Environmental protection target responsibility book
Responsibility letter for environmental protection objectives (5 general rules)

In a progressive society, the frequency of using responsibility letters is increasing gradually, and signing responsibility letters is helpful for us to perform our duties better. You had no idea when you drafted the responsibility book? The following is the environmental protection target responsibility book (5 general remarks) I compiled for you, for reference only, and you are welcome to read it.

Environmental Protection Target Responsibility Letter 1 In order to comprehensively promote rural environmental protection, establish a good environmental protection supervision responsibility system, improve regional environmental quality, promote the synchronous win-win situation of environmental construction and economic construction in our county, focus on improving the living environment, solve people's livelihood problems and build ecological civilization, the county people's government and the township government signed a 20xx annual environmental protection target management responsibility letter, and formulated the following assessment methods according to the contents of the management responsibility letter:

I. Evaluation institutions

The assessment of the environmental protection target responsibility book is organized by the Kangxian People's Government in a unified way, and the personnel from relevant departments are deployed to form an assessment team to assess the completion of the township responsibility book item by item, form an assessment opinion and finally rank it, and accept supervision from all walks of life.

Second, the evaluation form

The evaluation team will make an evaluation at the end of the year. The evaluation takes the form of listening, checking, watching and asking. By holding a forum, visiting relevant personnel, consulting relevant materials and records, etc., the relevant materials, data and records of the implementation of the responsibility book in the past year were reviewed, and the assessment team scored the implementation of the responsibility book fairly, openly and fairly. The year-end assessment shall be completed before the end of the current year1February, and the assessment results shall be announced in the first quarter of the following year.

Third, reward and punishment methods

The assessment adopts a percentage system, and the top 7 are rewarded according to the assessment score ranking. Among them, the first prize is 1, the bonus is 2,000 yuan, the second prize is 2, the bonus is 1500 yuan, and the third prize is 4, and the bonus is 1200 yuan. Honorary certificates are issued for each award. Ranked at the bottom of the county's informed criticism, those who have had major pollution incidents will be given certain economic penalties. According to the basic national policy principle of environmental protection, a one-vote veto system is implemented.

Environmental protection is a basic national policy and a strategic measure for sustainable development. In order to effectively control environmental pollution, protect the ecological environment of the mining area, promote the healthy development of environmental protection in our mine and form a situation of * * * management, according to the requirements of the environmental target responsibility system of the group company and the actual situation of our mine, the environmental target of our mine is now decomposed into various units, and the mine manager and your unit will sign a 20XX annual environmental target responsibility letter. Details are as follows:

First, the intensity of environmental management.

1, the director should personally grasp the environmental protection work of the unit, take overall responsibility, and really incorporate environmental protection work into the assessment of the management objectives of the unit.

2, responsible for mine environmental protection planning, actively participate in mine new, renovation and expansion projects of environmental impact assessment and environmental protection project design, construction and acceptance.

3, strictly abide by the national, provincial, municipal, company and other relevant environmental laws, regulations and policy requirements.

4, strictly implement the mine "occupational safety, health and environment management system" in the responsibilities and program file requirements, in order to maintain the normal operation of the system.

5. Actively cooperate with the work of the superior environmental protection department.

6. Accelerate the research and development of the "three wastes" treatment project, and ensure advanced equipment selection technology and reliable performance.

7. The Environmental Protection Office decomposes the company's target responsibility system and evaluates the completion of each unit's target responsibility system.

8, strengthen the operation management of mine environmental protection facilities and equipment, to ensure the normal operation of facilities and equipment.

9. Actively coordinate the approval, implementation and use of environmental protection funds.

Second, the environmental management indicators:

1, the implementation rate of environmental impact assessment for new projects or technological transformation projects 100%, and the implementation rate of "three simultaneities" system for project construction projects 100%.

2. Actively implement the completion of environmental protection funds to ensure that the implementation rate of environmental protection funds reaches 100%.

3. Completion rate of key mine environmental protection projects 100%.

4. Strengthen the operation management of environmental protection facilities and equipment, with the facility operation rate reaching 100% and the intact rate reaching 98%; The discharge standard rate of "three wastes" reaches 100%.

5. Conduct on-site inspection of environmental protection facilities and equipment twice a month.

6, sewage charges, monitoring fees and other environmental protection fees paid rate 100%.

7. Organize environmental publicity and education activities in World Environment Day.

8. Timely and accurately report all kinds of environmental protection reports.

III. Provisions on Assessment and Reward and Punishment

1, the leader in charge shall inspect the environmental protection work of the department every quarter, and the inspection results shall be linked to the salary for assessment.

