Current location - Recipe Complete Network - Catering franchise - Summary of supervision work
Summary of supervision work

Summary refers to a kind of written material that social groups, enterprises and individuals review and analyze the study, work or its completion at a certain stage, and draw lessons and some regular knowledge. It can help us find the rules in our study and work. Let's write a summary for ourselves. How should we write a summary? The following are four summaries of supervision work I collected for you, hoping to help you. Summary of supervision work 1

October is coming to an end, the weather is getting colder, and the work in the supervision company has gone through a whole year. Looking back on the year when I left the university campus, entered the society and joined the work, I successfully completed the transformation from a fresh student to an intern to a supervisor. With the training of leaders, the help of predecessors and the encouragement of colleagues, I have grown a lot this year; I have gained a lot in my own exploration, study and work this year. Take this opportunity to summarize the work of this year, carry forward the advantages and make persistent efforts, and correct the mistakes in time in order to improve and improve in the future work.

Overview of the work in one year and one year

According to its own situation, this year's work of the supervision company can be divided into the following three stages: 1) Auxiliary work stage

Just because I didn't graduate from communication-related major, I didn't know much about the relevant knowledge of communication engineering, and I only engaged in some auxiliary work such as checking the design scheme, reviewing the completion documents, and assisting Shenyang Unicom Company in the final accounts of indoor distribution engineering materials, and

It is the work at this moment that gave me a basic understanding of the related technologies of communication engineering, and with the help of my predecessors, I had to know the nature, materials and procedures of supervision work, and then I went to several indoor distribution sites with my predecessors, which laid a good foundation for future work.

2) I entered the site adaptation stage for the first time

After the New Year, I was sent to Jinzhou Project Department to join the site supervision of Jinzhou Unicom WCDMA network (Phase III) base station project.

The work at this moment is hard and fruitful. This moment is precisely because of the high pressure and intensity of work, which brings you the opportunity to maximize your own value. While successfully completing this project supervision work, it has improved the potential of business communication, increased work experience and learned about related technologies.

3) I officially entered the leading role stage

After the Spring Festival, I continued to work in Jinzhou Project Department, and participated in the training of communication engineering supervision technology and management knowledge organized by the company, as well as the safety production training of provincial communication engineering industry.

It was followed by the site supervision of Jinzhou WCDMA network (Phase IV) base station project, Jinzhou G network (Phase 17) base station project, supporting transmission project, Jinzhou residential area coverage project, Jinzhou indoor distribution project and EPON and WLAN project. In addition, some auxiliary work was completed, such as image data collection and engineering-related materials archiving, which greatly supplemented the integrity of supervision work.

through the continuous work in the engineering site, continuous learning in training, and the complementarity between the two, we have gained a lot. During this period of time, I have basically adapted to the supervision work, and I can arrange my life, daily work and work when the project is intensive. I can proudly say that I have officially entered the leading role of communication engineering supervision.

II. Overview of one-year study

As mentioned earlier, the work itself is a process of continuous learning, and the training on supervision technology and management of communication engineering organized by the company, as well as the safety production training of provincial communication engineering industry, have also brought good learning opportunities.

Through the training organized by the company, I got a systematic understanding of the knowledge system that I should master in my work. After work, I learned some common communication knowledge in my work, the specification requirements in the project and the relevant laws and regulations of project supervision through the network.

organizational management potential, comprehensive analysis potential, coordination potential and written and verbal expression potential are also important potentials that an excellent engineering supervision worker should have. Through the help of leaders, communication with colleagues and work training, these have been greatly improved.

III. Advantages and Disadvantages

People are introspective. By reviewing some of their own performances in one year's work, their own advantages and disadvantages are particularly clear. Enthusiasm for work, learning attitude and overcoming difficulties in oneself have always been advantages worth developing. The shortcomings and problems that are being solved are as follows: the technical level is still very limited, the work is not paying enough attention to details, it is still impetuous to deal with complex work and the stage of high work intensity, and the work that needs cooperation with colleagues is not done well enough.

In the future work, we will make great efforts to correct these shortcomings, and strive to improve our technology through continuous learning and reach the level of competent supervision; Get rid of the problem of not doing things carefully enough, and don't lose points in details; With the stability that an adult should have, to deal with the problems at work and solve them calmly; When colleagues need to cooperate with each other, listen to the arrangement of the leader and cooperate with colleagues attentively.

