Question 2: How to design the hydropower map for house decoration? According to the floor plan of the house, draw the floor plan of furniture, sanitary ware and kitchen utensils, set the position and height of switch sockets according to your own needs, and determine the size and wire diameter of several circuits according to the power of electrical appliances in each room. These are also the basis of distribution box design. According to the configuration of kitchen and bathroom, determine the position and height of each water outlet, and appropriately increase drainage pipes. Generally, toilets and floor drains will not change positions, only the sewage pipes will be changed. As for what kind of furniture, kitchen utensils and household appliances to use, you should first think about it, and you'd better measure the sizes of various appliances first. With the above settings, you can draw the circuit diagram, and then find a knowledgeable person to help you see if the drawing is suitable, or discuss with the plumber and finalize the drawing.
Question 3: How to decorate the house according to the order of what to do first, what to do later, and the water and electricity need drawings? Pre-design:
Mainly according to their own living habits, a detailed measurement of their own rooms, we should not be lazy, it is best to personally measure it again, the measurement content mainly includes: clear the area involved in the decoration process. Especially tile area, wall paint area, wallpaper area and floor area; Determine the main wall size. Especially it is necessary to design the wall size of furniture in the future. Or go directly to the designer of the decoration company to measure you. There is fierce competition among decoration companies now. Many companies provide free home survey services for designers, and then they will draw a graphic design according to your indoor layout.
2. The main demolition and transformation:
In the construction stage, the demolition and reconstruction of the main infilled wall is the first project, which mainly includes wall demolition, wall building, wall peeling, heating removal and replacement of plastic-steel windows. To put it bluntly, the main body demolition is to put up the framework of the construction site first.
3 hydropower transformation:
Before the water circuit reform, the main structure should be basically completed. Between hydropower transformation and main demolition, the first test of the cabinet should also be carried out. The so-called initial measurement of cabinets has no actual content, because the walls and floors have not been treated, and it is impossible for cabinet designers to give specific design dimensions, but only put forward some relevant suggestions on the positions of water inlets and lampblack machine sockets reserved by developers. Mainly includes:
(1) See whether the position of the lampblack machine socket affects the installation of lampblack machine in the future;
(2) See whether the location of the water meter is appropriate;
(3) See if the location of the water inlet is convenient for installing the sink in the future.
(4) For the first measurement of cabinets, experienced friends can do it themselves. After the waterway reconstruction is completed, it is best to waterproof the bathroom. The kitchen generally does not need to be waterproof, so it is recommended to be waterproof. If you have difficulties, you can go to Liang Shang 'e's house to do all-round service.
4 carpentry:
Woodworking, bricklayer and oiler are the "three brothers" in the construction process, and the basic order of appearance is: woodworking → bricklayer → oiler. The basic entry principle is that whoever is dirty will go first. In fact, carpentry, such as vertical pipe, decorative ceiling and plaster line, can also be considered as the fine link of main demolition and reconstruction in a sense, which does not conflict with the water circuit reconstruction itself, and sometimes needs some cooperation.
5 tiling:
During the operation of "bricklayer's second child", the installation of the following three links is also involved:
(1) lintel and marble windowsill installation. The installation of the threshold can be completed together with the floor tile laying, or after the floor tile laying. Generally, after the window cover is completed, the marble installation union prepares glass glue and seals the marble and window cover with glass glue.
(2) Floor drain installation. Floor drain is the first hardware in home decoration, because it should be installed with floor tiles. So when friends start shopping for building materials, they should buy a floor drain as soon as possible.
(3) Installation of range hood. The range hood is the first appearance of household appliances. After the kitchen walls and tiles are paved, you can consider installing a range hood.
When the "second bricklayer" left the scene, it was time to measure the cupboard for the second time. Accurately speaking, after the kitchen wall tiles are pasted and the range hood is installed, it is time to measure the cabinet for the second time.
6 brush the wall paint:
The "Third Oil Worker" enters the site, mainly completing the basic treatment of the wall surface, painting the top coat and brushing the furniture made by the "carpenter". Students who are ready to paste wallpaper only need to let the "third oil worker" do basic treatment on the wall surface where wallpaper is planned. As for whether I left my coat for the last time, I personally don't think it is necessary to take this question too seriously. From my experience in decoration, it is of little significance to leave the top coat, because the operation behind is not dirtier than painting.
