Chapter I: Documentation of Preliminary Work of Water Conservancy and Hydroelectric Engineering
Section I: Contents of Preliminary Work Documents
I. Feasibility Study and Mission Statement
II. Design Basis Materials
III. Design Documents
IV. Appraisal Reports of Various Stages
Section II: Project Proposals
I. Concept and Role of Proposal
II. Contents of Project Proposal
III. Preparation of Project Proposal
IV. Approval of Project Proposal
Section III Feasibility Study Report
I. Basis of Feasibility Study
II. Approval
Section 4: Appraisal of each stage
I. Appraisal of acceptance of division works
II. Appraisal of acceptance of unit works
III. Appraisal of acceptance of completion of contract works
Section 5: Scope of archiving and retention period of the documents
Chapter 2: Construction Management Documents for Water Resource and Hydroelectricity Project
Section 1: Engineering Management Documents
Section 2: Engineering Management Documents
Section 3: Approval of the Feasibility Report Section I Project Management Documents
I. Resettlement Planning
II. Compensation for Land Acquisition
III. Resettlement of Immigrants
IV. Water Resource Demonstration Report
V. Project Bidding and Subcontracting Management Documents
Section II Project Construction Starting Documents
I. Conditions for Starting Construction Application
II. Information to be Submitted for Application
Third, Application for Commencement of Construction
Section III: Construction Programs
I. Preparation of Construction Programs
II. Review of Construction Programs
Section IV: Scope of Documentation and Period of Retention
Chapter III: Construction Documentation of Water Resources and Hydroelectric Projects
Section I: Construction Technical Data
Section III: Technical Data of Construction
Section I: Technical Data of Construction
Section II. Construction Technical Data
I. Construction Technical Submission
II. Minutes of Drawing Review
III. Construction Organization Design
IV. Design Change Notification
V. Engineering Negotiation Order
VI. Single
Second, the construction of positioning measurement records and reporting form
Section 3, construction materials
I, engineering materials classification
II, the preparation of engineering materials
Third, materials into the field of inspection-related information
Fourth, material test reports
Section 4, construction records
I, hidden Project acceptance record
II. Pre-inspection record
III. Handover inspection record
IV. Concrete inspection record
V. Record of component lifting
VI. Welding material baking record
VII. On-site pre-stressing tensioning record
VIII. Grouting inspection record
Section V. Construction Tests Records
I. General Form for Construction Test Records
II. Geotechnical Compaction and Backfill Test Report
III. Masonry Mortar
IV. Concrete
V. Reinforcing Steel Connection Test Report
Section VI. Construction Quality Inspection
I. Basic Regulations
II. p>
III. Appearance Quality Assessment of Water Conservancy and Hydropower Projects
IV. Quality Accident Inspection and Quality Defect Filing
Section VII. Scope of Documentation Filing and Retention Period
Chapter IV Supervisory Documentation of Water Conservancy and Hydropower Projects
Section I. Overview of the Work of Supervisory Units
I. Supervisory Unit Work Procedures
II, Supervision data preparation requirements
Third, the duties of the supervisory body
Section 2, project progress control data
I. Project progress control supervision procedures
Two, project commencement permits
Three, project progress planning control
Section 3, project quality control data
One, project quality Control Procedures
II. Project Subcontracting Application Form
III. Construction Quality Joint Inspection Pass (Opening) Certificate
IV. Project Quality Defects Handling
V. Project Acceptance Declaration Form
VI. Supervision Engineer's Notice and Response Sheet
VII. Supervision duty and inspection records
Nine, engineering accident reports
Section IV: Engineering contract cost control information
I. Engineering contract cost control procedures
II. Engineering measurement
III. Contract payment declarations and review
IV. p>
I. Engineering Changes
II. Contract Claims
III. Owner's Default
IV. Contractor's Default
V. Subcontracting
VI. Construction Insurance
Section VI: Engineering Information Management Data
I. Management of Engineering Information
II. Supervision Documentation
III. p>
Third, the transmission and acceptance of project documents
Fourth, the management of supervision file information
Section VII Supervision Coordination
One, the main work of supervision coordination
Two, the coordination meeting
Three, the appointment of contractors' project manager
Fourth, the meeting records and documents
Section VIII Acceptance of Contract Works
I. Basis for Acceptance of Contract Works and Stages of Acceptance
II. Stage Acceptance
III. Unit Works Acceptance
IV. Acceptance of Completion of Contract Works
V. Contractual Responsibilities
Section IX: Others
I. Handing Over of Projects
II. Defects Liability Period
II.
