Introduction of Pazhou Bridge
Weizhou Bridge has a total length of 4.2km, a total length of 2.774km and a maximum span of130m, with a total investment of over 700 million yuan. It is designed as a two-way six-lane bridge. The project has complex hydrogeological conditions, great construction difficulty and novel design, and is listed as a key project in Guangzhou. The project started on April 28th, 2005.