Equipment maintenance contract agreement 1 party a:
Legal Representative of Party A:
Address of Party A&; Telephone number:
Party B:
Party B's ID number:
Party b's address
Here are the maintenance items of machinery and equipment, pipelines and lines of Party A's whole factory contracted by Party B, as well as the new machinery and equipment in the factory in the future. According to the General Principles of the Civil Law of People's Republic of China (PRC), the Contract Law of People's Republic of China (PRC) and relevant regulations, the two parties, on the principle of equality, voluntariness and consensus, sign the following labor project contract:
1. Labor contract project: the maintenance of machinery and equipment, pipelines and lines in the whole plant, and the annual expenses paid to government departments for new machinery and equipment (factory air conditioners, computers and boilers) in the future, and the purchase of square pipes for secondary foaming machines. Not including infrastructure).
Two. Contract term: 20xx August 0 1 to 20xx July 3 1.
Third, the contract cost:
4. Payment method of contract fee: pay the fee of last month on 25th of each month. The remaining contracts shall be settled within ten working days after expiration.
Verb (abbreviation of verb) Party B's responsibilities, tasks and requirements during the contract period:
(1) Water use is normal. After evaluation, the water fee shall be borne by Party A and normally consumed by the factory. (The water fee is 3,000 yuan per month as a reference) The pipeline leaked and was not found in time. If it is found that it is not repaired in time, and the total cost of reactive power in the electricity bill exceeds the normal value, Party B shall bear it. ..
(two) the cost of a single part of the equipment is five thousand (5000. 00 yuan), 30% for Party B and 70% for Party A.. If the single machine is not well maintained and needs to be replaced, Party B shall bear the new expenses within 5,000 yuan. Party B shall bear 30% and Party A 70% of the expenses above 5,000 yuan.
(3) During the contract period, the material scrapped due to machine failure is 65,438+000 yuan per bed (65,438+02 beds are allowed to be scrapped every year), and the scrapped products are subject to the company's quality inspection evaluation. If the abnormal maintenance time of the equipment causes losses to Party A, Party A will hold Party B responsible according to the seriousness of the case.
(4) Party A's machinery and equipment can operate normally and use normally according to the current situation, and Party B shall return the equipment that can operate normally and use normally to Party A at the expiration or termination of the contract.
(V) Party B's own personnel, inviters or outsourcing personnel must abide by and obey all the rules and regulations of the factory.
(VI) Party A is responsible for the installation of machinery, equipment and materials in the factory, and Party B has the obligation to cooperate with Party A in the installation and commissioning of equipment. Manufacturing equipment and modified materials shall be provided by Party A, and Party B shall be responsible for manufacturing and installation. After normal operation, the maintenance expenses shall be borne by Party B. The maintenance materials expenses of the new equipment shall be borne by Party A, and the labor expenses shall be borne by Party B. ..
(7) The staff must hold relevant certificates, and Party B must hold low-voltage electrician certificate and welder certificate. No, sign up for study and research within six months.
(VIII) Party B is responsible for the daily fire safety work of the factory. If the factory is in danger, Party B has the obligation to actively cooperate with the emergency rescue work. If the factory is flooded due to the problem of flood pump, both parties shall bear 50% of the losses.
(IX) During the contract period, Party B's own or specially invited resident personnel shall not engage in the maintenance, technical guidance and part-time work of contract machinery and equipment in factories and units that are not conducive to Party A's behavior and competition in the same industry in Guangdong, and Party B's own or specially invited personnel shall not disclose Party A's business secrets or do anything that damages Party A's reputation and image. If Party A is found to have the above-mentioned behavior, Party A may claim compensation from Party B according to the seriousness of the case, and shall be seriously investigated for legal responsibility.
(10) When Party B enters the factory, it will purchase spare parts from Party A's factory at the market price. After the termination of the contract, Party A shall purchase Party B's spare parts at the market price. Party B temporarily borrows Party A's tools and returns them to Party A after the contract is terminated.
Alteration, rescission or termination of intransitive verb contract;
This contract has been carefully studied and carefully considered by both parties and reached an agreement, which must be observed by * * * *. If it needs to be changed, dissolved or terminated, it must be agreed by both parties through consultation. Without the unanimous consent of both parties, it shall not be changed, dissolved or terminated.
Seven. Liability for breach of contract:
(1) If Party A fails to pay the contract fee to Party B on time without any reason, Party A shall pay Party B a late fee of 5% of the monthly contract fee. ..
(2) If Party B fails to perform its duties, tasks and requirements and complete the tasks, Party A has the right to require Party B to carry out new rectification. If the rectification fails, Party A has the right to deduct the contract cost of the current month not exceeding 5% of the total contract cost of the current month.
(3) If Party B and its employees cause losses to Party A's public property, facilities and equipment, Party B shall compensate according to the price.