7 kitchen and bathroom ceiling:
As an installation link, the cabinet ceiling is still continuing the "packaging" of the home. At the same time as the ceiling of the kitchen and bathroom, the moisture-proof ceiling lamp and exhaust fan (Yuba) of the kitchen and bathroom should have been bought. It is suggested that you'd better install the kitchen ceiling lamp and the exhaust fan (Yuba) at the same time, or leave a line and an opening.
8 Kitchen Cabinet Installation
After the ceiling is completed, you can make an appointment to install the cabinet at home. If it goes well, it can be finished in one day. At the same time, there are sinks (excluding water fittings) and gas stoves. It is best to coordinate the property to turn on the gas before the cabinet is installed, because the gas stove needs to be tested after installation.
9 wood door installation
(1) The second day after the cabinet was installed, the wooden door was measured more than a month ago, and now it can probably be installed. If it goes well, it will be a day. At the same time, hinges, door locks and floor drains should be installed. Related hardware should be prepared in advance.
(2) If wooden door manufacturers are required to install window covers and passes, wooden doors ... >>
Question 4: Do you need to change water and electricity for new house decoration? What are the skills of house decoration? Hydropower projects at home are closely related to children's lives and should not be underestimated. Therefore, the quality of hydropower projects must be well controlled during house acceptance. Therefore, in the hydropower transformation project, the purpose should be clear, and it is best to keep the original pipeline intact and make changes according to the designer's design, so as to be aware of it. So what are the skills for decorating a house with water and electricity?
First, there must be some planning, and those places need to be transformed. Generally speaking, bedrooms, bathrooms, living room balconies and so on.
Second, the installation of the living room, the installation of the living room lights generally requires the installation of dual controls. In terms of turning on the lights, considering the TV wall, restaurant sockets, etc., the living room can design more sockets.
Third, for the design of the bathroom, we need to consider the exhaust fan, lighting, yuba and so on. Another important thing is the electric water heater. When redesigning, waterproof and safety should be considered first.
Fourth, the hydropower design of the kitchen needs to be reformed in many places. There are many appliances in the kitchen, so you can make more power boards to give small household appliances enough space. If the washing machine is put into the kitchen, you need to consider changing the position of the waterway.
Fifth, now is the transformation. The transformation of the bedroom circuit can save some money. The lights inside don't need double control. If you are some enthusiasts, you can transform more.
Sixth, in the process of decoration, if you don't have any ideas, you can look at your neighbors' designs, learn better places according to their designs, and get rid of their dross.
The above are some skills of hydropower transformation, which can be used for reference. Be sure to do it carefully after installation, and don't check it casually. After all, this is a major event related to the safety of your life. Everyone knows the importance of hydropower transformation, so once no problems are found in the acceptance process, it will be a complicated maintenance process after moving in, so it is very important to do a good job in decoration and hydropower transformation.
Question 5: New house decoration, seeking water and electricity wiring diagram? The water and electricity wiring of new house decoration should be considered comprehensively according to the actual room type.
note:
1, pre-design the placement of furniture, TV audio, electrical appliances, computers, telephones and other equipment. Make an appropriate reservation.
2. Please arrange the power supply equipment in strict accordance with the relevant electrical specifications. All information points are equipped with power outlets. Pay attention to the socket type of electrical appliances. For example, kitchen appliances are all three-core sockets, TV stereos are all two-core sockets, cordless phones and desk lamps are all two-core sockets, some small household appliances should leave transformers, and computer equipment are all three-core sockets. A three-core socket can be changed into a two-core socket through the power adapter, but the two-core socket is absolutely static, and it can be changed into a three-core socket through the power adapter, otherwise there is a danger of burning electrical appliances or getting an electric shock. The grounding wire layout of all three-core sockets can not be ignored.
3, water meter, electricity meter, gas meter, alarm, dialogue doorbell and other equipment lines in strict accordance with the instructions. (usually embedded in place).
4. Try to wear the tube as a line. It is forbidden to use pipes for different types of lines. Information lines, power lines and cable TV signal lines should be kept away from parallel lines to avoid signal interference.
5, all information points (telephone, computer) separate cloth five kinds of twisted pair to the junction (information box), don't leave a connector in the middle.
