Single contract and material construction contract 1:
Contractor:
Through friendly negotiation and mutual understanding between Party A and Party B, and on the principle of equality, mutual benefit and voluntary assumption of all risks, Party A has contracted this project to Party B in the form of contract work and materials. The specific agreement is as follows. I hope both parties will abide by it consciously and shall not breach the contract.
I. Project name:
____________
Second, the project site selection:
____________________
Three. Contents contracted by Party B
All materials are contracted at a comprehensive unit price. The construction area is RMB/m2 (in words: m2) (the calculation rules of the construction area shall be subject to the surveying and mapping area of the Housing Authority after the comprehensive acceptance of the project).
Four. Start date:
date month year
Completion date: year month day.
Verb (abbreviation for verb) Scope of contract:
Description of engineering construction drawings and design drawings, minutes of joint review of drawings, design and design changes shall be distributed by Party A to Party B in the form of contract data. If Party B changes the drawings during the construction, it must obtain the consent of the designer and Party A.. The drawings included in Party B's contracted contents include: foundation excavation, ground beam excavation, backfilling, cement, river sand, gravel, commercial concrete, steel bars, exterior wall paint, windows, indoor kitchen and bathroom waterproofing, roof waterproofing, stair handrails, exterior wall insulation, indoor plastering, ground cushion and various auxiliary materials, and the indoor clean room is completed. (Party B does not include the contents in the drawings: fire protection, painting, anti-porcelain and interior coatings, water and electricity installation, doors, interior decoration and floor tiles, stair tread tiles, ceiling decoration, kitchen and bathroom decoration and kitchen and bathroom tiles, septic tanks, glass curtain walls, glass doors and glass awnings are not the responsibility of Party B, and all construction is the responsibility of Party A).
Content of intransitive verb Party A
1. Party A shall provide drawings and water and electricity.
2. Supervisors shall be provided by Party A;
3. Party B needs all kinds of formalities, and Party A must cooperate to provide them.
4. In case of any change, Party B shall be responsible for the labor cost and material cost.
Seven. Contents that Party B is responsible for
1. Party B shall be responsible for all taxes and fees for this project.
2. Water and electricity embedment and lightning protection embedment, and Party B shall be responsible for the embedded pipelines and lightning protection materials.
3. Party B is not responsible for water and electricity installation, but only for embedding.
4. Party B is responsible for window installation, and the materials shall be subject to the drawings.
Eight. terms of payment
1. After Party B enters the site and the ground beam is hoisted, Party A shall pay Party B 200,000 yuan for the project.
2. For the main cover, Party A pays Party B 600,000 yuan for the project.
4. After plastering is completed, Party A shall pay Party B the project cost: 600,000 yuan.
5. After comprehensive acceptance, Party A shall pay Party B the final payment of the project: 98%.
6. The remaining 2% will be used as warranty money and paid off within one year.
Nine, quality requirements
1. Carry out the construction in strict accordance with the construction drawing, implement the construction quality acceptance regulations, do a good job in construction setting-out, material planning, self-inspection and form filling, and achieve the completion acceptance.
2, change orders and other design documents and specifications, fine organization construction, strengthen the technical management of the site and personnel, to ensure that the project to achieve high-quality projects. The constructor, supervisor, project department and Party A shall carry out the acceptance of building specifications.
X. Safe and civilized construction
1. Party B shall be responsible for the safe construction of the contracted project, strictly implement the national and local policies, regulations, norms, standards and systems, and shall not give orders in violation of regulations, strictly carry out safety technical disclosure, and must let the personnel entering the site carry out safety education; Three-level education, safety activities before and after work.
2. In the process of construction, the responsibility and handling of safety accidents shall be settled by both parties through consultation, and the responsibility shall not be shirked for any reason.
Matters not covered in this agreement shall be settled by the responsible persons of Party A and Party B through friendly negotiation. If negotiation fails, a lawsuit shall be brought to the local people's court according to law.
This contract is made in duplicate, one for each party, and shall come into force after being signed, with the same legal effect.
Signature of Party A:
date month year
Signature of Party B:
date month year
Single Contract and Material Construction Contract II: Employer: (hereinafter referred to as Party A)
Contractor: (hereinafter referred to as Party B)
Note: This contract is compiled according to the Standard Construction Contract for Construction Projects in Guangdong Province promoted by the Guangdong Provincial Construction Department. As the contract version signed by the Employer and the Contractor, the terms of this contract shall be adjusted and supplemented according to the requirements of the bidding documents and the contents of the Contractor's bidding documents.
