Current location - Recipe Complete Network - Take-out food franchise - Operation schedule of Foshan Metro Line 2 in the Spring Festival of 2123 (when will the second phase of Foshan Metro Line 2 start)
Operation schedule of Foshan Metro Line 2 in the Spring Festival of 2123 (when will the second phase of Foshan Metro Line 2 start)

Operation schedule of Foshan Metro Line 2 in the Spring Festival of p>2123:

Click to view: Daily Operation Schedule of Foshan Metro Line 2

ps: You can extend the service time based on the time found in the Daily Operation Schedule of Foshan Metro Line 2, which is the first and last bus time in Spring Festival travel rush.

_ October 16-21: Nanzhuang of Line 2 runs 31 minutes ahead of schedule to Guangzhou South Railway Station

_ October 19-21: Line 2 is extended by 1 hour

_ October 21: Line 2 is extended by 1.5 hour

_ October 26-27: Line 2 is extended by 1 hour

75 minutes, during which the interval between subway trains is 1.5 minutes. The last 1 Guangzhou South trains leave at 11:45 the next day, and the trains stop at Linyuexi, Dengzhou, Kuiqi Road, Zhangcha and Nanzhuang stations along the way, but only the stops can't get off.

* From October 22nd to 25th, Foshan Metro Line 2 runs according to the daily operation service hours.