2. At the end of the year, the leaders in charge organized the assessment and failed to complete a fine of 500- 1000 yuan.

3. This responsibility letter shall come into effect as of the date of signature by both parties. During the responsibility period, when the responsible person changes, the successor shall perform the responsibility.

Environmental Protection Target Responsibility Letter 3 In order to strengthen the comprehensive supervision of safety and environmental protection of the group company, prevent and reduce the occurrence of various accidents, ensure the health and safety of employees, gradually improve the environmental quality of the company, and promote the harmonious, stable and sustainable development of the company, xxx Co., Ltd. signed a 20xx annual safety and environmental protection target responsibility letter with the Safety and Environmental Protection Department in accordance with relevant laws and regulations and combined with the company's production practice.

A, safety, environmental protection, occupational health management responsibilities

1. Supervise, inspect, summarize and coordinate the safety, environmental protection and occupational health supervision and management of the whole company under the leadership of the company's decision-making level and safety committee.

2. Seriously implement the national guidelines, policies, decrees, regulations and standards related to safety, environmental protection and occupational health, and organize the formulation, revision and improvement of relevant company rules and regulations in combination with the actual situation of the company.

3. Organize to formulate the company's annual safety, environmental protection and occupational health work plans and targets, and organize their implementation and assessment.

4, to participate in the formulation of safety production capital investment plan and safety technical measures plan, and the specific implementation or supervision of relevant departments.

5. Supervise and inspect the implementation of the safety production responsibility system of each unit and the implementation of safety, environmental protection, occupational health rules and regulations and safety technical operation procedures, and incorporate them into the assessment of economic responsibility system.

6. Explore the management mode of safety, environmental protection and occupational health under the modern enterprise system, and popularize the adoption of new modern management science and technologies. Continuously improve the company's safety, environmental protection and occupational health management level, and realize the scientific and standardized safety, environmental protection and occupational health management of the company.

7, organize safety, environmental protection, occupational health inspection, to find out the problems or hidden dangers, urge the responsible units to rectify within a time limit, can't immediately rectification should report to the company's leadership.

8, in the production, in case of major danger, immediately ordered to stop operation and report.

9, supervise and review the revision of each unit safety technology operating rules.

10, organize or cooperate with relevant units to do all kinds of safety and environmental protection activities, safety, environmental protection, occupational health education and special operations personnel training and evidence collection.

1 1. Participate in the design scheme review and completion acceptance of "Three Construction" projects and major and medium repair projects. And put forward examination and acceptance opinions.

12. Organize the "three simultaneities" review and acceptance of safety, environmental protection and occupational health facilities of construction projects; Participate in reviewing the relevant qualifications, licenses and materials of contracting and leasing units.

13. Cooperate with local authorities to carry out special equipment supervision and inspection, occupational disease physical examination, post occupational hazard monitoring, and production safety evaluation of dangerous chemicals.

14, urging all units to implement the "four prevention" plans and measures in winter and summer; To examine and approve, supervise and inspect health care and labor protection articles, and guide educators of relevant units to wear and use them correctly.

15, strengthen the management and supervision of dangerous operations such as gas, and strictly examine and approve dangerous operations. According to the actual situation, organize the preparation of relevant accident emergency rescue plans, and urge relevant units to organize accident emergency drills on a regular basis.

16, organize the research on occupational poisoning prevention and occupational disease prevention measures.

17, organize and implement publicity and education on safety, environmental protection and occupational health, and summarize and popularize advanced experience in safety production.

18. Organize or cooperate with on-site investigation, investigation, analysis and treatment of industrial injury and environmental protection accidents, make accident statistics, analysis and report, and assist relevant units to formulate accident prevention measures and supervise their implementation.

19, handling social work injury filing, labor ability appraisal, work injury insurance and other related matters; Participate in the company's labor ability appraisal.

20. Regularly report the safety production situation to the company's safety committee.

2 1. Supervise and evaluate the operation status of safety, environmental protection and occupational health facilities in each unit.

22. Supervise and assess the discharge of various pollutants from various units.

Second, the management objectives

1, qualified rate of external audit of special equipment ≥96%, stability and reliability ≥ 100%.

2. The qualified rate of on-site double-set management is over 95%; The qualified rate of three-room hygiene is over 90%; The qualified rate of double standard is over 90%.

3. The standardized compliance rate of the safety team is more than 85%.

4. Safe operation of gas pipeline network and hazardous chemicals facilities.

5. The effective control rate of major hazard sources of hazardous chemicals in the company is 100%.

6. Company-level safety education rate of new employees100%; Special operations personnel shall obtain evidence in time and hold relevant certificates; The certificate-holding rate of the principal responsible person and safety management personnel of the enterprise 100%.