I. Overview of the Project
Project Name: X Residential Relocation Project
Project location: the former educated youth field of X-ray Town.
Project scale and content: there are 4 floors in the office building and 2 floors in the supervision office, with a height of16.5m and a total construction area of 6,849.22m2..
Structural form: frame
Project approval planning number: Gao Fa Gai Shen Han [20xx]No. 16.
Source of funds: strive for the support of superiors, and the insufficient part will be solved by local financial matching funds.
Second, the scope of project contracting
Scope of contract: general construction contract (including construction and installation works)
Third, the term of the contract.
Total calendar days of project contract duration: 235 days.
It is planned to start construction on February 30th, 20xx 12 and complete it on August 30th, 20xx 2 1 year.
Fourth, quality standards.
Engineering quality standard: it is required to meet the national acceptance standard for construction engineering quality (GB50300—20x) and above.
Verb (abbreviation of verb) contract price
Total Contract Price (in words): (in figures): 7 yuan.
Unit price of the project: □ See the contractor's tender offer (bidding project) for details;
See the confirmed bill of quantities quotation or construction drawing budget (non-tendering project) for details.
An intransitive verb constitutes a contract document.
The documents constituting the contract and their priority interpretation order are the same as those in Article 2 of the General Conditions in Part II of this contract. The provisions of paragraph 2 are consistent.
Seven, the meaning of words
The meanings of related words in this agreement are the same as those given to them in Article 1 of the General Conditions in Part II of this contract.
Eight, the contractor commitment
The Contractor promises to the Employer that he has read, understood and accepted all the terms of this contract, implemented, completed and guaranteed the contract project according to this contract, and fulfilled all the obligations stipulated in this contract.
Nine. Employer commitment
The Employer promises to the Contractor that it has read, understood and accepted all the terms of this contract, paid the project funds and other payables in the time and manner agreed in this contract, and fulfilled all the obligations agreed in this contract.
X. Entry into force of the contract
Date of conclusion of the contract: year month day.
Place of signing the contract: X Security Bureau meeting room. Both parties agree that this contract will take effect immediately after it is signed and sealed by both parties.
Party A (official seal): _ _ _ _ Party B (official seal): _ _ _ _ _
Legal representative (signature): _ _ _ _ _ Legal representative (signature): _ _ _ _ _
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Single Contract and Contracted Construction Contract 3 Party A:
Party B:
In accordance with the Contract Law of People's Republic of China (PRC), the Construction Law of People's Republic of China (PRC) and other relevant laws and regulations, in line with the principles of voluntariness, equality, fairness, honesty and credit, and in combination with the situation of this project, Party A and Party B have reached the following agreement.
I. Overview of the Project:
1, project name: private house
2. Project location: self-built Huimin house in Qingjiang Village.
3. Project construction scale: the first floor is a frame, and the second to seventh floors are residential buildings with brick-concrete structure.
Second, the way of contracting:
1. Party B does not contract materials. Party B shall be subject to the design scheme provided by Party A, which shall not be changed after signature.
2. Party B is responsible for the mechanical tools, equipment and templates (including nails, wires and other low-value consumables) required for construction.
3, indoor plastering, clean room, excluding secondary decoration.
Third, the time limit for a project:
Since the official commencement date of Party B 150 days ... If the project cannot be constructed normally due to Party A's reasons or irresistible natural factors (such as rain, power failure, water cut, etc.), the construction period will be postponed.
Fourth, the project quality:
Refer to the national civil building code and the construction quality acceptance standard of building engineering.
Verb (abbreviation for verb) Item content:
1, the main body is brick-concrete structure. Exterior wall brick of 100× 100 shall be pasted on the front, the back wall and both sides shall be plastered, indoor plastered, and the window shall be used as a sunshade.
2. Decoration of kitchen and bathroom on the second floor.
3. Indoor and outdoor water and electricity installation: Party B shall lay water and electricity, optical fiber, telephone and gas pipelines. At the place required by Party A. ..
Settlement method of intransitive verbs:
1, the project shall be settled according to the actual square (and calculated according to the building exterior wall boundary), 150 yuan/㎡.
2. Party A and Party B shall each pay one yuan for personal accident insurance.
Seven. Payment terms:
1. After Party B's machines, equipment and templates enter the site, Party A shall pay 5% of the total price of Party B; After installing the precast slab on the first floor, Party A shall pay 30% of the total price of Party B; Party A shall pay 30% of the total price to Party B after installing prefabricated panels on the second and third floors.
2. After the completion and acceptance of the remaining projects, Party A shall pay 35% of the total price of Party B. ..