(4) If either party fails to perform its obligations under this contract or unilaterally changes, dissolves or terminates, it shall pay compensation to the other party at 65,438+00% of the total contract cost during the contract period.
VIII. Labor insurance accidents shall be borne by Party B. ..
Nine. Matters not covered: Other matters not covered shall be negotiated by both parties, and supplementary terms shall be signed as an annex to this contract, which shall have the same effect as this contract. In case of conflict with the relevant national laws and regulations, the national laws and regulations shall prevail.
X this contract is made in quadruplicate, one for each party; One point for Party A's filing; The finance department scores one point.
Signature of the person in charge of Party A: signature (seal) of the person in charge of Party B:
(Seal)
ID number:
Year, month, sun, moon, sun.
Equipment Maintenance Contract Agreement 2 Party A: Limited Company
Legal Representative of Party A:
Address of Party A:
Party B: Name and gender
Party B's resident ID number _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Date of birth _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
The registered permanent residence is located in _ _ _ _ _ _ district (county) _ _ _ _ _ street (township) in _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Home address _ _ _ _ _ _ _ _ _ _ _ _ _ Postal code _ _ _ _ _ _ _ _ _ _ _
Mailing address: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Party B is the on-the-job mechanical maintenance personnel of the Limited Company, and both parties agree through consultation that Party B will provide maintenance and regular maintenance services for Party A's equipment. In this regard, Party A and Party B voluntarily sign this service agreement and abide by the terms listed in this agreement.
Rule number one. This agreement is valid from to, and Party A no longer needs to maintain its ancillary equipment.
Article 2 Rights and obligations of Party A
1. If Party A's equipment breaks down or needs regular maintenance, Party A has the responsibility to inform Party B to arrive at the site in time and provide necessary equipment, personnel support and required spare parts.
2. According to the actual work needs of Party B, the plan review, procurement, storage and requisition of required spare parts shall be subject to professional centralized management.
3. Provide Party B with necessary labor protection articles as required.
4. Be responsible for educating and training Party B on safety production, labor discipline and various rules and regulations.
5. Pay the maintenance service fee of last month to Party B before _ _ _ every month, with the standard of _ _ _ yuan (after tax)/month. The specific payment amount is proposed by the warehouse management department according to the task completion of Party B, and will be cashed by the human resources department after being understood by the production and processing department.
6. Party A shall purchase accident insurance of China Life Insurance Co., Ltd. for Party B to compensate Party B for the accidental injury in the process of providing services to Party A. ..
Article 3 Rights and obligations of Party B
1. Party B is fully responsible for the daily and regular maintenance of all equipment of Party A. ..
2. If Party A's equipment fails, Party B shall guarantee to arrive at the site for treatment within _ _ _ hours after receiving the notice.
3. According to industry regulations, Party A's equipment shall be regularly maintained according to working standards. In case of legal holidays, the equipment should be thoroughly inspected before the holidays, and the problems found should be handled in time to ensure the safety of the equipment during the holidays.
4. Provide Party A with the daily maintenance plan of the equipment, and be responsible for providing necessary maintenance knowledge training and technical guidance to relevant personnel.
5, put forward spare parts purchasing plan on a regular basis.
6. On the Monday of the second week of each month, Party B shall cooperate with Party A to carry out special inspection on the equipment, and put forward improvement suggestions in time for the problems in daily maintenance.
7. Seriously perform their duties and obey management and arrangement. Strictly abide by the safety operation rules in the process of work to avoid safety accidents.
8. Party B shall abide by relevant national laws and regulations and enterprise rules and regulations, and strictly abide by industry norms and professional ethics.
9. During the contract period, Party B or its employees shall not engage in contracted mechanical equipment maintenance services, technical guidance and part-time jobs from factories and units in the same industry that are competitive with Party A. Party B or its employees shall not disclose Party A's business secrets or do anything that damages Party A's reputation and image. If Party A is found to have the above-mentioned behavior, Party A may claim compensation from Party B according to the seriousness of the case, and shall be seriously investigated for legal responsibility.
10. Take care of public property and facilities. If Party B causes economic losses to Party A for personal reasons, it shall be liable for compensation according to the consequences and responsibilities.
Article 4 Other relevant agreements
Where Party B violates the relevant laws and regulations of the State and Beijing and Party A's relevant systems, causing personal injury or property loss to others due to accidents or negligence, or being inspected and punished by the relevant departments, Party B shall bear it by itself, and Party A shall not bear joint and several liability and compensation liability.