7. The coverage rate of occupational health monitoring in places with occupational harmful factors is100%; The reporting rate of harmful factors is100%; Preliminary establishment of occupational health monitoring files.

8. The reporting rate, identification rate and appraisal rate of industrial accidents are 100%.

9. The total dustfall in the factory area is reduced by10% compared with 20xx years; The compliance rate of organized dust emission is ≥90%.

10, synchronous operation rate of environmental protection facilities and main equipment 100%.

1 1, waste water is discharged up to standard, and waste residue is comprehensively utilized.

12. Safe use of radioactive sources.

Third, the accident control objectives

1, serious injury and above accidents are zero.

2. Large and above environmental accidents are zero.

Fourth, the evaluation method.

1. In case of industrial accidents and environmental pollution accidents, the company will be punished according to the Accident Management Regulations. In case of work-related death accident or major and above environmental pollution accident, the unit leader admonishes for 3 months.

2. Other assessments shall be conducted in accordance with the 20xx economic responsibility system of the Safety and Environmental Protection Department and the target responsibility system for performance appraisal of middle-level cadres.

Environmental Protection Target Responsibility Letter 4 In order to implement the Environmental Protection Law of People's Republic of China (PRC), Administrative Measures for Environmental Protection of Expressway Construction Projects in Jiangxi Province and relevant local regulations on environmental protection and soil and water conservation, and ensure the smooth development of environmental protection management in A6 section of Jida Expressway, A6 Project Management Department specially formulates this environmental protection management target responsibility letter in combination with the actual situation of the project.

I. Environmental protection objectives

Strengthen the environmental protection management of construction projects, prevent and slow down the impact of expressway construction on the environment, control new environmental pollution and ecological damage, and promote the sustainable development of expressway construction.

Second, the environmental protection content

Along the ecological environment, water environment, soil and water conservation, pollution prevention and noise prevention, nature reserves, scenic spots and water source protection areas, sewage treatment, noise prevention facilities, slope protection, drainage works, greening and other environmental protection facilities.

Third, the responsibility of environmental protection.

1. Carry out the construction of the construction camp and construction site according to the principle of "safety, environmental protection, civilization and applicability", and keep the construction camp and construction site clean, sanitary and orderly at all times. After the construction, clean up the site in time, so that the work is finished, the materials are exhausted and the site is cleared. After all kinds of wastes are collected in a centralized way, what can be recovered should be recovered as much as possible, and the remaining solid wastes should be treated in a centralized way.

2. Overall planning, rational layout, overall arrangement of construction land, in accordance with the principle of "safety, environmental protection, rationality and applicability", planning construction land such as borrow yard, spoil yard, operation area, pool, etc., delineating clear and eye-catching construction land boundaries, and prohibiting cross-border construction.

3. Protect the air environment, reduce the emission of dust, dust and mechanical waste gas, ensure that all air indicators meet the standards during the construction period, and take necessary measures to prevent water pollution, protect the water environment along the line, ensure that the construction sewage along the whole line meets the standards, and protect the surface vegetation, land and ecological environment along the infrared construction as much as possible.

4. Protect land resources. After renting temporary land for construction, take measures to restore temporary land and construction access road, and do a good job in protection and greening.

5. The borrow yard should be regular in shape, flat at the bottom and free of water, and the slope should be trimmed according to the designed slope ratio. If the original ground of the borrow yard belongs to cultivated land, it should be excavated and stacked for standby, and vegetation should be restored after the project is completed.

6. Subgrade spoil shall be regularly stacked, leveled and rolled according to the design requirements, and shall not be dumped at will, and drainage, protection and greening construction shall be carried out according to the design. Rocks and stones shall not be discarded at will on hillsides and rivers, and the surface of the spoil ground shall be covered with a certain thickness of soil to restore vegetation.

7. The site selection of spoil ground shall not be changed without approval, and the scale of land use shall be strictly controlled. Do not exceed the design scale to increase the number of land, change the location of the spoil ground or change other design contents at will.

8. The construction unit shall abide by the laws and regulations on environmental protection, take measures at the construction site to prevent or reduce the harm and pollution of dust, waste gas, waste water, solid waste, noise, vibration and construction lighting to people and the environment, and do a good job in environmental sanitation and epidemic prevention.

9. The main roads on the construction site must be hardened. Measures should be taken to prevent dust and leakage in earthwork stacking and transportation. Measures should be taken to ensure the cleanliness of vehicles at the entrance and exit of the construction site. It is forbidden to melt paint and other toxic and harmful substances in the open air at the construction site to prevent air pollution.

