety of goods in merchants' cabinets.

Fourth, the processing flow

(a) power emergency procedures:

Engineering measures

2. Safety measures

Be reasonable after doing good.

(2) Emergency treatment plan for power failure:

1 When a power failure accident occurs in the shopping center, the engineering technical supervisor must go to the high-voltage distribution room immediately, and the on-site (on duty) high-voltage distribution technicians shall take the following measures in time:

1. 1 When there is a power outage in the shopping center area,

1. 1. 1 The maintenance technicians will inform the monitoring center of the power outage area and situation while checking the equipment failure of the shopping center, so as to take relevant measures. (Important tenants in the power outage area should also be informed at the first time).

1. 1.2 to the power outage area, and check the cause of the failure. Check the running status of the equipment, record the working parameters, and shut down the mechanical and electrical equipment or power consumption unit with heavy load to avoid the instantaneous current from damaging the equipment when the power supply is restored.

1. 1.3 After finding out the fault, the engineering department shall organize manpower to repair it.

1. 1.4 restore the normal operation of undamaged areas at the same time of emergency repair.

1.2 power failure (high voltage power failure) caused by external power supply.

1.2. 1 Start the standby power supply of the shopping center (under normal circumstances, the main and standby power supplies are automatically switched), and the power supply for important parts such as fire elevators, fire walkways, water pumps and evacuation lighting must be guaranteed.

1.2.2 technicians call the power supply department to inquire about the cause of the failure and save the reply.

1.2.3 notify the monitoring center and important tenants.

1.2.4 organize personnel to check and maintain facilities and equipment before power supply is restored. (See Annex I for specific operations)

2, property personnel safety measures are as follows:

2. 1 Monitoring and security personnel

2. 1. 1 Notify the property management personnel and the engineering supervisor in time when receiving the power outage reason (or when discovering or receiving the power outage report).

2. 1.2 Focus on monitoring the power outage area.

2. 1.3 Inform the security supervisor (personnel) to rush to the power outage business area immediately and strengthen the care (especially the cashier). (Its personnel transfer is unified by the security supervisor)

2. 1.4 when necessary (after the total value is confirmed), inform the personnel present through fire broadcast. (The specific content should be confirmed by the total value).

2. 1.5 Maintain order, strengthen patrol in power-off areas, control personnel to enter and exit, and close the access channels when necessary (confirmed by the total value).

2. 1.6 after receiving the evacuation decision, assist the property management personnel and floor management personnel to guide the shoppers and VIPs present.

2.2 Property management personnel

2.2. 1 After receiving the power outage report, rush to the scene as soon as possible.

2.2.2 Organize and coordinate on-site work and make a decision on whether to evacuate (the total reported value will be determined).

2.2.3 In case of power failure, if the operators need special services, the management personnel shall provide necessary services, such as the transportation of the wounded.

2.2.4 In case of personal injury and damage to facilities and equipment, apply for compensation to the insurance company in time.

3. The floor management personnel, shop assistants and cashiers shall take the following safety measures.

3. 1 In case of power failure, keep calm and avoid leaving the business site to ensure the safety of goods and property.

3.2 When necessary, inform customers to suspend business temporarily.

3.3 After receiving the evacuation notice, guide the customer to take the safe passage and leave the mall.

3.4 After the power supply is restored, assist the management personnel to do a good job of inventory.

(3) Matters needing attention in emergency treatment of power failure:

1. In case of power failure, it is necessary to check whether there are passengers trapped in the elevator, and rescue them according to the emergency plan for elevator trapped people when necessary.

2. The electrician should check the telephone, weak current monitoring, fire control and other systems to make them in normal working condition.

3. The power provided by the standby power supply of the shopping center cannot meet the normal operation needs, so the lighting in secondary places may be insufficient. Property personnel should pay close attention to the traffic on sidewalks and lanes, and place lighting objects and warning signs to facilitate pedestrians when necessary.

4. In the absence of emergency lights, staff in secondary positions, such as cleaning, should hold flashlights to escort guests in and out under the unified coordination of the property manager.

5. The management department shall adjust the personnel access route in a timely manner.

Template of Emergency Plan for Water and Power Cut-off in Factory Part 2 1. Purpose: To better cope with sudden water and power cut-off failures and avoid unnecessary losses.

Scope of application: all staff of radiology department.

