First, the steps of kitchen waterproofing construction
1, the first liquid material into the mixing bucket, slowly add powder while mixing, mixing with an electric mixer until uniform, no lumps;
2, node processing: in the surface before painting, the need for floor drains, corners of the yin and yang, the root of the pipe and other parts of the leakage of easy to use leakage king to wipe the arc of the strengthening of the treatment (diameter does not affect the later), the tiling shall prevail, the kitchen waterproofing construction of the steps. (diameter to not affect the late tiling shall prevail), and then use waterproofing coatings for node painting;
3, large surface painting: waterproofing film should be painted two to three times, each coating film dry before the next procedure, the time interval of 3 to 6 hours (to touch with the hand does not stick to the hand shall prevail), low temperatures or humid environmental conditions should be appropriate to extend the drying time. Waterproof layer coating thickness should be 1.5mm horizontal surface, vertical surface should be 1.2mm, construction is appropriate to use the "ten" cross-brush way; coating film is completely dry before the water closure test, water closure time is 48 hours.
Second, the kitchen waterproof construction precautions
1, the grass-roots ash, sand clean up; waterproof construction, grass-roots shall not contain water; prohibit the addition of water;
2, in general, waterproofing the kitchen to the ground above the 30 centimeters on the line, if the kitchen is installed in a wooden cabinet, it is recommended that waterproofing to the cabinets to the cabinets to a height of 20 centimeters. In the placement of sink wall above 1.5 meters to set the waterproof layer, to deal with the corner area.
3, the construction temperature should be between 5 ℃ ~ 35 ℃, windy or rainy weather, outdoor construction is prohibited;
4, the preparation of the paint should be used within one hour, painting process is strictly prohibited to add water again;
5, the dosage process is strictly prohibited to add water or to add any other material;
6, after the opening of the unused liquid or powder, it should be Sealed storage;
7, the construction process, pay attention to protect the waterproof coating from damage;
8, waterproofing layer on the tiling is recommended to use ceramic tile adhesive;
9, this product contains cement and other alkaline substances, may cause skin allergies, the use of protective measures should be done;
10, such as touching the eyes, should be immediately rinsed with water, if there is any If there is any discomfort, you should consult a doctor immediately.
In the kitchen construction process should pay strict attention to the above matters, waterproofing project is very important, I hope the above will help you.