Site selection requirements
The State Environmental Protection Administration and the National Development and Reform Commission jointly issued the Notice on the Management of Environmental Impact Assessment of Power Generation Projects [UNCED [2006] No.82]. Clearly specify the specific requirements for the site selection of domestic waste incineration power generation projects, and stipulate that no new domestic waste incineration power generation projects shall be built in the following areas except areas where pollution projects are prohibited by national and local laws, standards and policies:
1, built-up areas and urban planning areas of large and medium-sized cities;
2. Upwind direction of the dominant wind direction in towns or large concentrated residential areas;
3. Areas that may lead to environmental protection objectives in sensitive areas not meeting the requirements of corresponding standards.
Extended data
Construction conditions
1, a relatively perfect garbage collection and transfer system.
Infrastructure construction is the premise to ensure the smooth development of garbage sorting and an important condition to restrict the popularization of garbage power generation technology in China.
2. The calorific value of municipal waste should be higher.
As far as the whole country is concerned, the conditions for burning garbage to generate electricity are not enough, and auxiliary fuels need to be added.
3. Have strong economic strength.
The construction of waste incineration power generation has large investment, high operating cost and heavy burden on government departments.
4. Advanced incineration technology.
An important factor restricting the development of waste incineration technology is pollutant discharge. If it is not strictly controlled and treated, it will cause serious pollution to the environment and damage to animals and ecology. ?