Inspector's personal year-end summary essay

Personal Year-end Summary of Testers 5 essays

In the past four years of testing, under the care and guidance of the leaders and the support and help of colleagues, not only did I diligently and practically complete my job, but also successfully completed various temporary tasks assigned by the leaders, and I improved myself in all aspects. The following is my personal year-end summary essay for inspectors, hoping to help you!

Personal Year-end Summary of Inspector (Selected Part 1)

When reviewing drawings, many young comrades still have vague requirements for pile foundation detection. Let's make a summary:

First, pile foundation detection that needs to be done before drawing design: the characteristic value of vertical bearing capacity of single pile used in pile foundation design must be based, as stipulated in Article 5.3.1 of Technical Specification for Building Pile Foundation. The characteristic value of single pile bearing capacity used in the design of pile foundation with Grade A design and pile foundation with complex site conditions with Grade B design must be obtained by piling in the site of the proposed project and carrying out static load test of single pile bearing capacity.

Pay attention to ensuring that the state of test pile is similar to that of engineering pile as far as possible, and comprehensively consider factors such as the excavation of earthwork in the basement of test pile; Note that for the above-mentioned end-bearing piles with a diameter greater than or equal to 811mm, the characteristic value of single pile bearing capacity can be determined by deep plate load test, and it is unnecessary to do static load test of single pile bearing capacity.

second, let's talk about the detection of engineering piles after the completion of pile foundation construction. According to Article 9.4.3 of the Technical Specification for Building Pile Foundations, for pile foundations with Grade A design and pile foundations with complex site conditions with Grade B design, if static load tests have been done before design, unless the construction technology is changed or the construction quality is abnormal, it is unnecessary to do static load tests, and the bearing capacity of a single pile can be tested by high strain. Pile foundation with design grade B and simple site conditions The pile foundation with design grade B and design grade C can only pass the high strain test of the single pile bearing capacity, and there is no need to do static load test unless there are special requirements.

3. Pile foundation with Grade A design and pile foundation with complex site conditions with Grade B design. If the bearing capacity of a single pile is relatively certain according to local experience, the static load test may not be conducted before design, and the static load test may be conducted after the engineering pile is completed.

4. It is added below that the static load test of single pile's bearing capacity detects the sum of the pile's end resistance and side resistance, and the bearing capacity of the soil at the pile end and the pile side. Because the characteristic value is twice when the pile is pressed during the pile test, the stress state is different from that of ordinary engineering piles, so the bearing capacity of the pile body of the test pile must be checked separately. Personal Year-end Summary of Inspectors (Selected Part 2)

Time has passed, and years have passed quietly for 21 years. During my working time, my colleagues took great care of me and often gave me encouragement and help. I will summarize my work in these months as follows:

1. Work Harvest

During these months, as a quality inspector, I have carefully studied the company's quality management control process. According to the requirements of my post responsibilities, I have gained the following points:

1. I have strictly followed the company's management requirements in sampling and storing raw materials, so as not to miss and take many. Learn the physical and chemical properties of various raw materials and store them reasonably.

2. Sample inspection is a fine inspection process. "Details determine success or failure", and I do every experiment with a rigorous working attitude during the experiment. At present, I have mastered the inspection methods and steps of all raw materials. Thanks to my master and my colleagues, you taught me this.

3. data processing when recording data, I record, summarize and report every experimental data on the principle of "being pragmatic and seeking truth". Make no mistakes and make false reports.

Second, feelings and experiences

1. Attitude must be meticulous and careful when deciding all work. You can't always make mistakes. If necessary, check your work results to make sure your work is foolproof. After work, we should always sum up work lessons, constantly improve work efficiency, and sum up work experience. Although I will make some mistakes in my work and be criticized by my leaders, I don't think it is a shameful thing, because I think these mistakes and criticisms can help me avoid similar mistakes in my future work and make me grow up faster in my work. During the period of working with you, I was deeply impressed by their rigorous and serious work style, and I also learned a lot from them that I lacked.

2. The daily work in the post of diligent thinking is tedious and boring after a few days, which requires us to be diligent in thinking, improve working methods, improve work efficiency and reduce working hours.

