Current location - Recipe Complete Network - Catering franchise - How to write an application for instructions from the bidding operation and maintenance unit?
How to write an application for instructions from the bidding operation and maintenance unit?

Bidding application

The bidding application is similar to the general application in structure, which includes three elements: title, text and ending.

(a) the writing method of the title

The title of the tender application is composed of two elements: the cause and the language, and there is no need to add other elements. For example, the application for bidding for the reconstruction project of the family members' hospital of the army

(II) Writing method of the text

The application for bidding consists of two elements: title and main text.

1. Title, that is, the sending company. Refers to the title of the addressee, which generally refers to the full name of the unit or department in charge of bidding. Its writing specification is the same as the general application, with the first line in front of the text and the top case written.

2. main body. That is, the main body of the text, it is necessary to write clearly the project that needs bidding and the bidding conditions that have been met. Then, we should express our willingness to apply for bidding and hope to approve the request.

3. ending. The end of the tender application consists of annexes and signatures.

(1) attachment. Indicate the name and number of documents submitted with the application; If there is more than one attachment, it must be indicated by serial number in turn. The specific writing method of the annex is basically consistent with the requirements of the official document.

(2) Signature and date.

The writing requirements of the tender application form

First, it must conform to the specifications from form to content;

Second, the content should be true and accurate;

the third is to write in the tone of request.