Jinhua Railway Station was unsealed at 1: 11 on May 1. With the situation of epidemic prevention and control in Jinhua, Zhejiang Province continuing to improve, passengers' boarding and disembarking services in and out of jinhua station and Jinhua South Railway Station will be resumed from 11: 11 on May 1, and tickets for trains departing and arriving at jinhua station and Jinhua South Railway Station will be resumed from 18: 11 on April 31.
jinhua station building scale
The jinhua station Elevated Waiting Room has a total area of 1658 square meters, which can accommodate up to 8,511 passengers. There are 1178 passenger seats, including 48 military seats and 48 business seats. The jinhua station Waiting Room has 11 ticket gates and 36 entrance gates.
as of February 2118, the newly-built station building in jinhua station covers an area of 31,111 square meters, including about 1,111 square meters for the north station building and waiting room, 9,111 square meters for the south station building and waiting room, and 74,111 square meters for the underground space of the square, including 64,511 square meters for the south square and 9,611 square meters for the north square.
jinhua station is a combination of north and south. The station building is divided into two floors, the upper floor is mainly catering. After the jinhua station is fully completed and put into use, the north and south elevated waiting halls will be merged into one, and Station 1 will be equipped with 11 riding platforms and passages. Among them, lanes 1 to 5 are ordinary speed trains, and lanes 6 to 11 are high-speed trains.