Third, the standard:

(1) Power failure

1, in case of any unexpected power failure, immediately inform the patient currently under examination, and use emergency facilities such as flashlights and emergency lights to ensure the safety and evacuation of the patient currently under examination, and do a good job in patient comfort and explanation.

2, immediately turn off the power supply of all kinds of electrical equipment, and at the same time, call the personnel on duty of the hydropower group on duty to understand the reason and duration of the power outage.

3, according to the possible power outage time, properly arrange the patients waiting for examination.

4, timely report to the department head, and do a good job of related succession.

5. Confirm that the power supply is back to normal. After the voltage is stable, restore the power supply of all equipment that should operate normally according to the operating procedures.

6, found that equipment failure caused by sudden power failure, timely notify the equipment department and medical engineering department, and report to the department head.

(2) Emergency procedures for temporary power failure

(1) When there is a temporary power outage, you should immediately call the hydropower unit to find out the reason and duration of the power outage.

(2) Inform the emergency team leader or the chief on duty to explain the situation.

(3) If the power outage is short (within 5 minutes), the patient should be informed and wait patiently for the power to come before turning on the equipment.

(4) If the power outage lasts for a long time (more than 5 minutes), after the standby generator is started, ensure the power supply of the whole hospital; All large-scale equipment in the department can be turned on and run normally only after normal power supply.

(5) Make operation records of standby second power supply and self-provided power generation.

(6) When there is a power outage due to internal reasons in the hospital, it is necessary to find out the cause of the power outage, whether it is a high-voltage circuit or a low-voltage circuit. If the high-voltage circuit fails, contact the emergency repair team of the power supply department in time to recover as soon as possible to ensure power consumption; If the hospital low-voltage circuit fails, we should quickly find out the reason and restore the circuit according to the operating regulations.

(3) Water failure

1, when water is cut off, do a good job of emergency water supply in time, and turn off the power supply of all water heaters in the department in time to avoid the water heaters burning out due to water cut off.

2, immediately call the hydropower group on duty personnel, understand the reason of water cut.

3. Store a proper amount of water for washing hands.

4, when the normal water use is restored, it is necessary to check the faucet in the department to prevent water overflow and waste caused by water stoppage.

Template of Emergency Plan for Water and Power Cut-off in Factory. 3 I. Purpose

In order to ensure that the rescue work can be carried out quickly and effectively after the sudden power failure for a long time in the process of tower crane lifting operation, and to minimize the risk of mechanical injury, the project department has specially formulated emergency treatment and rescue plans.

Second, the organization

This project department set up an emergency rescue command team to be responsible for command and coordination.

Team leader:

Members:,,,,,

Iii. responsibilities

1.Be responsible for on-site command, understand the lifting height of tower crane and the position of boom, and organize on-site rescue work.

2. Responsible for site protection, set up a cordon, maintain order and evacuate personnel.

3. Be responsible for notifying the equipment unit to organize rescue, call rescue personnel, and safely eliminate the danger in time.

Fourth, emergency rescue procedures

When the tower crane suddenly encounters power failure (long time) in normal operation, the lifting object is suspended in the air. And the time is long, the following emergency measures should be taken:

1.Turn all controllers to "0" position and disconnect the main power supply.

2. The professional maintenance personnel intermittently open the brake of the hoisting winch or open the switch handle by hand, so that the lifted object can descend for a short distance at a time, and the descending speed shall not exceed the rated speed, and finally the lifted object can fall to the ground.

3. If there are obstacles and houses under the hanging objects, the following measures should be taken:

(1) according to article 2, firstly lower the lifted object to a safe distance above the object or house, and then take measures to brake the slewing device or pull the wind rope to prevent it from rotating under the action of wind;

A. Turn the jib of tower crane to an open place, or to a safe part of a building, or temporarily put it on a steel platform capable of bearing the tonnage of a lifting object and monitor it, brake the slewing, set a warning line, and then operate according to Article 2;

(2) Set up a warning area below the hanging object, and assign special personnel to supervise it, so as not to let people walk or work under the hanging object;

(3) If the office area is under the hanging object, the personnel in the office under the hanging object must leave temporarily and take measures according to the method in Article (2);

(4) If there is a residential building below the hanging object, the project department will persuade and guide the residents in the house below the hanging object and take temporary evacuation measures;

(5) After the power supply is turned on, conduct a comprehensive inspection, and then transfer the object to the designated place for lowering.

4. Immediately organize safety self-examination and self-correction, eliminate hidden dangers, and ensure construction safety; Immediately organize the safety re-education of all construction workers by analogy, improve the awareness of safety precautions, observe the rules and discipline, and prevent similar accidents.

