The company has just been established. Do I have to go through fire control procedures?
you need to submit the certification documents to the public security fire control institutions, and submit the certification and qualified documents according to the national and municipal fire control laws, regulations, norms and standards. To register a company, you should first think about what to operate and how to operate it well before registering. You have to go to the fire brigade to go through the formalities of fire control. Otherwise, they won't let you run the
Jinan fire control filing process?
please. The fire protection filing process in Jinan is relatively standardized and clear, and the specific filing process is as follows:
1. Preparation materials
When the construction unit applies for fire protection acceptance filing, it needs to submit the following materials:
1. Fire protection acceptance filing form
2. Project completion acceptance report
3. Completion drawings of construction projects involving fire protection
2. Online declaration
Login to the fire protection of construction projects in the province where it is located.
Third, window handling
After the system is qualified, bring the uploaded paper materials and offline materials to the fire window of the local government service center for handling. Offline materials include: product certificate and inspection report, third-party inspection report, construction engineering materials (inspection, debugging, concealment, acceptance, etc.), CD-ROM drawings, power of attorney and a copy of the licensee's ID card. If it is not accepted, the information provided is generally incomplete and it is necessary to start online declaration again.
IV. Filing lottery
Winning: The winning project will be submitted to the Quality Safety Station for inspection with a filing certificate, and the probability of winning is generally not less than 51%. Not selected: the items that are not selected shall be issued with the filing certificate.
v. fire inspection
after the data of the selected project is audited and inspected on site, the fire inspection opinions will be issued within 15 days, and the inspection opinions will be issued within 7 working days after reviewing the project. After the notice is issued, it will be approved and then issued by the fire window of the government service center.
if it is qualified, a qualified notice will be issued, and the fire protection project data will be filed; If it is unqualified, a notice of unqualified will be issued, and the construction unit will apply for re-examination after the rectification is completed. At this time, it is necessary to re-apply online. Review the project does not participate in the lottery for the record, and the window will be directly transferred to the Quality Safety Station for inspection after acceptance.
what's the difference between fire-fighting mandatory inspection items and filing items?
1. Different contents: large-scale crowded places and other special projects must be audited for fire control, and other projects can be filed for fire control.
2. The forms used in the declaration are different: the Declaration Form for Fire Protection Design Review of Construction Projects and the Declaration Form for Fire Protection Acceptance of Construction Projects are used for fire protection audit, and the Declaration Form for Fire Protection Design Filing of Construction Projects and the Declaration Form for Fire Protection Filing of Completion Acceptance of Construction Projects are used for fire protection filing.
3. The illegal cost is different: those who violate the regulations of fire control audit will be fined from 31,111 yuan to 311,111 yuan, and those who violate the regulations of fire control audit will be fined from 5,111 yuan.
what does it mean to put the factory fire record on record?
It means that the factory should have fire-fighting equipment.
Where can I put the fire-fighting record in p>2122?
going to the fire department of the public security organ for filing
The problem of fire filing should be managed by the fire department of the public security organ. The method of filing is actually quite simple. First of all, it is necessary to have all the corresponding information, and all the drawings must be complete, which I believe everyone can easily satisfy. The next step is to apply all the information from the construction unit to the fire department of the public security organ, which is generally an application for acceptance. It's probably about 7 days in the middle. After 7 days of acceptance, it will be entered into the filing and acceptance system of this institution.