Article 5 Under any of the following circumstances, Party A and Party B have the right to terminate this Agreement:
1. Party A delays the maintenance service fee without reason;
2. Party B is incompetent for the post and cannot complete the task without reason;
3. Party B fails to arrive at the site within the agreed time limit for three times without justifiable reasons or fails to perform the service agreement as required;
4, in violation of operating rules or serious dereliction of duty, resulting in personal and equipment accidents, damage to equipment, machinery, waste of raw materials, energy, etc. , causing great economic losses or serious consequences;
5. Violation of national and Beijing laws and regulations and other relevant provisions of the enterprise.
Article 6 During the performance of this contract, if the production and operation conditions of Party A change or the continued performance of this agreement is affected by Party B's age and health, this agreement will be terminated.
Article 7 Supplementary Provisions
1. When the equipment breaks down or needs regular maintenance, the warehouse management department is responsible for notifying Party B and the dispatching room of the production and processing department, explaining the cause and situation of the failure.
2. If Party B fails to arrive at the site in time according to the time limit after receiving the repair notice, the service fee will be deducted each time; In case of emergency, if Party B fails to arrive at the site on time, Party A has the right to arrange other maintenance personnel to carry out on-site emergency maintenance, and the maintenance fee shall be deducted from the service fee accordingly.
Article 8 Matters not covered in this Agreement shall be settled by both parties through consultation.
Article 9 This Agreement is made in quadruplicate, with the Human Resources Department, Production and Processing Department, Warehouse Management Department and Party B holding one copy respectively. ..
Party A (official seal) and Party B (signature and seal)
Date: Year Month Day Date: Year Month Day
Equipment Maintenance Contract Agreement 3 Party A: _ _ _ _ _ _ Co., Ltd.
Party B: _ _ _ _ _ _
The production equipment maintenance project of _ _ _ _ Company is contracted to Party B, and Party B voluntarily undertakes this task. In order to clarify the responsibilities of both parties, the following terms of the agreement are reached through friendly negotiation:
I. Scope of the Contract
Maintenance of production machinery and equipment
Second, the responsibilities of both parties.
(1) Party A shall provide Party B with the machine maintenance site and equipment required for overhaul.
(2) Party A shall provide Party B with machine maintenance meals or reasonable dietary supplements.
(3) Party B shall provide various small tools, gloves and other labor protection articles needed for maintenance.
(4) Party B promises to visit the factory once a week to check the production machines, so as to find potential risks as early as possible.
(5) Party B shall regularly carry out routine maintenance on all production machines every month, and make relevant records to ensure the normal operation of the machines.
(6) If Party A's production machine suddenly breaks down and needs maintenance, Party A will inform Party B in time, and Party B must arrive at the site for maintenance within one hour.
(7) Party B is responsible for keeping all kinds of maintenance equipment and appliances provided by Party A. In case of loss or man-made damage, Party B shall compensate at the original price. If it is damaged by normal use, please replace it with a new one.
(8) If Party B finds spare parts that need to be replaced or sent for processing during the maintenance process, it shall submit a list to the relevant management personnel of Party A in written form, which can only be carried out after approval, otherwise it will not be recognized.
(9) Party B has the obligation to train machine operators on matters needing attention when operating the machine, so as to ensure that Party A's employees do not operate illegally.
(10) During the maintenance, Party B shall abide by the safety regulations to prevent accidents. In case of safety accidents caused by violation of regulations, Party B shall bear corresponding economic responsibilities.
Three. Pricing and payment methods
The contract fee for Party B to provide machine maintenance services for Party A is RMB _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Party A will pay the fee for the first year on the date of signing the contract, and then pay RMB _ _ _ _ _ _ _ _ _ every six months (January and July).
Four. Contract terms
This agreement shall be valid for three years from the date of signing, that is, it shall be terminated on _ _ _ _ _ _ _ _ _ _ _ _.
5. This agreement is made in duplicate, one for each party, and shall come into force after being signed by both parties.
It's done.
Party A: _ _ _ _ _ _ _ _ _ (signature) Date of signature: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Party B: _ _ _ _ _ _ _ _ _ (signature) Date of signature: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Equipment Maintenance Contract Agreement 4 Party A:
Party B:
Party B accepts the entrustment of Party A, and in order to ensure the normal use of Party A's medical equipment, Party B provides maintenance services for the equipment agreed by Party A.. In order to protect the legitimate rights and interests of both parties, Party A and Party B entered into this agreement through friendly negotiation in accordance with the Contract Law of People's Republic of China (PRC). Before signing the agreement for the first time, the agreement can only be signed when the equipment is in normal operation, and the equipment details are attached.
Article 1 Obligations of Party B
1. Party B shall give priority to on-site maintenance according to the notice of equipment failure repair agreed by Party A. During the legal working days from Monday to Friday, users in the urban area and Party B will arrive at the site within 8 hours; For all county users, Party B will arrive at the site within 24 hours.
2. Party B does not charge maintenance fees and working hours.
3. Party B's door-to-door maintenance is not limited.
4. Party B only charges the maintenance spare parts fee, and guarantees that the spare parts fee is equal to or lower than the unified price of the manufacturer.