3. Keep learning and constantly enrich my professional knowledge and skills, which will make my work more handy. If a person wants to make a difference in his position, he must be familiar with the professional knowledge of the position and broaden his knowledge in continuous learning. I am like a blank sheet of paper. I just entered the company without a word. Up to now, the paper is neatly written with handwriting. Leaving school, the unit is my second class. There is no end to learning, and work is another way of learning. After studying in the laboratory for several months, I have now reached the working level of a regular employee.

Third, their own shortcomings

1. Occasionally, careless work leads to work mistakes, which brings unnecessary trouble to the work. In the future, I will carefully complete my job with a rigorous work attitude.

2. Because of personality reasons, others are not active enough. In order to complete the work more perfectly in the future, I will take the initiative to communicate with leaders and colleagues. I hope to learn from them what I can't learn in textbooks through conversation.

Since I left school and stepped into this historical stage, I first felt that this society is very strange. No matter at work or in interpersonal relationships, everything is difficult for me, a fledgling person. After these months of baptism, I have really grown a lot. The end of 21__ year and the arrival of 21__ year are both the beginning and the end. What is displayed in front of me is a fertile ground for me to gallop, and I clearly feel the heavy responsibility. In my future work and life, I will continue to study, practice deeply and constantly improve myself, and live up to the opportunity and leadership given by Blue Mountain Tunhe and the cultivation of my colleagues. I will grow up with Blue Mountain Tunhe. Personal Year-end Summary of Inspectors (Selected Part 3)

Various branches, tax bureaus and inspection bureaus:

ISO quality inspection system has played a guiding role in standardizing and institutionalizing the tax collection and inspection service process of our bureau for several years. Quality inspection is a long-term work determined by our bureau and the lifeline of local tax collection and management. In order to ensure the continuous, appropriate and effective operation of quality inspection, According to the requirements of the higher authorities, combined with the actual work of our bureau, the main work arrangements for quality inspection in 21__ are as follows:

1. Business training and learning of system documents

The county bureau organizes a training to improve the professional quality of internal auditors (quality inspectors). Participants: 1. All internal auditors (quality inspectors);

2. All departments need to increase personnel, especially rural sub-bureaus with insufficient internal auditors. The training time is tentatively scheduled for September, 21__, and all units should make overall arrangements to ensure the implementation of personnel and the guarantee of training time, and report the additional personnel to the Quality Control Office in writing before the end of August, 21__. Each department should organize the internal version of system documents to study systematically according to the working characteristics of the department, make learning records, and improve the quality of post personnel to ensure the effective operation of the quality inspection system.

II. Internal Audit

The county bureau will arrange an internal audit, tentatively scheduled for October, 2111. The purpose of the audit is to evaluate whether the quality inspection system and related results of this bureau meet the requirements of standards and quality inspection system documents in the past year;

audit: bureau leaders, all departments, tax bureaus and inspection bureaus;

audit scope: the whole process of tax collection and management services, with detailed plans and specific time to be notified separately. Before this, all departments should do a good job in internal inspection of each post, keep records, and sort out internal audit materials and other various materials.

III. Inspection review

In February, an inspection review meeting was arranged to mainly evaluate the effectiveness, sufficiency and suitability of the quality inspection system, the suitability of the quality policy and quality objectives, make a year-end summary and determine the work plan for the new year. Specific requirements:

1. The heads of various departments reported the work situation in the past year, the implementation of the quality objectives, existing problems, improvement measures, the work plan for the new year and at least one item.

2. Before this, the Supervision Department will do a good job in taxpayer satisfaction survey and report the taxpayer satisfaction survey;

3. the collection and management department evaluates the implementation of the collection and management quality objectives.

iv. modifying documents

according to the changes of tax policies and the needs of daily tax collection and management, the office will take the lead in organizing relevant departments, tax bureaus and inspection bureaus to comprehensively modify the system documents of version B, tentatively scheduled for August-September, and each department will carefully sort out the contents that need to be modified, and submit relevant materials to the office before the end of August, which will be responsible for promulgation.

V. Decomposition of quality objectives

According to the content of quality objectives issued by the provincial bureau, all departments should conscientiously implement the quality objectives of their own units, conduct analysis on time, continuously improve their work, and complete all work with good quality and quantity.

VI. Assessment and Selection

On the basis of the inspection review meeting, the quality inspectors and excellent quality inspectors are assessed and evaluated. For detailed requirements, please refer to the Notice of Xinchang County Local Taxation Bureau on Carrying out Quality Inspector Assessment and Excellent Quality Inspector Selection Activities (No.21__] 18), which was carried out in February, 21 _ _.