In this short year, both work potential and work-related skills have been greatly improved from scratch and from weak to strong. In this year's work, I have gained a lot. In the next moment, I will continue to learn and improve. Create higher value for the company with your heart, strive to achieve greater work results, and correct your own shortcomings in all aspects.

Finally, thank you again for your concern and help to me, a newcomer, during this year. Summary of supervision work 2

I was entrusted by ZZ Automobile Sales Company. According to the entrustment supervision contract signed by both parties, Juyu Supervision Company has completed the supervision of the office building, maintenance workshop and warehouse project of ZZ Automobile Sales Company in the construction stage. The supervision of this project is summarized as follows:

1. General situation of the project

This project is 1# and 2# of FAW 4S shop in XX city. The total construction area is 7211m2. The drawings adopted were designed by Inner Mongolia Siwei Architectural Survey and Design Co., Ltd. This project has 2 floors above ground and 3 floors locally. The foundation of this project is C11 concrete cushion, C21 reinforced concrete independent foundation, C15 one-step rubble concrete foundation and C15 two-step rubble concrete foundation. The elevation of the basement is-1.851m.. The external wall of the first floor of the main body is 371mm (without thermal insulation). Integral cast-in-place, 7-degree seismic fortification. Exterior wall plastered with cement mortar and rolled with exterior wall coating. The facade window is aluminum alloy window, the floor is cement calendered, and the three-story roof is waterproof and thermal insulation.

this project is constructed by faw 4S shop in XX city, designed by inner Mongolia Siwei architectural design institute, supervised by XX juyu engineering construction supervision co., ltd., surveyed by exploration institute, supervised by XX city quality inspection station, and generally contracted by XX jinxing construction engineering co., ltd ..

2. Quality control in supervision work

1. Adhere to the principle of quality first, people-centered control, quality standards and prevention first. Carry out supervision business according to the current national engineering quality inspection and evaluation standards and mandatory provisions, as well as national laws and regulations on quality management.

2. Participate in the blue prints.the design: examine and approve the construction organization design and construction quality assurance measures of the construction scheme submitted by the construction unit, and carefully explain the construction methods and techniques of key parts to specific operators, so as to ensure the engineering quality.

3. The quality certification documents, factory certificates and material test sheets of all incoming materials, finished products and semi-finished products were reviewed, and the concrete and mortar equipped on site for checking the quality of components were randomly sampled at the mortar pouring place.

4. During the construction, we mainly supervised and inspected the personnel, construction machinery, equipment and materials, construction methods and technological operations in the construction process, and timely corrected and controlled the phenomenon of illegal operation and construction not in accordance with the design requirements, construction drawings, construction specifications and quality standards. We also conducted on-site supervision and inspection of important parts in the construction process to ensure the quality of materials and technological processes, and also conducted on-site follow-up inspection of the construction process prone to common quality defects to ensure.

5. Inspection of process products and process handover inspection, and mutual inspection and self-inspection of concealed works in the construction unit. On the basis of mutual inspection, the personnel established also carried out the process handover inspection, and the concealed works can only be concealed after being inspected by the supervision personnel and approved in writing to prevent the occurrence of quality hidden dangers and quality accidents.

6. Professional engineers are provided for on-site follow-up guidance for water heating and lighting, and all materials are sampled and tested on the spot. After the construction is completed, tests such as pressure test, irrigation and electrical commissioning are carried out respectively, thus ensuring the construction quality of water, heating, electricity and sanitation projects.

iii. this project started on March 21th, 21xx.

Completion on October 5, 21xx With the close cooperation of all parties involved in the construction, all links in the whole construction process were strictly controlled, carefully organized and constructed, and the construction task of the whole project was successfully completed with good quality and quantity.

IV. Evaluation of project quality

According to the current national engineering quality inspection and evaluation standards and mandatory provisions, the foundation and main structure of office buildings, maintenance workshops and warehouses are safe and reliable. Floor engineering, roofing engineering, decoration engineering, doors and windows and other sub-projects are all qualified. Summary of supervision work 3

The year of 21xx is coming to an end. Looking back on the work of 21xx, there are fruitful joys, difficulties in tackling key problems with colleagues, and melancholy when encountering difficulties. Time flies, and unconsciously, the year of 21xx is coming. This year's important work is summarized as follows:

1. Main work contents of my personal year

During this year, I mainly participated in the first-phase customs clearance project of Yantai Bonded Port Area, the general survey of underground pipelines in Yantai City, the restoration project of the three jetties yard in Yantai Port, the displacement observation of the comprehensive building and the measurement of several projects of the company.