Eight, engineering quality assurance:
1, roof, external wall, kitchen and bathroom are guaranteed for leakage for one year.
2, water and electricity warranty for one year (lamps and lanterns switch, water switch bad warranty).
3. After 65,438+02 months from the date of completion acceptance, if there is no quality problem, Party A shall pay the balance to Party B. ..
4. Party B shall take full responsibility and compensate for the loss of building materials or other injuries caused by construction quality accidents.
5. Without the consent of Party A, all construction personnel of Party B are not allowed to leave the construction site with any building materials ... If entrainment is found, 10% of Party B's total price will be deducted.
Nine. Party A's responsibilities:
1, do a good job of "three links and one leveling".
2. Pay Party B's salary on time.
3. Supervise the project quality and progress, and do a good job in neighborhood relations.
4. Do a good job in the collection, supply and management of various materials, and continuously supply Party B's materials.
5. Party A shall make technical disclosure to Party B on this project.
X. Party B's responsibilities:
1. Party B must carry out construction with good quality and quantity in accordance with relevant national construction standards.
2. If Party B needs the materials provided by Party A, Party B shall notify Party A to purchase them seven days in advance.
3. Party B shall do a good job in the safety management of the construction site of this project. In case of safety accident, Party B shall take full responsibility and compensate.
XI。 Safety responsibility:
Party B shall bear all the responsibilities. In case of safety accidents of Party B and third party personnel during construction, Party B shall bear all responsibilities and compensation. Party A shall not assume any responsibility or compensation.
Twelve. Liability for breach of contract:
After the contract comes into effect, both parties will earnestly implement the above-mentioned treaty. In case of breach of contract, the breaching party shall bear relevant responsibilities, pay 30% of the total contract price to the observant party, and compensate all economic losses (and deal with them according to the contract law). Economic dispute litigation shall be arbitrated by the local court.
Thirteen. Matters not covered in this contract shall be settled by both parties through consultation. Labor costs will be settled after the completion acceptance, and this contract will be automatically terminated after the warranty period.
Fourteen This contract is made in triplicate, one for each party, and one for the record management of relevant government departments.
For matters not covered in this contract, both parties may sign a supplementary agreement through consultation. The supplementary agreement has the same effect as this contract.
Party A (official seal): _ _ _ _ Party B (official seal): _ _ _ _ _
Legal representative (signature): _ _ _ _ _ Legal representative (signature): _ _ _ _ _
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
4 Party A's labor and material construction single contract
party B
Party A has built a commercial and residential building, the construction site has been leveled, the roads are smooth, the water and electricity facilities are complete, all kinds of construction approval procedures are complete, and the construction conditions are fully met. In order to complete the building as soon as possible and clarify the rights and obligations of both parties, Party A and Party B voluntarily reach the following construction agreement through consultation for * * * to abide by.
First, the project name is:
Commercial and residential.
Second, the engineering structure:
Commercial and residential building, in which 1 floor is frame structure, and above it is brick-concrete structure.
Three. Preservation and provision of drawings and documents:
Within days after the establishment of this agreement, Party A shall deliver two sets of construction drawings, and the drawings delivered to Party B shall be kept by Party B as construction materials and handover acceptance certificate. During the construction period, Party A shall notify Party B five working days before changing the design. Party A shall bear the losses caused by the failure to notify on time, and Party B shall bear the losses caused by Party B's failure to carry out the construction according to the notice after notification ... Party A shall pay the project cost for the increased project quantity, and the reduced project quantity may reduce the project cost accordingly.
Four. Scope and requirements of contract:
The scope of contract includes foundation treatment (after the foundation is cm higher than the highway, repeat the steps with a layer of ground of cm), structural construction (civil construction), cement powder wall for internal and external walls (ceramic tile for external walls), indoor cement ground, installation of telephone lines, cable TV lines, network lines, air conditioning lines, lighting lines and other walls and hidden lines in the ceiling, treatment and waterproof treatment of reserved pipes for upper and lower sewers, roofing construction and waterproof treatment, and natural gas. Requirements: Strictly follow the construction drawings.
Verb (abbreviation of verb) signing method:
contract for labour and materials
Six, the project duration:
Commencement on xx, xx, and completion on xx, xx, with an effective construction period of xx days. If Party A fails to complete the project as scheduled, and thus bears the care expenses and labor expenses paid by Party A, resulting in material losses, Party A shall bear the material expenses according to the payment. Party A changes the design to increase the engineering quantity and correspondingly increase the construction period. Natural conditions can not be constructed, and the construction period will be postponed automatically. If Party B stops work for more than days without justifiable reasons, Party A has the right to terminate the agreement, and it will not be handled without paying the project payment.