5. During the three-month warranty period, if the parts replaced by Party B for Party A are damaged, Party B shall replace and repair them for Party A free of charge.
6. Party B shall make an equipment maintenance plan according to Party A's contract equipment, and report to Party A. In case Party A fails to notify the maintenance, Party B shall carry out on-site maintenance of Party A's contract equipment according to the maintenance plan. In general, on-site maintenance service is provided once a month.
Article 2 Obligations of Party A
1. Party A shall notify Party B in time after the equipment fails.
2. Without Party B's consent, Party A shall not use non-original spare parts and consumables, otherwise Party B will not be responsible for equipment failure.
3. Without Party B's consent, Party A shall not invite a third party to repair the agreed equipment, otherwise Party B will not bear the consequences and responsibilities arising therefrom.
4. Party A shall not disassemble the contract equipment without permission, otherwise all losses caused thereby shall be borne by Party A..
5. When the equipment contract breaks down and the accessories need to be replaced, the expenses of the accessories shall be borne by Party A..
6. When the equipment is transferred or transferred, Party A shall notify Party B in time.
Article 3 Settlement Amount and Method
Party A shall pay the maintenance fee of RMB _ _ _ _ _ _ _ _.
Article 4 Matters not covered herein shall be settled by both parties through consultation.
Article 5 The validity period of this contract is tentatively set at one year, in duplicate, with each party holding one copy, which shall come into effect as of the date of signature and seal.
Company of Party A (seal): _ _ _ _ _ _ _ _ _ Legal representative (signature): _ _ _ _ _ _ _ _ _ _ _ Address: _ _ _ _ _ _ _ _ _ Tel: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Fax: _ _ _ _ _ _ _ _ Bank: _ _ _ _ _ _ _ Account number: _ _ _ _ _ _ _ Date: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Party B's unit (seal): _ _ _ _ _ _ _ _ _ Person in charge (signature): _ _ _ _ _ _ _ _ _ _ _ Address: _ _ _ _ _ _ _ _ _ Tel: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Fax: _ _ _ _ _ _ _ _ Bank: _ _ _ _ _ _ _ Account number: _ _ _ _ _ _ _ Date: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Equipment Maintenance Contract Agreement 5 Party A:
Party B:
Party B accepts the entrustment of Party A, and in order to ensure the normal use of Party A's medical equipment, Party B provides maintenance services for the equipment agreed by Party A.. In order to protect the legitimate rights and interests of both parties, Party A and Party B entered into this agreement through friendly negotiation in accordance with the Contract Law of People's Republic of China (PRC). Before signing the agreement for the first time, the agreement can only be signed when the equipment is in normal operation, and the equipment details are attached.
Article 1 Obligations of Party B
1。 Party B shall give priority to on-site maintenance according to the notice of equipment failure repair agreed by Party A. During the legal working days from Monday to Friday, users in the urban area and Party B will arrive at the site within 8 hours; For all county users, Party B will arrive at the site within 24 hours. 2。 Party B does not charge on-site maintenance fees and working hours. 3。 There is no limit to the number of visits by Party B.
4。 Party B only charges the maintenance spare parts fee, and guarantees that the spare parts fee is equal to or lower than the unified price of the manufacturer. 5。 During the three-month warranty period, if the parts replaced by Party B for Party A are damaged, Party B shall replace and repair them for Party A free of charge.
6。 Party B shall make an equipment maintenance plan according to Party A's contract equipment, and report to Party A. If Party A fails to notify the maintenance, Party B shall carry out on-site maintenance of Party A's contract equipment according to the maintenance plan. In general, on-site maintenance service is provided once a month.
Article 2 Obligations of Party A
1。 After the agreed equipment fails, Party A shall notify Party B in time.
2。 Party A shall not use spare parts and consumables that are not approved by Party B, otherwise Party B will not be responsible for the equipment failure.
3。 Without the consent of Party B, Party A shall not invite a third party to repair the agreed equipment, otherwise Party B will not bear the consequences and responsibilities arising therefrom.
4。 Party A shall not dismantle the contract equipment without permission, otherwise all losses caused thereby shall be borne by Party A..
5。 When the equipment contract expires and the accessories need to be replaced, the expenses of the accessories shall be borne by Party A..
6。 Party A shall notify Party B in time when the equipment is transferred or transferred.
Article 3 Settlement Amount and Method
Party A shall pay RMB _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Article 5 The validity period of this contract is tentatively set at one year, in duplicate, with each party holding one copy, which shall come into effect as of the date of signature and seal.
Party A's unit (seal): legal representative (signature): Address: Tel: Fax: Bank of deposit: Account number: Date: Year.
Party B's unit (seal): person in charge (signature): address: telephone: fax: bank of deposit: account number: date: year month day.