II. Fulfillment of post responsibilities

In this year's work, I still carry out all kinds of work with the attitude of learning while working, sum up the process and main points of each work, find out the problems I don't understand, consult the specifications in time and consult with leading colleagues, and accumulate work experience bit by bit. In terms of engineering quality, strict supervision is carried out according to supervision specifications, engineering drawings and Supervision Rules. When I participated in the customs clearance project of the bonded port area, I spent most of my time on the site. The project seems simple, but the site scope is very large, and many points are constructed at the same time. We must grasp the key points of supervision to reduce the workload and improve the work efficiency and effectiveness at the same time. If you find that you can't solve the problem, report it to the project leader in time and consult the relevant specifications. While solving the problem, you also fill your own knowledge gap in this field, and you can solve it independently next time you encounter similar situations. The parts that need to be on-site shall be on-site all the time and recorded on-site, and the concealed works to be accepted shall be accepted in strict accordance with the acceptance specifications. If the acceptance is unqualified, the next working procedure of construction is strictly prohibited. Check and confirm the original certificate test report and quality certificate of materials and equipment entering the site, and witness sampling and parallel testing of steel bars and interlocking blocks. For projects with overlapping operations, coordinate the construction sequence of each construction unit on site, and strive to achieve the best. At the end of each month, the site construction situation will be checked with the construction plan, and if the progress is behind, the construction unit will be required to take measures to speed up the construction on the premise of ensuring the quality.

engineering data:

write a supervision diary according to the site conditions every day, sort out and file the on-site records of that day, and urge the construction unit to report the corresponding engineering data. Regularly arrange and file witness sampling, parallel detection and other data, and make a good account of each item, so as to prepare and file the data at the end of the project.

Third, the feelings and shortcomings of work experience

Through this year's supervision work, I feel that as a supervisor, only by being moral, strict with self-discipline, integrating into the team, respecting others and working conscientiously can I win the respect of others. I came into contact with many new things at the construction site. With the careful guidance and help of my old colleagues, I learned a lot of new theoretical knowledge and practical experience, which broadened my knowledge.

I have gained a lot in this year's work, but there are also many shortcomings, such as lack of work experience, lack of care and patience in the face of intense work, which also lead to many flaws in my work. In the future work, I will study hard, constantly sum up experience, learn lessons, correct my own shortcomings, and strive to achieve strengths and avoid weaknesses.

IV. Personal career development opinions and opinions on the company next year

Being engaged in supervision work, knowing too much is too little, and I can never be satisfied with the present. Therefore, I will still ask more questions, learn more and do more next year, and gradually learn various professional knowledge according to the needs of my work. Abide by the company's various management systems in work and life, strengthen the cultivation of team consciousness, further integrate into our collective, and use spare time to learn more norms and read more relevant papers to improve their professional level. I also hope that the company will organize more training for our new employees so that we can better adapt to this job, so that we can do more things for the company. Summary of supervision work 4

As 21xx is about to pass, I have made the following summary on the work of our bureau this year:

First, strengthen political and ideological study and comprehensively promote party building in government organs

(1) focus on ideological and political construction and carry out intensive educational activities. I personally participated in every study and activity of centralized learning and teaching. If I was delayed due to business trip, I consciously made up lessons as required after I came back, so that my study and work were both correct and promoted. In order to find out the outstanding problems in our bureau, especially in the leading bodies, we solicited opinions and suggestions from all sides, and on the basis of heart-to-heart communication and careful preparation, we held a high-quality democratic life meeting for the leading bodies, found out the existing problems, analyzed the causes, formulated rectification measures, and strictly implemented them, which received obvious results.

(2) carry out democratic centralism and strengthen the construction of leading bodies. In the work, we should conscientiously implement democratic centralism, strive to create a strong inner-party democratic atmosphere, and implement democratic management, democratic decision-making and democratic supervision; Listen to opinions from all sides extensively, and do not engage in paternalism, centralized, or black-box operation; When something happens, I sit down with the team members to communicate more and communicate frequently, and strive to achieve * * * knowledge and form a joint effort; Major issues such as the use of large amounts of funds, the selection and appointment of cadres, personnel changes, etc. are all decided by the collective research of the team, and no temporary motions are made. At present, the leadership team is United and coordinated, and everyone is thinking in one place and working hard in one place, which has effectively played the role of fighting fortress and leadership core.