The Third Xiangjiang Bridge in Zhuzhou (also known as the Jianning Bridge) is a single-tower, single-cable-plane cable-stayed bridge with six lanes in both directions. The bridge is 30 meters wide and 1,721 meters long. Construction started on March 8, 2003 and opened to traffic on September 30, 2005. The cost of the project is about more than 200 million yuan, and it is constructed by the Fifth Engineering Co., Ltd. of China Railway Major Bridge Bureau Group. After the opening of the third bridge to traffic, it has beneficially alleviated the traffic pressure on the main roads in Zhuzhou City and enhanced the city's comprehensive strength.
The Third Xiangjiang River Bridge in Zhuzhou is a single-tower, single-cable-plane cable-stayed bridge with six lanes in both directions. The bridge is 30 meters wide, with a total length of 1,721 meters. The main bridge of the cable-stayed bridge is 457.7 meters long, with a main span of 240 meters and a side span of 217.7 meters. The bridge deck is 30 meters wide and has 6 lanes in both directions. The main tower is 138 meters high and there are 31 pairs of cable-stayed bridges. So. The Jianning Bridge is an important sub-project of the Zhuzhou Express Ring Road project. It is located 6 kilometers upstream of the Zhuzhou Bridge and connects the West Ring Line and the South Ring Line of the Zhuzhou City Express Ring Road. The entire bridge is 1,721 meters long, with a bridge deck width of 3O meters and a total of 6 lanes in both directions. Investment of 235 million yuan.
Construction Significance
After the Zhuzhou Xiangjiang River Third Bridge was opened to traffic, it has beneficially alleviated the traffic pressure on the main roads in Zhuzhou City, enhanced the city’s comprehensive strength, and promoted the urban modernization process; it will also contribute to the promotion of long-term development. The economic integration process of Zhuzhou and Tan is of great significance.
Construction History
Construction started in October 2001. It was designed by the China Railway Bridge Survey and Design Institute. The bridge type is a single-tower single-cable-plane cable-stayed bridge;
2003 Construction started on March 8, 2005;
It was closed on September 6, 2005;
On September 30, 2005, Zhuzhou City’s third extra-large urban bridge across the Xiangjiang River —The Jianning Bridge was completed and opened to traffic.
Bridge Culture
The deck of the Third Xiangjiang Bridge in Zhuzhou is pulled by 31 pairs of cable-stayed cables, and 72 pieces of engraved calligraphy works from a public collection are inlaid on the bridge guardrails. Minister of Land and Resources Sun Wensheng, Cao Bochun, Secretary of the Guangxi Zhuang Autonomous Region Party Committee, Zhou Bohua, Governor of Hunan Province, and famous calligraphers General Li Duo and Li Li inscribed the name of the Jianning Bridge.
For more exclusive information about the construction industry, please pay attention to the WeChat account of Construction Network in real time.
For more information about the writing and production of bid documents and improving the bid winning rate, click on the customer service at the bottom for free consultation.