Third, incentives
Fourth, appraisal
Section X. Scope of filing and storage period of documents
Chapter V. Documentation of process equipment and materials of water conservancy and hydropower projects
Section I. Documentation of equipment and materials
One: Preparation of machinery use plan
Two: Acquisition of machinery and equipment
Three: Technical tests
Section 2: Construction Material Management Documents
I. Material Acceptance and Test Documents
II. Material Certification Documents
Section 3: Scope of Documentation and Retention Period
Chapter 6: Finance and Equipment Management Documents
Section 1: Financial Plans, Investments, Execution and Statistical Documents
I. Budgeting of funds
II. Approval of fund usage
III. Material cost management
Section II: List of major equipment, consumable materials and records of usage
Section III: Scope of archiving and retention period of documents
Chapter VII: Acceptance and transfer of completed works of water conservancy and hydropower projects
Section I: Acceptance and acceptance of completed works
Section II: Acceptance and transfer of completed works
Section III: Acceptance and transfer of completed works
Section IV. /p>
I. General Provisions on Project Completion Acceptance
II. Self-inspection of Completion Acceptance
III. Technical Pre-acceptance of Completion
IV. Completion Acceptance
Section 2: Handover and Transfer of Works
I. Handover of Works
II. Handing over of Works
Section 3: Issuance of Completion Certificates
Section 3: Issue of Completion Certificates
I. I. Acceptance of the remaining issues and the treatment of the final work
II. Issuance of the certificate of completion of the project
Chapter VIII Geotechnical Construction Engineering Quality Rating Information
Section I Overview
I. Construction Quality Qualified and Excellent Standards
II. Construction Quality Rating
Section II Excavation Works
I. Rocky Slope Excavation Unit project
II. Rock foundation excavation unit project
III. Rock subsurface excavation unit project
IV. Soft foundation and bank slope excavation unit project
V. Dredging unit project
Section III Foundation and foundation project
I. Rock foundation grouting unit project
II. Backfill grouting unit project
Three, foundation drainage unit project
Four, anchor spraying support unit project
Five, pre-stressing anchorage unit project
Six, vibration punching method of foundation treatment unit project
Seven, concrete seepage barrier wall unit project
Hundred, drilled piles unit project
Nine, high-pressure jet grouting unit project
The fourth section of the mixing of rock foundation grouting unit project
Section III. p>
Section IV Concrete Engineering
I. Concrete Construction Procedures
II. Appearance Quality of Concrete
III. Concrete Unit Project
IV. Unit Project for Installation of Prefabricated Reinforced Concrete Components
V. Unit Project for Grouting of Joints of Dam
Chapter IX: Information on the Quality Grade of Electrical and Mechanical Installation Projects
Section IX. p>
Section I Metal Structure and Header Installation Project
I. Pressure Steel Pipe Buried Pipe Installation Unit Project
II. Pressure Steel Pipe Open Pipe Installation Unit Project
III. Gate Installation Unit Project
IV. Movable Retainer Installation Unit Project
V. Header Installation Unit Project
Section II Hydraulic Mechanical auxiliary equipment installation project
I. Project division
II. auxiliary equipment installation project
III. system piping installation project
Third section of the electrical equipment installation project
I. main transformer installation unit project
II. oil circuit breaker installation unit project
III. isolation switch installation unit project
four, oil-immersed transformer installation unit project
five, lightning arrester installation unit project
six, oil-immersed factory transformer installation unit project
seven, hard busbar device installation unit project
eight, soft busbar device installation unit project
nine, electrical grounding device installation unit project
X. Protection network installation unit project
XI. Control and protection device installation unit project
XII. Electrical lighting device installation unit project
Chapter X. Water conservancy and hydropower project data grouping and archiving
Section 1: file management
I. Files and archives work
II. p>
Three, the project legal person to submit information
Section 2 Filing and Transfer
I, documents and materials
Two, as-built drawings
Three, construction sound and video archives
Division 4, electronic documents and electronic archive management
Third section of the establishment of the project archives
One, engineering archive cover
Two, the general list of project information
Three, the project file volume catalog and filing
Four, file handover
Section IV acceptance of the project file
One, the file acceptance requirements
Two, the file of the special acceptance of the work of the steps, methods and contents of the file
Three, the file of the special acceptance of the opinion
References
Reference