10. In order to protect the sound environment along the highway, reduce the interference of construction noise to the people along the highway, and ensure that the noise at the field boundary reaches the standard, the high-noise equipment should be as far away from the urban areas, schools, hospitals and residential areas as possible, and the low-noise equipment should be used as much as possible, and the transportation time of materials should be arranged reasonably to reduce the impact on residents' rest at night.

1 1. All necessary measures should be taken during the construction of bridges and culverts to prevent mud and stones from blocking rivers, canals or irrigation and drainage systems. Ensure the safety of flood control and drainage, and minimize the interference to farmland water conservancy facilities.

12, the tunnel entrance and bridge parts are protected in place, and the slag is abandoned. The slope outside the tunnel entrance should be protected and afforested in strict accordance with the design requirements. The earthwork excavated in the tunnel shall be used as subgrade filler as far as possible, and all the surplus parts shall be transported away and discarded, and support, reclamation and greening shall be done well.

13. During the construction of the project, the project department will organize relevant departments and personnel to conduct inspection and assessment, take corresponding reward and punishment measures, reward activists who protect the ecological environment, and punish those who destroy the ecological environment.

This responsibility shall come into effect as of the date of signing. If the person in charge changes, the successor shall continue to perform his duties.

Environmental protection target responsibility book 5 I. Safety production control target

1. Put an end to major environmental pollution and ecological damage accidents and control them to 0;

2. No major accidents;

3. No major environmental pollution and ecological damage;

Second, the object of responsibility.

Each construction unit is the target responsibility subject, responsible for organizing the implementation and management of environmental protection and soil and water conservation standards within the project.

The supervision unit is responsible for inspecting the environmental protection and soil and water conservation work within the contract section under its jurisdiction, and implementing the rectification work.

Third, the goal of responsibility

1. Strictly implement the relevant national laws, regulations and policies, effectively protect forest resources and natural landscapes, resolutely stop the indiscriminate occupation of forest land, and strictly prohibit acts of destroying forest vegetation such as taking stones and digging holes.

2. Major partial projects must prepare measures and plans for environmental protection and soil and water conservation, take effective measures to strengthen soil and water conservation and environmental protection, and implement the "three simultaneities" system for soil and water conservation and environmental protection in engineering construction.

3, engineering construction waste sand, stone, soil must be transported to the prescribed spoil ground, shall not be dumped at will, damage the surrounding vegetation; The subgrade slope within the red line of engineering construction must be trimmed or other land remediation measures must be taken. After the completion of the project, vegetation must be restored or engineering measures must be taken for soil erosion.

4. Strengthen the supervision of ecological environment protection and restoration. Adhere to "who develops, who protects; The principle of "whoever destroys will recover", abide by relevant laws and regulations, and rectify and repair while constructing. The completed project shall not cause first-class environmental damage and pollution, so as to achieve the purpose of land reclamation and mountain greening.

5. It is forbidden to discharge sewage into drinking water source protection areas and water bodies. Strengthen the treatment of waste water and waste gas, take effective measures to reduce the emission pollution of waste water and waste gas, and treat whoever is wrong and separate oil.

6. Strengthen the protection of forest resources and wildlife. Strictly abide by the Forest Law of People's Republic of China (PRC), the Wildlife Protection Law of People's Republic of China (PRC) and other relevant laws and regulations, and prohibit activities that destroy landscapes, vegetation, topography and landforms, such as destroying forests and grasses at will, picking wild animals at random, dumping waste soil and slag at random.

7. All units shall formulate pollution resettlement and soil and water conservation plans, and take effective measures to protect the surrounding scenery, water bodies, forest and grass vegetation, wildlife resources and topography.

8. Establish and improve the management system of ecological environment protection, improve the management institutions of environmental protection and soil and water conservation, and ensure the necessary facilities, equipment and working funds.

9. The waste gas and dust discharged by the construction unit to the surrounding living environment shall meet the comprehensive emission standards of air pollutants stipulated by the state.

10, the construction noise shall conform to the national Noise Emission Standard at Construction Site (GB 12523-90), and the noise limit at construction site is 70dB during the day and 55Db at night.

165438+

Fourth, responsibility assessment.

The resident office will inspect the environmental protection and soil and water conservation work of the construction unit, and assess the implementation of the responsibility objectives. For the units that fail to meet the assessment standards, the Project Office will be advised to punish them according to the Measures for Project Management in Zheng Zheng.

This responsibility book is made in duplicate, one for each party, and it will take effect after being signed by both parties.

;