5. In the process of emergency rescue, in case of falling accident, immediately implement the emergency treatment and rescue plan for falling accident.

V. Relevant mailing addresses

1.Company Tel:

2. The engineering management department telephone:

3. Telephone number of equipment unit:

4. Project Manager: Mobile phone or telephone:

Deputy Project Manager:

Project Engineer:

The builder:

Safety officer:

Material equipment member:

Attached is the address of a nearby hospital:

Industrial accidents refer to the catalogue of characteristic hospitals (please choose according to the actual situation of the project)

Template of Emergency Plan for Water and Power Cut-off in Factory. 4. Purpose of Formulation

In order to deal with the sudden large-scale power outage accident in the hospital, organize and restore power supply quickly and orderly, ensure the safety of patients' lives and reduce property losses, ensure the smooth use of electricity in the hospital, and promote the institutionalization and standardization of accident emergency work, this plan is formulated in accordance with relevant national laws and regulations and the actual situation of our hospital.

Scope of application

The "sudden large-scale power failure" mentioned in this plan (hereinafter referred to as "large-scale power failure accident") refers to the sudden failure of the safety defense line of large-scale power system in the whole hospital due to the damage or destruction of important facilities caused by serious natural disasters, and the accident of large-scale collapse or collapse of the power grid.

Three emergency principles

The principle of "prevention first, constant vigilance" and the principle of "unified leadership, perfect mechanism, clear responsibility, strengthened cooperation, quick response and decisive measures" are implemented in the treatment of large-scale power outage accidents.

Four organizations

The hospital set up an emergency leading group for large-scale power failure accidents, and set up an emergency repair team.

1 Emergency leading group for large-scale power failure accident in hospital

Team leader: general manager

Deputy Head: Dean

Member: Manager of Personnel Administration Department

Logistics supervisor

Electrical maintenance worker

Responsibilities:

(1) Do a good job in daily safety for electric power maintenance technicians, implement the responsibility system for production safety, and prevent large-scale power failure accidents.

(2) In the event of a large-scale power outage, do a good job in emergency response to the power outage and restore power supply as soon as possible.

(3) According to the severity of large-scale power failure accident, decide to start and terminate the emergency plan.

(4) Report the accident to the superior in time and make it public.

(5) Request external support when necessary.

(6) The leader of the leading group is the first person responsible for fulfilling the provisions of this plan. Member units shall, under the unified command of the leading group, carry out their duties and cooperate with each other to do a good job in the comprehensive social emergency work in the event of a large-scale power outage.

2 emergency repair team

Captain: logistics supervisor

Member: Electrical Maintenance Worker

Responsibilities: Organize personnel to carry out rescue operations in case of accidents; Report the accident to the command team, send a request for help to the power supply department if necessary, and then summarize whether it should be a circuit or a low-voltage circuit. If the high-voltage circuit fails, the hospital power maintenance technician will immediately introduce the standby power supply, and should contact the emergency repair class of the power supply department in time to recover as soon as possible to ensure power consumption; If the hospital mortgage circuit fails, we should quickly find out the reason and restore the circuit according to the operating regulations.

(2) Emergency procedures of hospital departments

1 after receiving the power outage notice, all departments should cut off all the power supplies and put them into use after the circuit returns to normal.

After receiving the power outage notice, immediately prepare for the power outage. If there is a rescue patient, use the standby power supply.

After the sudden power failure, immediately look for the power method to rescue patients and their operation, maintain the rescue work, and turn on the emergency lights. And shall promptly notify the power maintenance technician or the chief duty officer.

4 critically ill patients who use a ventilator during surgery should usually have a simple respirator beside the machine. In case of sudden power failure, the medical staff will immediately disconnect the ventilator and use a simple respirator to maintain breathing. For patients who use electric nitrogen absorption, use a 50ml syringe to connect the nitrogen absorption tube to absorb nitrogen.

5. If the power supply fails suddenly on both lines, the medical staff should first ensure the patient's rescue before the generator in the hospital supplies power; Nurses should be calm and calm. Those who go on the ventilator should hold the ball by hand, those who go on the monitor should measure their blood pressure and pulse manually, and those who take nitrogen by electric motor should take a 50 ml syringe and suck it with a nitrogen suction tube. Observe closely and ask for changes. The rest of the staff should immediately call the electric power maintenance technician and the personnel administration department and use emergency lights for lighting.

