Current location - Recipe Complete Network - Healthy recipes - A simple contract for the purchase and sale of stone products
A simple contract for the purchase and sale of stone products

Simple contract template for the purchase and sale of stone products (selected 6 articles)

In today’s evolving world, contracts appear more and more often. Signing a contract can balance the interests of both parties. of equal status. So what issues do we need to pay attention to when drafting a contract? The following is a simple contract template for the purchase and sale of stone products that I have collected and compiled (selected 6 articles). You are welcome to learn from and refer to it. I hope it will be helpful to you.

Simple contract for purchase and sale of stone products 1

Purchaser: Hereinafter referred to as Party A

Supplier: Hereinafter referred to as Party B

According to the "Contract Law of the People's Republic of China" and relevant legal provisions, in order to ensure the legitimate rights and interests of Party A and Party B, Party A and Party B signed this contract on the basis of equality, voluntariness, good faith and consensus through consultation, and abide by it. The following terms shall be fulfilled simultaneously:

1. Supply materials: gravel, medium coarse sand, powdered sand, etc.;

2. Price: gravel, medium coarse sand The price is yuan/cubic meter, powdered sand yuan/cubic meter;

3. Delivery time: subject to the arrival time notified by Party A;

4. Supply location: Construction site of xx road in xx village, xx township;

5. Transportation: The loading and unloading method and cost burden shall be borne by Party B;

6. Quality requirements and acceptance standards: After Party A receives the goods It should be tested first and can only be used after passing the goods. If there are any quality problems, Party B should be notified in writing within 3 days from the date of receipt of the goods. Otherwise, the quality of the batch of sand and gravel will be deemed to be fully qualified. If both parties confirm that the quality of the sand and gravel is indeed unqualified, Party B shall transport the unqualified sand and gravel back and bear the shipping costs incurred, but Party A shall not bear other responsibilities. At the same time, Party B shall replace the sand and gravel with qualified sand and gravel within days.

7. Payment method: Party B’s payment for materials amounts to RMB 10,000, and Party A pays 70% of Party B’s materials. The remaining 30% will be paid in one lump sum after the project is completed;

8. Measurement standards: After each batch of goods from Party B arrives at Party A's construction site, Party A's material clerk will count the quantity on site, determine the quantity and sign After both parties sign, Party A's material clerk will provide the material receipt in triplicate, and give one copy to Party B as the basis for settlement;

9. Liability for breach of contract:

1 . If Party A's one-time demand exceeds 200 cubic meters, it must notify Party B in writing one week in advance, otherwise Party B will not bear any responsibility.

2. Party A is unable to settle the payment as stipulated in the contract, and will pay Party B a penalty of 5% of the total payment for overdue payment.

10. For matters not covered in the contract, Party A and Party B shall negotiate and supplement. This contract is made in triplicate, with Party A and Party B each holding one copy, and the guarantor shall hold one copy. It shall be signed and sealed by both parties to take effect.

Party A’s unit name (seal) Party A’s unit name (seal)

Unit address: Unit address:

Legal representative: Legal representative: < /p>

Authorized agent: Authorized agent:

Time: Time: Simple contract for purchase and sale of stone products 2

Demanding party: Signing date:

Supplier: Signing location:

In order to enhance the sense of responsibility of both parties, and ensure that both parties achieve their respective economic goals, this contract is concluded after full negotiation between the supply and demand parties, in order to ensure that both parties abide by it. .

1. Product name, specifications, quantity, unit price (excluding tax), amount:

2. Quality requirements and technical standards:

3. Delivery Delivery date:

IV. Delivery method and address:

V. Transportation method, arrival station (port) and cost burden

The transportation method is transportation. The supplier shall contact the supplier for transportation. The supplier shall be responsible for the safe loading of the products and bear the loading costs in the supplier's factory. The transportation costs shall be borne by the supplier.

6. Packaging standards, supply and recycling of packaging materials

Ensure that products meet normal transportation, loading, unloading and warehousing requirements, and packaging materials will not be recycled.

7. Acceptance standards and methods:

Acceptance shall be carried out in accordance with the standards in Article 2 of this contract, and the goods shall be inspected at the supplier's factory.

8. Agreement on settlement method, time limit and tax invoice

9. Liability for breach of contract:

1. During the performance of the contract, either the supplier or the buyer If one party terminates the contract unilaterally, it will bear 20% of the total contract amount as liquidated damages.

2. If the quality of the supplier's products cannot meet the requirements of the contract, the buyer has the right to return or exchange the goods.

3. The supplier shall not subcontract this contract to a third party.

10. Force Majeure

When either party, the supplier or the buyer, is unable to perform the contract due to force majeure, it shall promptly notify the other party of the reasons for the inability to perform or the inability to fully perform. After obtaining relevant After the competent authority proves it, it will allow postponement of performance, partial performance or non-performance of the contract, and may be partially or completely exempted from liability for breach of contract depending on the circumstances.