Seven. Provide construction equipment:
All construction equipment and machinery shall be provided by Party B and delivered to the construction site within days after the establishment of this agreement and the delivery of drawings. Limit the number of construction equipment and machinery to effectively ensure normal construction.
Eight. Price and payment method:
The above general contract sum is RMB. If the design is changed, the changed engineering quantity shall be calculated according to the ratio of the total price to the total engineering quantity.
Payment method: cash installment. The construction machinery and equipment shall pay xx% of the total price when they arrive at the construction site, xx% of the total price after the completion of the three-layer main structure, xx% of the total price after the completion of all main structures, xx% of the total price after the completion of wall painting, 95% of the total price after the completion of all projects, and the remaining 5% shall be paid as the warranty fee one year later.
Nine, material supply:
The materials needed for the project are provided by Party A, and Party B is obliged to ask Party A to replace the materials that are not up to quality, and the losses caused by Party B's failure to perform this duty of care shall be borne by Party B..
If the project is delayed due to material supply, Party B has the right to extend the construction period equally.
The use of materials shall be based on the principle of rationality and shall not be wasted, otherwise Party A has the right to claim compensation from Party B. ..
X. quality requirements:
In strict accordance with the construction drawings and the provisions of the relevant construction departments.
XI。 Construction safety:
Party B shall be fully responsible for the construction safety during the construction period, and all accidents during the construction period shall be borne by Party B. ..
Twelve. Handling of industrial accidents:
For the construction personnel who arrive at the construction site, Party B must insure the life and property of the actual personnel, construction personnel and the third party, and pay the insurance premium.
Party B shall bear all personal injuries and personal injuries of third parties during the construction period.
Thirteen. Quality assurance:
Party B shall guarantee the delivered project in accordance with laws and administrative regulations, and undertake the quality warranty responsibility during the warranty period. Roofing waterproofing works, toilets, rooms and external walls with waterproof requirements shall be impervious for 5 years.
Fourteen Liability for breach of contract:
Any failure or incomplete performance of the terms of this agreement constitutes a breach of contract, and the defaulting party shall bear all losses caused by the compliance.
Fifteen. Matters not covered in this agreement shall be negotiated separately.
16. This agreement is made in duplicate, one for each party and kept by both parties.
Attachment: The construction drawings and the standards, parameters and construction requirements in the construction drawings are an integral part of this agreement.
The first party
party B
Xx,xx,XX,XX
Single Contract Construction Contract 5 Employer: (hereinafter referred to as Party A) Contractor: (hereinafter referred to as Party B)
Due to the need of building a residential building in Beifeng Mingyuan, Zherong County, Party A handed over the project template to Party B for installation. In order to clarify their respective rights and obligations, the two sides adhere to the principles of mutual benefit, equality and voluntariness. Through consultation, the following contract terms are reached:
1. Contract content: the whole process of construction of all formwork in this project, including fabrication, installation, demolition, transportation and formwork support. The contractor shall provide his own machinery, wires and helmets.
2. Contracting methods: contracting, contracting materials, contracting machinery, contracting quality, contracting time and contracting civilized construction.
3. Contract unit price: the formwork project cost is 27.5 yuan/㎡ (the dimensions are marked according to the construction drawings, and the area is calculated according to the concrete contact area, and if the design is changed, it is calculated according to the changed drawings), and it is agreed that the floor column position area and beam mouth area will not be deducted (the area larger than 0.3㎡ should be deducted). This price is a one-time lump sum price, and Party B will not ask for additional price except for the increase of engineering quantity caused by design changes during construction. If Party B leaves midway because it cannot guarantee the construction period, quality and safety of Party A and violates relevant national laws and regulations, Party A has the right to refuse to pay the balance of the project contract and unilaterally terminate the agreement.
Four. Project price and payment method: within 5 days after Party B's material foundation template enters the site, Party A will pay 20,000 yuan for materials preparation in Buildings A and B, and 30,000 yuan for materials preparation in Buildings A and B. Within 5 days after the first layer template, that is, the concrete below 0.000 is poured, the project progress payment will be paid at 80% of the monthly completed project amount (the preparation fee will be deducted by Party A at 5,000 yuan per floor until it is deducted). The rest of the money shall be paid within 30 days after the final accounts of the formwork installation project are completed.
5. During the construction period, Party B shall be responsible for snacks, meals and overtime pay at night. Its employees.
6. Formwork and related materials: Processing tools, required equipment and construction personnel shall be provided by Party B. Most of the columns, beams and floors provided by Party B are new formworks, and other parts can be matched with old formworks, but dismantled formworks shall not be used.
