Current location - Recipe Complete Network - Complete vegetarian recipes - Table of Contents for Water Conservancy and Hydroelectric Engineering Documentation Training Materials
Table of Contents for Water Conservancy and Hydroelectric Engineering Documentation Training Materials

Chapter I: Documentation of Preliminary Work of Water Conservancy and Hydroelectric Engineering

Section I: Contents of Preliminary Work Documents

I. Feasibility Study and Mission Statement

II. Design Basis Materials

III. Design Documents

IV. Appraisal Reports of Various Stages

Section II: Project Proposals

I. Concept and Role of Proposal

II. Contents of Project Proposal

III. Preparation of Project Proposal

IV. Approval of Project Proposal

Section III Feasibility Study Report

I. Basis of Feasibility Study

II. Approval

Section 4: Appraisal of each stage

I. Appraisal of acceptance of division works

II. Appraisal of acceptance of unit works

III. Appraisal of acceptance of completion of contract works

Section 5: Scope of archiving and retention period of the documents

Chapter 2: Construction Management Documents for Water Resource and Hydroelectricity Project

Section 1: Engineering Management Documents

Section 2: Engineering Management Documents

Section 3: Approval of the Feasibility Report Section I Project Management Documents

I. Resettlement Planning

II. Compensation for Land Acquisition

III. Resettlement of Immigrants

IV. Water Resource Demonstration Report

V. Project Bidding and Subcontracting Management Documents

Section II Project Construction Starting Documents

I. Conditions for Starting Construction Application

II. Information to be Submitted for Application

Third, Application for Commencement of Construction

Section III: Construction Programs

I. Preparation of Construction Programs

II. Review of Construction Programs

Section IV: Scope of Documentation and Period of Retention

Chapter III: Construction Documentation of Water Resources and Hydroelectric Projects

Section I: Construction Technical Data

Section III: Technical Data of Construction

Section I: Technical Data of Construction

Section II. Construction Technical Data

I. Construction Technical Submission

II. Minutes of Drawing Review

III. Construction Organization Design

IV. Design Change Notification

V. Engineering Negotiation Order

VI. Single

Second, the construction of positioning measurement records and reporting form

Section 3, construction materials

I, engineering materials classification

II, the preparation of engineering materials

Third, materials into the field of inspection-related information

Fourth, material test reports

Section 4, construction records

I, hidden Project acceptance record

II. Pre-inspection record

III. Handover inspection record

IV. Concrete inspection record

V. Record of component lifting

VI. Welding material baking record

VII. On-site pre-stressing tensioning record

VIII. Grouting inspection record

Section V. Construction Tests Records

I. General Form for Construction Test Records

II. Geotechnical Compaction and Backfill Test Report

III. Masonry Mortar

IV. Concrete

V. Reinforcing Steel Connection Test Report

Section VI. Construction Quality Inspection

I. Basic Regulations

II. p>

III. Appearance Quality Assessment of Water Conservancy and Hydropower Projects

IV. Quality Accident Inspection and Quality Defect Filing

Section VII. Scope of Documentation Filing and Retention Period

Chapter IV Supervisory Documentation of Water Conservancy and Hydropower Projects

Section I. Overview of the Work of Supervisory Units

I. Supervisory Unit Work Procedures

II, Supervision data preparation requirements

Third, the duties of the supervisory body

Section 2, project progress control data

I. Project progress control supervision procedures

Two, project commencement permits

Three, project progress planning control

Section 3, project quality control data

One, project quality Control Procedures

II. Project Subcontracting Application Form

III. Construction Quality Joint Inspection Pass (Opening) Certificate

IV. Project Quality Defects Handling

V. Project Acceptance Declaration Form

VI. Supervision Engineer's Notice and Response Sheet

VII. Supervision duty and inspection records

Nine, engineering accident reports

Section IV: Engineering contract cost control information

I. Engineering contract cost control procedures

II. Engineering measurement

III. Contract payment declarations and review

IV. p>

I. Engineering Changes

II. Contract Claims

III. Owner's Default

IV. Contractor's Default

V. Subcontracting

VI. Construction Insurance

Section VI: Engineering Information Management Data

I. Management of Engineering Information

II. Supervision Documentation

III. p>

Third, the transmission and acceptance of project documents

Fourth, the management of supervision file information

Section VII Supervision Coordination

One, the main work of supervision coordination

Two, the coordination meeting

Three, the appointment of contractors' project manager

Fourth, the meeting records and documents

Section VIII Acceptance of Contract Works

I. Basis for Acceptance of Contract Works and Stages of Acceptance

II. Stage Acceptance

III. Unit Works Acceptance

IV. Acceptance of Completion of Contract Works

V. Contractual Responsibilities

Section IX: Others

I. Handing Over of Projects

II. Defects Liability Period

II.