11. Methods for resolving contract disputes

If there is a dispute during the performance of this contract, the two parties shall negotiate and resolve it in a timely manner; if the negotiation fails, either party has the right to appeal to the competent authority. Proceed in the competent People's Court.

12. Other agreed matters

1. This contract will take effect after being signed and sealed by both parties. The fax of the contract confirmed by both parties will be valid.

2. This contract is made in two copies, with each party holding one copy.

3. Both parties can negotiate and sign a supplementary agreement for matters not covered in this contract. If the supplemental agreement is inconsistent with this contract, the supplemental agreement shall prevail.

Party A’s unit name (seal) Party A’s unit name (seal)

Unit address: Unit address:

Legal representative: Legal representative: < /p>

Authorized agent: Authorized agent:

Time: Time: Simple contract for purchase and sale of stone products 3

Purchasing unit: (hereinafter referred to as Party A)

Supplier: (hereinafter referred to as Party B)

1. Its product name, specifications, quality (technical indicators), product price, etc.

1. Product Name: Black Sand Marble;

2. Product specifications: see Party A’s attachment;

3. Product thickness: 25MM thick;

4. Quality (technology Indicators): The product is required to have no color difference, no stains, no errors, no dry cracks, no miscellaneous lines, and no missing corners. Regarding the bending strength of the stone and the freeze-thaw resistance of the stone in cold areas, a test report on the stone shall be provided to Party A in accordance with the relevant national departments. Party B shall process and produce the stone in accordance with the specifications and sizes provided by Party A. If the size of the stone processed by Party B does not match the specifications provided by Party A, Party B shall be fully responsible for the losses caused.

5. Product price: unit price yuan/㎡ (including processing fee, excluding tax);

6. Product quantity: total product quantity is about ㎡;

7. The total amount is RMB, capitalized. (Final settlement will be based on actual processing quantity)

2. Product packaging specifications and costs: Party B is responsible.

3. Acceptance method:

4. Settlement method: Party B will pay a deposit of RMB 50,000 for stone materials from the date of signing the contract, and the settlement will be based on the actual quantity after the stone processing is completed.

Party A’s unit name (seal) Party A’s unit name (seal)

Unit address: Unit address:

Legal representative: Legal representative: < /p>

Authorized agent: Authorized agent:

Time: Time: Simple contract for purchase and sale of stone products 4

Demanding party: (Party A)

Supplier: (Party B)

Party A and Party B have reached an agreement through negotiation on the purchase and sale of the processing and production of Karamaili gold stone and signed this contract.

Article 1. The total contract amount is the tentative price in uppercase: (RMB)

Lowercase: ¥: (RMB)

The final settlement is based on Party A’s final on-site Both parties must agree on the quantity confirmed by acceptance. The purchase quantity is tentatively set at ㎡.

Article 2. Product name, quantity, specification, size, price

Product name, specification, model, quantity (㎡) unit price (yuan) amount (yuan) total calamari gold (in capital letters) ): Article 3. Product technical standards and quality requirements.

1. Party B will provide samples of Kalamaili gold stone (the standard is the National Building Materials Standard for granite stone: premium product (A) grade standard acceptance), which will be sealed by Party A after confirmation and used as a product. Basis for acceptance. The color, pattern, and natural color of the stone meet the requirements of the premium grade (A) standard. The brightness is above 90°, and there is no color difference. Others comply with relevant national standards. The thickness of the stone is 25mm, and the thickness deviation of all stones is allowed to be ±1MM.

2. Before large-scale stone production and processing, Party B should pre-make standard stone sample blocks according to the processing dimensions provided by Party A. After acceptance by both parties, large-scale construction will be carried out after they are deemed to meet the standards, otherwise there will be All quality problems and losses shall be borne by Party B.

3. After all the panels are processed in the order of installation, they must be typed and numbered at Party B's site according to the building facade position (mainly to check color difference and texture), packaged in order, and shipped out of the factory.

4. Party B must ensure that there is a supply of goods greater than 105% of Party A’s total demand for Party A to choose and replace.

7. The detection of radioactive substances in stone must meet relevant national requirements. (National Standard of the People's Republic of China "Limits of Radioactive Nuclides in Building Materials" GB6566-2001)

Article 4. Packaging: Party B shall resolve the packaging method by itself, such as damage during transportation, loading and unloading, etc. The responsibility for quality problems shall be borne by Party B.

Article 5, Acceptance Procedure:

Quality: The stone is domestic high-quality, genuine stone. Both parties shall comply with the stone specifications and dimensions provided by Party A and the seal provided by Party B. Based on samples. After the product is completed and before packaging, Party A shall arrive at the manufacturer designated by Party B for acceptance on time according to the date notified by Party B. Party B must promptly notify Party A. Only after Party A has inspected and approved the products, Party B can package and transport them as required.

