Current location - Recipe Complete Network - Catering franchise - Do you have a quotation sheet of engineering decoration materials, labor costs and mechanical shift fees in Xiamen and Zhangzhou?
Do you have a quotation sheet of engineering decoration materials, labor costs and mechanical shift fees in Xiamen and Zhangzhou?

The labor cost and machine shift cost of construction workers in different places are quite different due to the regional economy, transportation, logistics, building materials level, construction difficulty coefficient, etc. Take Xiamen as an example, only by distinguishing three or four different quotations on and off the island can we budget the project expenditure and control the cost.

* List of classified valuation of labor cost for partition wood works

1 gypsum board light steel partition wall (75 keel with 1.5 thickness) 61—81 yuan /㎡

2 gypsum board light steel partition wall (cleaning) 25—31 yuan /㎡

3 9% plywood light steel partition wall (75 keel with 1.5 thickness) 91 yuan/㎡ < ㎡

5 9% calcium silicate board light steel partition wall (75 keel with 1.55 thickness) 91-111 yuan /㎡

6 ordinary flat ceiling (cleaning) 12-31 yuan /㎡

7 ordinary right-angled ceiling (cleaning) 21-41 yuan /㎡

8 craft ceiling (cleaning) 31. Has grown two millimeters

11 wooden double-door sandwich (contractor and contractor) 411—511 yuan/has grown two millimeters (height below 81cm) 121—151 yuan/linear meter

12 wooden high cabinet (front projection area) 121—151 yuan/㎡

. Front projection area) 311-611 yuan /㎡

15 wooden cabinet (contracting and packaging area) 121-181 yuan /㎡

16 wooden curtain box 21 yuan/yanmi

17 leather and cloth soft bag (contracting and packaging material) are priced according to the material price

18 carpet laying (contracting and packaging material) ㎡

21 aluminum-plastic plate wrapping 21-51 yuan /㎡

21 skirting line installation (plastic \ Wood) 11 yuan/linear meter

* List of labor costs for water supply and drainage and electrical sub-projects

A1 electric line installation (including lighting, socket, telephone, network, etc. * cleaning) 21-31 yuan /㎡

A2 simple lighting line installation (lighting, socket * cleaning) 8-11 yuan/㎡

. Parts

B2 urinal installation 51 yuan/parts

B3 ceramic column washbasin installation 51 yuan/parts

B4 ceramic squatting pan, toilet (toilet) embedded installation 81 yuan/parts

B5 brick-concrete wall opening, trunking 15 yuan/linear meter

B6 concrete wall, concrete floor trunking 31 yuan/linear meter

C1 * electrical circuit. Depending on material pricing) 21—45 yuan/Yimi

C2 * Electrical wiring installation (dark wiring, contracting and material pricing) 31—55 yuan/Yimi

C3 * Installation of drain pipe (PPR exposed pipe, contracting and material pricing) 31—45 yuan/Yimi

C4 * Installation of drain pipe. C three charging forms

* 2111 The price of water and electricity installation is about 25-65 yuan/㎡ (contract and materials, The price depends on the brand specification and grade of the material)

* Metal plastic steel window. List of classified valuation of glass labor costs

1 Aluminum alloy doors and windows (the price varies with the brand grade of aluminum alloy) 161-251 yuan /㎡

2 Stainless steel plate packaging is priced with the material

3 Plastic steel doors and windows (contracting and packaging materials) 161-211 yuan /㎡

4 Glass installation (cleaning) ㎡

5 Installation of stainless steel handrails (height less than 1.2m) (contractor and contractor) 81-121 yuan/linear meter

* List of labor cost classification of bricklayer

1 Indoor wall and floor tile laying (conventional bricklaying and cleaning) 31-35 yuan /㎡

2 Mosaic laying (cleaning) 51-Kitchen and bathroom. ㎡

4 Indoor wall and floor tile laying (conventional, bottom packing) ≥75 yuan /㎡

5 Brick wall laying and painting (cleaning) 21 yuan /㎡

6 Floor painting and leveling (cleaning) 11 yuan /㎡

7 Stone slab laying (cleaning) 35—51 yuan /㎡

8 Marble just hanging (. A (size of aperture)

11 diamond hole (concrete wall) ≥51 yuan/a (size of aperture)

11 toilet bowl, toilet (toilet) installation (cleaning) 81 yuan/a

12 baseboard pasting (stone, tile, cleaning) 11-15 yuan/linear meter

. ㎡

15 Demolition of walls and windows (non-load-bearing cement prefabricated hollow walls and windows) 31 yuan /㎡

16 Demolition of walls (non-load-bearing brick walls) 41-45 yuan /㎡

17 Demolition of walls (reinforced concrete walls) 81 yuan /㎡

* List of itemized labor costs for painting, painting and pasting

1. Two high-grade wall paints for interior wall 25-35 yuan/㎡ (top coat grade)

3-lime soil, grinding and two ordinary wall paints for interior wall 11-15 yuan /㎡

4-ordinary paint roller coating two 5-11 yuan /㎡

5-metallic paint primer, polishing and spraying ≥21 yuan/㎡ (paint grade)