Example:
Question 6: How to carry out the hydropower transformation of the new house? Designers must sharpen their tools if they want to do a good job. Home is for a comfortable life, and the owner of the home has the most say. As one of the basic preparations for decoration, the preparation for hydropower transformation is directly related to the comfort and safety of living in the future. After the renovation project is completed, the surface of the hydropower project is mostly invisible and intangible. Once there is a big hidden danger, the loss is relatively large, and the maintenance is often destructive. First of all, we should grasp the principle of paying equal attention to safety and comfort from the design idea, so as to be targeted and avoid losses in the later period. Design features of existing water and electricity pipelines in new houses: The high-voltage distribution system of most newly-built houses is perfect, and the lighting sockets, air conditioners and other circuits are completely separated, which can ensure the normal household electricity load; Weak current (network, telephone, TV) has entered the home, and even all rooms have laid water and electricity lines and complete weak current lines (some weak current lines of houses are only connected to the living room or bedroom, and further extension work is needed), so there is no need to make too many changes when decorating; In most cases, the indoor water supply pipes have been arranged from the kitchen to the bathroom (a few only have cold water pipes or even only a cold water interface is reserved indoors, and there is no need to re-arrange hot water pipes), and some modifications can be made according to their own needs; The drainage pipe of the new house is basically a radish and a pit. If there is no change in the position of the equipment, there is generally no need for major changes. New house 1 Matters needing attention in hydropower design. Shielded cables should be used for weak current, and the wiring layout of secondary decoration needs to be slotted again. Most of the strong and weak electricity can only be taken from the ground, and it is common for strong and weak electricity pipes to cross and parallel at close range. If the weak current uses unshielded cables, it may cause signal interference. 2. Circuit wiring design principle Grasp the principle of "the shortest distance between two ends", don't intentionally wire, and keep the relative "fire line". 3. In principle, if the high-voltage pipe provided by the developer is PVC pipe, PVC pipe should be used in the secondary hydropower transformation, and JDG pipe (tightly sheathed galvanized steel conduit) cannot be used, otherwise it will be difficult to realize the overall grounding connection, leaving future troubles. If the high-voltage electron tube provided by the original developer is JDG tube, both can be used. 4. Hydropower design needs to know whether the required waterway reconstruction design scheme matches the actual hydropower system (especially the second-hand house, which will be explained below). For example, if the newly-built residence uses electric appliances with particularly high power such as instant electric water heaters and central air conditioners, it is necessary to consider introducing new lines from the distribution box for use. 5. The design of kitchen water and electricity needs the coordination of cabinet design and safety assessment. 6. When designing hydropower, we must master the size and characteristics of furniture and electrical equipment in functional rooms such as kitchen and bathroom, so as to make an accurate positioning of hydropower transformation scheme. 7. Referring to the functional configuration of hydropower design equipment for ordinary houses, take the common configuration of three bedrooms, one living room, one bathroom and one kitchen as an example, and so on for large-sized houses. Normal kitchen equipment: rice cooker, microwave oven, range hood, some cookers that need power supply, and standby power supply under the basin; Water heaters (wall-hung boilers, cabinet treasures) supply power and return water. The kitchen has optional equipment: oven, disinfection cabinet, refrigerator power supply, washing machine power supply and drainage, soft (clean) water machine power supply and drainage, cabinet treasure power supply and drainage, dishwasher power supply and drainage, cabinet lamp power supply, background music speaker. Normal facilities in the bathroom: Yuba (pay attention to several control lines), mirror headlights, exhaust fan and hair dryer power supply; Electric water heater power supply and water supply, washing machine power supply and water supply and drainage; Bathtub, bathtub, washbasin, toilet water supply and drainage. The bathroom has optional facilities: washbasin, telephone, washbasin and background music speaker. Normal equipment in the living room: TV power supply and TV port, air conditioning power supply, network and power supply, telephone port, power supply on both sides of sofa. The living room has optional equipment: home theater, video enjoyment, projection, satellite TV, electric curtains, ceiling lighting power supply, security, lighting control and intelligent control system. Bedroom normal equipment: bedside standby power supply, telephone, TV, air conditioning. The bedroom has optional equipment: double lighting control, network and power supply, wall lamp, video enjoyment, curtain control, satellite TV and lighting control. Normal equipment in the study: network, power supply, telephone and spare socket. The study has optional equipment: background music, TV and power supply, video enjoyment and electric curtains. Supplementary note: the power supply of bedroom equipment such as dining room is relatively simple and can be changed according to the actual situation. In addition, the above equipment description is only listed for the normal use of the function room, and it is inevitable that there are redundant or omitted items. It needs specific case analysis to achieve the effect of "tailor-made". )
Question 7: How to rebuild the new house and water and electricity? 1, do a good job in the space division between functions, the layout of plane furniture and the layout of decorative ceiling. Examples: such as the placement and size of beds, wardrobes, computer desks and other equipment, the size and placement of dining tables, the audio-visual effects required by audio-visual rooms and so on.