Third, incentives

Fourth, appraisal

Section X. Scope of filing and storage period of documents

Chapter V. Documentation of process equipment and materials of water conservancy and hydropower projects

Section I. Documentation of equipment and materials

One: Preparation of machinery use plan

Two: Acquisition of machinery and equipment

Three: Technical tests

Section 2: Construction Material Management Documents

I. Material Acceptance and Test Documents

II. Material Certification Documents

Section 3: Scope of Documentation and Retention Period

Chapter 6: Finance and Equipment Management Documents

Section 1: Financial Plans, Investments, Execution and Statistical Documents

I. Budgeting of funds

II. Approval of fund usage

III. Material cost management

Section II: List of major equipment, consumable materials and records of usage

Section III: Scope of archiving and retention period of documents

Chapter VII: Acceptance and transfer of completed works of water conservancy and hydropower projects

Section I: Acceptance and acceptance of completed works

Section II: Acceptance and transfer of completed works

Section III: Acceptance and transfer of completed works

Section IV. /p>

I. General Provisions on Project Completion Acceptance

II. Self-inspection of Completion Acceptance

III. Technical Pre-acceptance of Completion

IV. Completion Acceptance

Section 2: Handover and Transfer of Works

I. Handover of Works

II. Handing over of Works

Section 3: Issuance of Completion Certificates

Section 3: Issue of Completion Certificates

I. I. Acceptance of the remaining issues and the treatment of the final work

II. Issuance of the certificate of completion of the project

Chapter VIII Geotechnical Construction Engineering Quality Rating Information

Section I Overview

I. Construction Quality Qualified and Excellent Standards

II. Construction Quality Rating

Section II Excavation Works

I. Rocky Slope Excavation Unit project

II. Rock foundation excavation unit project

III. Rock subsurface excavation unit project

IV. Soft foundation and bank slope excavation unit project

V. Dredging unit project

Section III Foundation and foundation project

I. Rock foundation grouting unit project

II. Backfill grouting unit project

Three, foundation drainage unit project

Four, anchor spraying support unit project

Five, pre-stressing anchorage unit project

Six, vibration punching method of foundation treatment unit project

Seven, concrete seepage barrier wall unit project

Hundred, drilled piles unit project

Nine, high-pressure jet grouting unit project

The fourth section of the mixing of rock foundation grouting unit project

Section III. p>

Section IV Concrete Engineering

I. Concrete Construction Procedures

II. Appearance Quality of Concrete

III. Concrete Unit Project

IV. Unit Project for Installation of Prefabricated Reinforced Concrete Components

V. Unit Project for Grouting of Joints of Dam

Chapter IX: Information on the Quality Grade of Electrical and Mechanical Installation Projects

Section IX. p>

Section I Metal Structure and Header Installation Project

I. Pressure Steel Pipe Buried Pipe Installation Unit Project

II. Pressure Steel Pipe Open Pipe Installation Unit Project

III. Gate Installation Unit Project

IV. Movable Retainer Installation Unit Project

V. Header Installation Unit Project

Section II Hydraulic Mechanical auxiliary equipment installation project

I. Project division

II. auxiliary equipment installation project

III. system piping installation project

Third section of the electrical equipment installation project

I. main transformer installation unit project

II. oil circuit breaker installation unit project

III. isolation switch installation unit project

four, oil-immersed transformer installation unit project

five, lightning arrester installation unit project

six, oil-immersed factory transformer installation unit project

seven, hard busbar device installation unit project

eight, soft busbar device installation unit project

nine, electrical grounding device installation unit project

X. Protection network installation unit project

XI. Control and protection device installation unit project

XII. Electrical lighting device installation unit project

Chapter X. Water conservancy and hydropower project data grouping and archiving

Section 1: file management

I. Files and archives work

II. p>

Three, the project legal person to submit information

Section 2 Filing and Transfer

I, documents and materials

Two, as-built drawings

Three, construction sound and video archives

Division 4, electronic documents and electronic archive management

Third section of the establishment of the project archives

One, engineering archive cover

Two, the general list of project information

Three, the project file volume catalog and filing

Four, file handover

Section IV acceptance of the project file

One, the file acceptance requirements

Two, the file of the special acceptance of the work of the steps, methods and contents of the file

Three, the file of the special acceptance of the opinion

References

Reference