6 strengthen the patrol ward, appease patients, and pay attention to fire prevention and theft.

After the elevator encounters a sudden power failure, the logistics personnel should do a good job of passengers' ideological work, make a phone call to the outside and let all passengers out manually.

safeguard measure

1 the power maintenance technician should do a good job in the maintenance of the generator every day to ensure that the generator is put into use at any time.

2 Power maintenance technicians should master power supply knowledge and operation specifications at ordinary times, and pay attention to operation safety.

3 Clinical departments are routinely equipped with emergency lights, flashlights and other lighting materials, which are regularly checked and kept in good condition.

The logistics department should organize emergency power failure drills, twice a year 1-2 times. Through the drills, we can familiarize ourselves with the emergency handling procedures for sudden power failure and ensure the safety of patients.

Circuit or low voltage circuit. If the high-voltage circuit fails, the hospital power maintenance technician will immediately introduce the standby power supply, and should contact the emergency repair class of the power supply department in time to recover as soon as possible to ensure power consumption; If the hospital mortgage circuit fails, we should quickly find out the reason and restore the circuit according to the operating regulations.

Factory water supply and power outage emergency plan template encyclopedia 5 < 1 > leadership organization

Commander in chief: day shift; Night shift: cadres on duty

First, the deputy director refers to the composition and responsibilities of emergency rescue.

Deputy commander:

Team members:

< 2 > responsibilities

1, Chief Commander: responsible for organizing and directing the emergency rescue of the whole plant;

2. Deputy Commander-in-Chief: responsible for assisting the commander-in-chief in the specific command of emergency rescue;

3. Team members: work under the unified command of the headquarters, and the responsibilities of each section chief in accident emergency rescue are:

1. Steelmaking foreman: responsible for on-site command of steelmaking section;

3. Continuous casting foreman: responsible for on-site command of continuous casting section;

4. Mechanic foreman: assist the general commander in charge of the on-site command of emergency repair work;

5. Electrical repair foreman: assist the general commander in charge of the on-site command of emergency repair work;

6. Peripheral foreman: assist the general commander in charge of the on-site command of emergency repair work;

7. Engineer: responsible for the technical guidance of emergency repair site;

Second, the emergency communication:

When dealing with the accident, all personnel involved in emergency rescue and emergency repair should keep the communication unblocked. If the signal is unstable or interrupted, they should immediately use the fixed telephone or mobile phone in the factory to get in touch with the chief commander in time and clearly explain their location.

Third, the accident treatment plan:

1, when there is a power failure accident, the main controller of the water pump room should not panic, but should be calm. The safety water tower in the southern district can provide water for about 15 minutes, during which the main controller can completely restart the water pump after power transmission;

2. Under normal circumstances, the diesel engine can be started automatically after the power failure in the North District. The main controller of the water pump room only needs to press the button combining the clutch on the operation panel of the control box, and then hold down the speed-up button until the speed displayed on the speed meter can no longer rise;

3. If the diesel engine does not start automatically, press the reset button first. If it doesn't work again, turn the change-over switch to the manual position. At this time, the diesel engine can be started as long as the finger presses the start button.

4. When the diesel pump is successfully started, the master controller of the water pump room shall immediately report the situation to the shift supervisor and notify the converter master control room and the continuous casting master control room.

5. After receiving the alarm call from the water pump room, the converter master control room should immediately stop smelting with a gun, and immediately notify the shift supervisor of the situation, and the shift supervisor will report to the superior.

6. After receiving the alarm call from the water pump room, the master control room of continuous casting should pay close attention to the quantity of secondary cooling water, and try to finish the molten steel in the ladle if conditions permit.

7. After the diesel engine is started, the master engineer in the water pump room can appropriately adjust the manual valve at the entrance to increase or decrease the water pressure, so as to achieve the safe water use required by the equipment.

IV. Preventive Measures and Assessment

1, the master engineer of the water pump room should closely monitor the water level of the safety water tower in his usual work, and report to the shift supervisor immediately if there is any abnormal situation, so as to facilitate timely treatment to eliminate hidden dangers;

2, the safety water tower outlet pipe manual valve to observe at any time, in case someone misoperation;

3, each shift personnel to patrol the diesel engine operation box panel of the switch, indicator light instructions. For example, the selector switch should be in the automatic position; Turn on the key switch of the power supply; Whether the floating charge indicator light is on or not, and whether the alarm light is on or not, and reset it in time if it is on.