2, personal preferences of kitchen and bathroom appliances, equipment model and size know fairly well. For example, the overall kitchen design scheme (completed by kitchen cabinet designers) is directly related to the determination of kitchen water and electricity scheme; There are many options for water heaters, such as gas, electricity (also divided into regenerative and instant heating), solar energy, wall-hung boiler hot water supply, and 24-hour residential water heater system.
With a clear scheme for the renovation of domestic water circuits, we need to pay attention to the following issues:
First, the relationship between the total electricity consumption required by the owner and the total electricity load of the house.
With the continuous improvement of people's living standards, the total capacity of household appliances is increasing. Will the current design exceed the total power load? If you exceed it, you must give up.
Second, the impact of the hydropower pipeline required by the owner on the building structure or the whole hydropower system.
Hydropower pipelines play a very important role in the use of houses. Some owners are not familiar with the building structure and the whole hydropower system in order to pursue functions, and it is easy to put forward some requirements that will affect the building structure and the whole hydropower system. If this problem occurs, we must revise our hydropower design scheme.
How to transform hydropower in the renovation of new houses in Jinan
Third, whether the effect required by the owner is consistent with the actual use effect after completion.
Because the owners generally don't know much about the decoration, it is impossible to consider the overall layout of the house when making the requirements. The requirements that look good in some places may not be reasonable on the whole. Therefore, after the scheme is designed, we must exchange views with professional hydropower designers and correct unreasonable places in time. In this way, the hydropower reconstruction construction can be carried out smoothly without rework.
Question 8: What should we pay attention to in the renovation of new houses? What is the process? After handing over the house, we began to decorate. Hydropower transformation can be said to be the most important, because hydropower transformation plays a very important role in our lives, and these hydropower transformations are usually called hidden projects, which are hidden. If there are problems after renovation, it will be a very bad thing. But what are the processes and details of hydropower transformation, and what should we pay attention to? Let's study together.
1. Hydropower transformation process: 1. According to the bedroom design and the specific needs of customers, design the direction of water and electricity. 2, workers according to the direction of the wall or the ground slot. 3. Bury pipes (including wiring and connecting pipes) and cassettes. 4, detection circuit, waterway pressure test. 2. Details of hydropower transformation: 1. Waterway design should first think about all water-related equipment, such as water purifier, water heater, kitchen treasure, toilet, washbasin, their positions, installation methods and whether hot water is needed; It is necessary to make good use of gas or electric water heaters in advance to avoid temporary replacement of water heaters, which will lead to repeated reconstruction of waterways; In addition to the washbasin, toilet, washing machine and other outlets, it is best to bring one out to facilitate the later water mop; 2. It is the first time for a cabinet manufacturer to come to the door. It is best to bring the construction master who changed the water together and communicate face to face. Before construction, the upstairs should be waterproof to ensure that there is no water seepage downstairs before construction. 3. After the waterway reconstruction is completed, a suppression experiment needs to be done. It is best to have a property on the scene to suppress the test, which can play a supervisory role. Because some decoration companies will cheat the owners in this link. 4. After the kitchen and bathroom floor tiles are laid, check whether the floor drain is unobstructed (the drainage speed after removing the floor drain cover shall prevail, because most deep-water sealed floor drains have the problem of slow drainage); If you want to close the redundant floor drain, you must block the gap between the drain pipe and the floor drain to prevent water from overflowing; The last three points: 1. The above operations mainly involve slotting, which is generally the work of masons. But if there is a cutting machine, the plumber can do it very conveniently. Slot alignment involves bricklayers. Therefore, from the operational process, it is the cross operation of three types of work. If you are decorating yourself rather than decorating a company, you should pay attention to coordinating their cross-work and mutual cooperation. 2. Wires should be conventional products, and conduits and cassettes must be flame retardant. Because it is a concealed project, we can't be careless. 3. On the waterway, water pipes should also be regular and reliable products. Either way, it must be reliable. The pressure test shall be carried out in strict accordance with the standards. 4. For weak video cable, it must be a thick core double shielded cable. Telephone lines and network cables should not be sloppy. 5. Try to use large caliber sewage pipes to avoid right angles. The distance from the gas pipe to the cooker and water heater should be as short as possible, preferably no more than 2 meters.
The above content is about the knowledge of water and electricity decoration of new houses, which can be understood more deeply.