Seven, every time Party A needs to install templates, it shall notify Party B two days in advance, in which the foundation and underground ring beam templates shall be completed within a reasonable time, the main template shall be manufactured and installed within seven days, and each floor shall be cleaned (except for those that can't be constructed in heavy rain), and sporadic templates shall be manufactured and installed on call (one day in advance), which will not affect Party A's construction progress. ..
Eight. In the process of template fabrication and installation, Party B shall abide by various safety systems and take necessary safety protection measures. Do a good job in production safety.
9. Party B shall organize a team to complete the template production and installation, and shall not transfer it to a third party for production and installation. Otherwise, Party A has the right to terminate the contract, and the losses caused thereby shall be borne by Party B. ..
X quality and technical requirements: the sub-item quality evaluation must meet the qualified standards. And cooperate (or authorize) with the supervisor on site; If the eligibility criteria are not met, the contract price will be reduced by 10%.
Xi。 Safety requirements: Party B's personnel must abide by on-site safety production rules and regulations and national building regulations when entering the site. Accept the safety education and disclosure of the company and the construction site. Be responsible for the obligations and responsibilities in the Responsibility Letter for Work Safety and any production safety accidents caused by Party B's own reasons.
1, each shift should have a part-time safety officer to carry out the relevant safety behaviors of the shift, make safety records before the shift and do a good job in the safety management of the shift.
2, fixed machinery construction and special type of work operators, to show certificates.
3, construction machines and tools should be installed in accordance with the provisions, the necessary protective cover, should be approved by the site full-time safety inspection before use, can be put into use.
4. Party B must provide the employee's ID card, temporary residence permit and marriage and childbirth certificate (copy). If you don't have a job certificate (work permit), look at the local regulations, and the expenses required for Party A's agency shall be borne by Party B. ..
5. Party B shall not open the derrick without authorization, and it is forbidden to lift cranes and carry people. If a fine of 1 ,000 yuan is found at one time, Party A has the right to terminate the contract several times.
6, beyond the derrick hanging rod template can't feed from the derrick, otherwise each fine 1000 yuan.
7. Advocate civilized construction, clean up the site after work, abide by Party A's on-site civilized construction management system, and improve the relationship with construction, supervision enterprises, Party A and other teams. Every worker must be required to observe discipline, not to fight, not to make trouble, and if there is any violation, Party B shall bear the responsibility.
8, the template system must ensure that the geometric dimensions are accurate and firm, and sagging, die expansion, slurry leakage and other phenomena are not allowed. Every time concrete beams, slabs and columns are poured, there must be someone to follow them to ensure the quality. If the concrete expansion formwork exceeds the allowable deviation value, Party B shall be responsible for leveling immediately after formwork removal. After installation and formwork removal, the garbage and materials on the board and floor should be cleaned in time to avoid affecting the construction of the next working procedure. After the completion of the project, all woodworking materials must be piled back to the designated location, and construction waste is not allowed to fall down from the floor.
9. Party B must strictly abide by and implement the above provisions, otherwise, Party A has the right to impose a fine item by item, which will be deducted at one time in this month's settlement. If the circumstances are serious, they shall be retired.
10. Project quality and acceptance standard: the project quality must conform to the current national construction and acceptance standards and the regulations of the construction and supervision enterprises and Party A. If losses are caused due to design and management reasons, Party A shall bear all economic responsibilities; Party B shall be responsible for the rework caused by the operator's recklessness, speed and failure to operate according to the specifications, and all the material waste and economic losses caused thereby shall be compensated by Party B. ..
Twelve. Liability for breach of contract:
1. During the template installation, if Party B fails to construct according to the drawings and design requirements provided by Party A, Party A has the right to terminate the contract. If the project quality is affected due to Party B's reasons, Party A has the right to order Party B to rework, and the losses caused thereby shall be borne by Party B. ..
2. If Party A stops work for more than one month during the construction period, Party A will settle the project payment, and Party B has the right to terminate the contract and take away the formwork.
3. After the contract is signed, if either party fails to perform the contract, it shall pay the other party a penalty of 50,000 yuan.
4. If Party B fails to complete the production and installation of each batch of templates within the time agreed in the contract, it shall pay Party A the overdue fine of 500 yuan for each day overdue and reward 200 yuan one day in advance. If it is overdue for five days, Party A has the right to terminate the contract and arrange for others to install it.
Thirteen. This contract is made in duplicate, one for each party.
Fourteen This contract shall come into effect after being signed and sealed by both parties.
Party A: Party B: