The effect diagram is only a sensory reference picture in general, and the scheme diagram should be specifically called the design scheme, which is a more accurate and constructive overall description of the proposed project. The construction drawing is the guiding drawing implemented by the actual instructors. It is precise and accurate, but it cannot be divorced from the design effect and scheme. In the implementation process, it is allowed to make adjustments and modifications with the consent of the owner due to site constraints or force majeure. Finally, there is the as-built drawing, which is the final result of the whole construction. Jinfeng Honor is recommended. Jinfeng Honor is responsible for the design of staff dining room and food city. It not only completes the design work, but also specially dispatches engineering supervision as supporting services to ensure the high degree of restoration of the project.