Party A:

Party B:

Signing time:

Signing place: Simple version of contract for purchase and sale of stone products 5

Purchaser (A):

Supplier (B):

According to the "Contract Law of the People's Republic of China" and other relevant legal provisions, A Party B formally entrusts Party B to process and produce stone materials. Following the principles of equality, voluntariness, fairness and good faith, and based on the specific conditions of this project, the supply and demand parties sign this contract through friendly negotiation. Once signed and sealed by both parties, it will become legally effective. Both parties Must be strictly implemented.

The agreement is as follows:

1. Product name, model, amount, size requirements

Please see the size sheet for details

2. Road Unit price and payment settlement method for edge stones and flat stones:

1. The comprehensive unit price includes all costs such as finished stone materials, road freight, unloading fees, and other risks. (The above unit price includes labor fees, material fees, equipment and machinery fees, overtime fees on holidays, measure implementation fees, labor insurance premiums, environmental protection and civilized construction fees, dispatch fees, safety and insurance required to implement and complete the contents of this contract. , small tool usage fees, management fees, fees, profits, taxes, etc. All responsibilities, obligations and general risks expressed or implied by Angxian)

 2. Payment settlement method:

2.1. The comprehensive unit price of the contract is guaranteed, and the project quantities will be settled accordingly;

2.2. The currency used for settlement and payment is: RMB.

2.3. There is no advance payment. The goods arrive at the venue designated by Party A on time. Party B will issue an acceptance application and payment to Party A.

The application form will be submitted once after Party A has reviewed and confirmed it. Payment.

3. Quality requirements and technical standards:

1. The mechanical processing gloss of the stone front facing is ≥85°.

2. No native edge collapse or wrestling.

3. Flatness: gap ≤ 1mm.

4. The linear dimension error of the finished board: 1mm.

5. Diagonal error: 2mm.

6. Other standards shall be implemented with reference to the following ministerial standards.

Marble, granite and special-shaped decorative stones are in accordance with the "Natural Marble Building Slabs" (JG/T79-2001) and "Natural Granite Building Slabs" (GB/T18601-2001) of the People's Republic of China. The first-class product requirements in "Heterosexual Decorative Stones" (JG/T847-1999) are the acceptance standards.

7. Other quality requirements agreed upon by both parties:

(1) Stone materials that meet the variety, specifications, and quality requirements of the contract shall be sealed and supplied according to the sealed stone samples.

(2) Quality requirements are processed in accordance with regulations: processed according to size requirements.

(3) The bluestone curb stone is machine-made with a 10mm bevel on one corner in the long direction (texture direction).

(4) Stone is a natural product, and the stone must not have corners, fractures, yellow stone patterns, yellow stone lines, or yellow stone spots. Stone grain, stone lines, grouper spots and color difference shall not exceed 2%.

IV. Delivery location and delivery time:

1. The delivery location is.

2. Party A must notify Party B by phone or text message 2 working days before Party B supplies the goods, and Party B shall supply Party A on time, with a daily supply volume of not less than 1 block.

3. If Party B fails to complete the work on time and within the quantity, Party B shall be responsible for all losses caused by Party A and shall bear a construction period fine of RMB/day.

5. Acceptance standards and delivery period:

1. After the signing of this contract, the supply of stone materials will start on a tentative date. Party A will submit a purchase list to Party B to confirm specifications, quantities and During the delivery time, Party B will organize the transportation of stone products to Party A's construction site within the submitted time, and Party B will be responsible for unloading and transporting them to the location designated by Party A.

2. When Party B delivers the goods, Party A shall review the products and attached documents and technical data together with the supervision unit.

3. After Party B’s stone arrives at the site, representatives from Party A, Party B, the supervisor and the construction unit will go to the site to check and inspect the quality, quantity, model, and specifications of the stone, and check the geometry of the stone. Check the size and color difference, etc. If any stone is found that does not meet the contract requirements or is in short supply, Party A may reject it, and Party B will be responsible for the loss.

4. If the stone cannot arrive at the site on time due to Party B's fault, if the delivery time exceeds 30%, Party A has the right to impose a fine of 10% of the total payment of the batch; if the delivery time exceeds 50%, Party A has the right to persuade them to leave the site; if the delivery time exceeds 100%, Party A will order them to leave the site and pay according to the project settlement agreement.

5. If either Party A or Party B is unable to perform the contract due to force majeure such as natural disasters, it shall issue a certificate from the relevant authority and notify the other party in a timely manner for negotiation.

6. Liability for breach of contract:

1. Party B pays the supply performance fee to Party A. After the supply is completed, Party A shall pay the performance fee in one lump sum to the last batch of goods without interest. Pay Party B.