VII. Summary of Work

According to the work requirements of the provincial bureau and the summary of various departments, the quality control office of the county bureau will summarize and assess the quality inspection work before the end of October, 21__, submit the assessment materials to the municipal bureau on time, and accept the assessment and acceptance of the superior departments. Personal Year-end Summary of Inspector (Selected Part 4)

Since I joined X Engineering Inspection Co., Ltd., I have abided by the company's rules and regulations, actively obeyed the work arrangement of the leaders, successfully completed the work tasks, safeguarded the collective honor, demanded progress in thought, actively responded to the company's call, and conscientiously implemented the company's documents and meeting spirit. Work hard, work hard, study relevant experimental knowledge seriously, and constantly enrich and improve yourself. In this year, there were difficulties and gains. As a result of serious work, I completed my duties and strengthened my own ability. Here, I will briefly summarize as follows:

I consciously accept the supervision and help of leaders and colleagues, persistently overcome my own shortcomings, make up for my own shortcomings, and strive to stand the test in the long years to come. Do my own job and daily work well, start from me, start from now, start from the small things around me and persevere, do my best in my job and make achievements for the company. I will constantly improve my job skills, strive to master my job knowledge and do my job down-to-earth.

I always believe that no matter in work or life, no matter what you do, no matter what you gain, so I have been working hard, studying hard and working hard. Love your own job, be able to treat every job correctly and seriously, work hard, attend work on time, make effective use of working time, ensure the inspection task to be completed on time, and ensure the smooth inspection of the project, which shows that our testers have a strong sense of responsibility and carries forward the working and hard-working spirit of our testers.

since I joined the company, my work is mainly to test and inspect civil engineering materials (cement, sand, stones, steel, bricks, etc.) and finished products (steel weldments, concrete test blocks, etc.);

participate in the concrete mix test, etc. Although these tasks are simple and boring, most people think they are simple, but after working for several years, it is actually not that simple: I have contacted more project inspections in the laboratory one after another, defined the working procedures, and formed a clear working idea in specific work, so that I can carry out my work smoothly and complete my job skillfully and satisfactorily.

I dare not neglect my work at all. I ask myself to write down the gains and losses in my work and the problems that appear every time in order to learn lessons. When I encounter difficult problems or difficulties in my work, I will consult my colleagues and leaders, patiently listen to the opinions put forward by others and improve my work.

although I have made some small achievements since I joined the company, it is still far from the company's expectations. In the future work, I will work harder, constantly improve my professional and technical level, and better complete the tasks assigned by the leaders. Broaden our thinking, deepen and refine our work, and strive to make greater contributions to the company. Personal Year-end Summary of Testers (Selected Part 5)

One year passed quickly, and with the care and help of the leaders of the project department, I successfully completed the test. We can distinguish right from wrong in our work, distinguish what can be done and what should be corrected and avoided, learn from success and lessons from failure, so as to practice better in the next step. Test is a very important process, and the information in the office is the record witness of the project quality, which is closely related. The following is a summary of the work in the past year:

First, keep the advanced ideas leading the right direction

Strictly abide by the management system of the company and the construction site, learn from the good rules and regulations and work style of the same industry and neighboring units, so as to correct their own attitude and refuse to cling to the past. Accept the valuable opinions and suggestions of leaders and colleagues with a correct attitude, and don't be stubborn and emotional. In terms of work, in view of the trivial nature of the work in the industry, we should change our working methods and attitudes, regard work as a pleasure, strive to find our own sense of existence, and do not wait and wait, take no chances, or deal with work.

2. Constantly summarize and gradually improve

1. Find shortcomings in the work, and carefully check the original records and ledgers during the report sorting process, so as to "pay more attention and have fewer problems" and gradually develop the good habit of "finding and rectifying in time". When you find other people's mistakes, correct them at the first time, and inform each other of your own experience, put an end to the phenomenon of repeated education, do a good job of mentoring and create a good atmosphere.

2. Take seriously the inspections at all levels, such as quality supervision station, preparation office, director office, resident office and project department, and make relevant records. At the same time, cooperate with various departments to do things in a down-to-earth manner, rectify and reply to the questions raised in time, and draw inferences from others to prevent repeated mistakes.

Third, master work skills and improve work ability

I will start from doing my own job and daily work, from myself, from now on, from the little things around me, and persevere.