Because in the renovation of new houses, hydropower transformation is a big project, and it is also an error-prone project. If you don't pay attention when decorating, it will easily bring you a lot of trouble in your later life. So be sure to pay special attention.
Question 9: How much is the renovation water and electricity? What should be paid attention to in hydropower design of new houses? 1. In waterway design, we must first think about all water-related equipment, such as water purifier, water heater, kitchen treasure, toilet, wash basin, their location, installation method and whether hot water is needed;
2, want to use gas or electric water heaters in advance, to avoid temporary replacement of water heaters, resulting in repeated transformation of waterways;
3. It is best to have the owner present for the suppression test, which can play a supervisory role; Because some decoration teams will cheat the owners in this link. The method is: when squeezing, open the backwater valve of the squeezing pump to form a loop. Although the press pump seems to be working, the pressure in the pipeline is not great, especially the electric press pump, which students should pay more attention to. If you don't understand, ask a professional to take a look at it for you.
4. If you want to close the redundant floor drain, you must hold the gap between the drain pipe and the floor drain to prevent water from overflowing;
5. Except the water outlet of washbasin, toilet, washing machine, etc. It is best to pick them up one by one, so that it is convenient to mop the floor after receiving water; It depends on the owner's preference.
6. There should be a suppression test after the waterway transformation, but now many decoration teams have not suppressed the test. They will lie to you in many ways, saying that there is no need to suppress, saying that the water pipe is under pressure and so on.
7. After the location of the washing machine is determined, the drainage pipe of the washing machine can be considered in the wall, which is beautiful and convenient;
8. After the kitchen and bathroom floor tiles are laid, check whether the floor drain is unobstructed (the drainage speed after removing the floor drain cover shall prevail, because most deep-water sealed floor drains have the problem of slow drainage);
9. Another point is particularly important. It is best not to use deep water seal for the floor drain of washing machine. The washing machine drains water quickly and has a large displacement. The launching speed of deep-water sealed floor drain can not be reached at all, which will directly lead to water overflow.
10, when using the deep-water sealed floor drain, it should be cleaned frequently according to the use situation, otherwise the rubber pad under the floor drain will not be sealed after hanging dirty things;
The design of 1. circuit must be determined after considering the possibility, feasibility and availability in detail. No one wants to pull wires everywhere on the walls and floors of their new home. Circuit design should also pay attention to its flexibility, sometimes not too comprehensive. Summed up a simple principle: in the future, when the electrical plugs are concentrated, it is often better to connect a patch panel, and the effect is often better than setting a full wall socket;
2, the location of the socket is very important, often the socket is located directly behind the bedside table, resulting in the cabinet can not be against the wall. It is generally not wrong to make the socket as well as possible, but if the socket is left in an inappropriate position, it may conflict with the furniture placement or electrical installation in the later period. Please remember;
3, the bedroom ceiling light can consider dual control (bedside and porch);
4. Some kitchen sockets are convenient to switch, which avoids the inconvenience of unplugging the rice cooker frequently in the future.
5. According to the needs of life, the ceiling lamp in the living room can be equipped with a separate control switch (in the porch hall, facing away from the master bedroom door);
6. How to charge the cassette must be agreed in advance, which is the most hidden and dark profit point of water circuit transformation. A cassette needs only one or two dollars in the market, while the decoration team often needs more than ten dollars. Generally, fifty or sixty cassettes are needed for home decoration. Therefore, it is normal for students to throw hundreds of dollars for nothing. Strive to pull it into today's world for only one purpose. Remember five words: chop hard;
7. Observe whether there are modules in the telephone socket and network cable socket;
8. For the space with mirrors and coat hooks, consider the lighting near the mirrors;
9. When the circuit is reformed, the surrounding audio lines should be buried.
10. Telephone lines should be preset in the living room, master bedroom and bathroom according to personal living habits and convenience;
Question 10: How to do the hydropower transformation scheme for new house decoration Hydropower transformation is a drama of decoration, which can be simply divided into the following steps.
First of all, we should do a good job in the space division between functions, plane furniture layout and decorative ceiling layout. For example, the placement and size of beds, wardrobes, computer desks and other equipment, the size and placement of dining tables, the audio-visual effects required by audio-visual rooms and so on. These are all related to the layout of hydropower lines.
Secondly, it is necessary to clarify the current and future needs of the family, such as whether there are kitchen treasures, water purifiers, kitchen waste processors, embedded ovens, disinfection cabinets and so on. To determine how many water pipes and wires are needed anywhere.
Finally, according to the demand, make a detailed waterway design.