2. Party B shall comply with the requirements of the contract and supply the goods according to the progress requirements with guaranteed quality and quantity. If Party A fails to pay in time, the supply time will be postponed accordingly; if Party B cannot supply goods on time with guaranteed quality and quantity, Party B will be fined 10% of the total project cost each time. If Party B fails to supply goods on time more than twice (including once) (the time is subject to the time when Party A’s stone entry plan is received), which affects Party A’s construction period, Party A has the right to choose another stone supplier and pay a fine of 5 Ten thousand yuan.

3. If the demander fails to pay the payment within the time limit stipulated in the contract, it shall pay interest to the supplier on the amount in arrears based on the loan interest rate of the People's Bank of China for the same period.

4. If the goods fail to pass the delivery acceptance due to problems with the variety, model, specification, quantity, quality, packaging, etc., they will be deemed to have not been delivered. If the delivery is overdue, the goods will be deemed to have been delivered overdue in accordance with the provisions of this contract. Relevant regulations on late delivery shall be implemented.

5. Unless otherwise provided in this contract, both parties to the contract must fully perform this contract, otherwise, they shall bear corresponding liability for breach of contract.

7. Disputes:

Party A and Party B adhere to the principle of good faith cooperation. If a dispute occurs during the execution of the contract, it shall be resolved through negotiation between the parties. If the parties are unwilling or cannot reach an agreement through negotiation, the two parties agree to submit the case to the Municipal Economic Contract Arbitration Commission for arbitration or to file a lawsuit with the People's Court where the construction site is located.

8. Effectiveness and Termination of the Contract

This contract will take effect after it is signed and sealed by Party A and Party B. It is made in triplicate, two copies for Party A and one copy for Party B, all of which have the same legal effect. Once the payment for this project is paid, the contract will be terminated.

Party A’s unit name (seal) Party A’s unit name (seal)

Unit address: Unit address:

Legal representative: Legal representative: < /p>

Authorized agent: Authorized agent:

Time: Time: Simple contract for purchase and sale of stone products 6

Contract number:

Demand side (hereinafter referred to as Party A): Signing place:

Supplier (hereinafter referred to as Party B): Signing time:

In order to enhance the sense of responsibility of both parties and ensure that both parties achieve their respective economic goals Purpose, in accordance with the "Contract Law of the People's Republic of China", in line with the principle of equality and mutual benefit, and after full consultation between both parties, this contract is specially entered into for both parties to abide by.

1. Stone is a natural product and inevitably has some defects. Party B guarantees that the stone will be basically uniform in color over a large area without obvious defects;

2. According to the properties of the stone, the quality of the stone shall be determined by the country. Stone industry standards are implemented.

1. Packaging standards

2. Delivery method

Party A inspects the goods at Party B’s factory. Party A entrusts ___________ to pick up the goods for inspection at Party B's factory and handle the procedures for signing for the goods. If Party A changes or adds a signee midway, it must notify Party B in writing in advance and issue a new power of attorney. Otherwise, all losses caused thereby will be borne by Party A. Party is responsible.

3. Delivery location

4. Acceptance terms

Party A will send personnel to inspect and accept in Party B’s factory. The acceptance standards shall be the national stone industry standards. Load the vehicle after passing the test; the acceptance time shall be before the expiration of the delivery period, and Party B shall notify Party A.

5. Delivery time

The delivery time of the stone is within days from the date when Party B receives the advance payment from Party A.

VI. Date and method of payment

1. Within three days from the date of signing the contract, Party A pays Party B a deposit in RMB yuan (¥ yuan). The deposit will be in the final batch. The payment will be replenished.

2. The payment method is cash on delivery, and Party A must settle the payment for the batch of goods before picking up the goods.

VII. Force Majeure

If either Party A or Party B is unable to perform the contract due to force majeure (such as war, earthquake, tsunami, flood, major public health disease, etc.), it shall The party shall promptly notify the other party of the reasons for the inability to perform or the inability to perform completely, and shall provide proof from the competent authority within 10 days, allowing delayed performance, partial performance or non-performance of the contract, and may be partially or completely exempted from liability for breach of contract depending on the circumstances.

8. Methods for resolving contract disputes

Any disputes arising during the performance of this contract shall be resolved through negotiation between Party A and Party B. If negotiation fails, the parties shall file a lawsuit in the People's Court in accordance with the law.

9. Others

This contract shall take effect from the date of signing. During the performance period of the contract, neither Party A nor Party B may change or terminate the contract at will. If there are any matters not covered in the contract, both parties must first negotiate and sign a supplementary agreement. The supplemental agreement has the same effect as this contract.

This contract is made in duplicate, with Party A and Party B each holding one copy.

Party A’s unit name (seal) Party A’s unit name (seal)

Unit address: Unit address:

Legal representative: Legal representative: < /p>

Authorized agent: Authorized agent:

Time: Time: ;