Emergency plan for sudden water and power failure of the company II

1. Upon receiving the notice of power outage and water cut, the security department and the engineering department shall notify each department in advance of the power outage and water cut lines, areas, time, elevator use and safety precautions, and issue the notice of power outage and water cut at the main entrances and exits; At the same time, engineers should do well the emergency work before power failure and water cut.

2. Without receiving any notice, in the case of sudden power failure and water cut-off, engineers should immediately confirm whether it is internal fault power failure or external power failure and water cut-off. If it is an internal fault with power failure and water cut off, immediately send someone to find out the reason and take measures to prevent the fault from expanding; In case of external power failure and water cut-off, on the one hand, it is necessary to prevent accidents caused by sudden calls to water, on the other hand, it is necessary to call the power bureau or water supply company to inquire about the power failure and water cut-off, to know when to resume power supply and water supply, and to inform DM of the information so as to prepare for DM consultation.

3. The inspectors shall immediately go to each floor separately with the engineering personnel to check the elevator operation, and immediately rescue the elevator people according to the emergency plan for the trapped elevator.

4. The engineering department will immediately notify all departments of the power outage and water cut, and issue a notice of power outage and water cut at the main entrances and exits. When necessary, the emergency broadcast system will be enabled to inform the residents, asking them to remain calm and take precautions.

5. In case of sudden power failure, when the shopping mall is open at night, the patrol personnel should assist the shopping mall to maintain good order, guide the merchants to use standby lighting such as emergency lighting to evacuate customers, and pay attention to fire prevention to prevent fire.

6. Arrange employees to the main entrances and exits of the community and the elevator hall to maintain order, and the patrol personnel will strengthen security measures to prevent people from creating chaos, fish in troubled waters, and close the door when necessary.

7. Send someone to watch the office and duty room, patiently receive inquiries from residents and merchants, do a good job of explanation and guidance, and prevent conflicts with residents and merchants.

8. Record the time, causes, countermeasures and losses caused by the power failure and water cut-off accident in detail.

9. Preventive measures for sudden power failure:

1) Engineering personnel should always check the emergency lighting and emergency broadcasting system to ensure normal operation.

2) The management and operation department should remind office residents and merchants to prepare some emergency lights or candles in case of power failure.

3) The security department and the engineering department should be equipped with portable emergency lighting besides flashlights for patrol and maintenance, and they should be charged and maintained at all times to keep them in good condition.

10. Emergency measures for sudden water stoppage:

1) Engineers should always check the water supply pipes and valves, and maintain them in time if any abnormality is found.

2) In case of sudden water cut-off, the site protection measures should be taken to avoid accidents.

3) After sudden water cut-off, you should contact the water supply company to do a good job of daily water supply. In case of small-scale water cut-off, the property service center should promptly ensure the owner to solve the normal domestic water use.

The company's emergency plan for sudden water and power failure 3

I. Power failure

(a) the logistics management office received a notice of power outage and water cut from the relevant departments, and asked about the time of power outage and water cut;

(two) the logistics management office shall promptly notify the person in charge of each canteen and booth;

(three) the logistics management office timely report to the leadership.

Second, power generation

The logistics electrician immediately uses the generator to generate electricity to ensure the normal use of electricity in the canteen.

Third, post a warm reminder to inform teachers and students of the water and power cuts, reminding teachers and students to bring change for meals.

Fourth, the canteen food processing.

If there is a plan to cut off power and water:

(a) breakfast power and water:

(1) Prepare water from the container the night before, make steamed buns, and steam them with a diesel stove the next morning; (2) Provide fried powder, fried rice, boiled noodles and porridge as much as possible; (3) provide eggs and milk.

(2) Power failure during lunch and dinner:

(1) Rice: Cook the rice in advance; (2) Dishes: arrange cooking according to the power generation time of the generator; Use a coal-fired stove or a briquette stove to stir-fry dishes.

In case of sudden power failure:

(a) breakfast power failure:

(1) Hand-wrapped buns and cooked with a diesel stove; (2) Provide fried powder, fried rice, boiled noodles and porridge as much as possible; (3) provide eggs and milk.

(2) Power failure during lunch and dinner:

(1) Rice: arrange steamed rice in time after the generator generates electricity; (2) Dishes: After the generator generates electricity, arrange cooking in time or use a coal steam stove or a briquette stove to cook.

5. Food sales. Teachers and students can buy meals in cash.