Current location - Recipe Complete Network - Catering franchise - Minutes of bid evaluation meeting
Minutes of bid evaluation meeting
Time: * * day of * * year.

Venue: large conference room

Participants:

Conference theme: tender planning of fire fighting project in the first phase of the project.

Conference content

In order to successfully implement the first phase of fire engineering bidding, it is necessary to formulate detailed bidding plans, processes, ideas and bid evaluation rules. After many full discussions by various departments, the following consensus was reached:

1. General principle: Bidding must comply with the relevant regulations of the Group and be implemented in accordance with relevant procedures.

2. About supplier resources: The purchasing department is the main recommendation department of supplier resources, and the design department, the project department and the cost department recommend 65,438+0 ~ 3 supplier resources respectively, and conduct inspection according to the regulations, report the inspection results to the company leaders and departments in time, and determine the qualified units after joint evaluation. Finally, the qualified units at 10 and above are guaranteed to participate in the bidding of this project.

3. Acceptance: It is clearly stipulated in the bidding documents and contracts that "the winning bidder must ensure that the fire fighting project is qualified in one time, otherwise it will be severely punished". At the same time, strictly control the project cost.

4. Construction drawings and schemes: The drawings and schemes of this project must conform to relevant national and local codes (especially mandatory codes) to ensure smooth acceptance. Before issuing the tender documents, the tender drawings should be refined and improved as much as possible, and all bidders can optimize them within the scope permitted by the specifications.

5. About materials and equipment: For each type of materials and equipment, three brands of the same grade should be determined before bidding, and the manufacturers and places of origin should be specified accordingly. Bidders should choose 1 brand among the three brands, and at the same time, they can recommend 1 brand with higher cost performance in the optimization scheme.

6. About the quotation method: Each bidder shall submit two quotations, the first one is based on the unified scheme provided by our company, and the second one is based on each bidder's respective optimization scheme. At the same time, the bidder should explain in detail which parts have been optimized and how many differences there are in the quotation before and after optimization.

7. Bid evaluation principle: evaluate the technical bid and the commercial bid respectively. Technically, on the premise of meeting the technical requirements of our company, adopt all reasonable optimization suggestions put forward by bidders, and calculate and summarize the final quotation accordingly; In business, the completeness and rationality of the quotation are clarified for 2 ~ 3 rounds, and the bidder with the lowest quotation is finally selected as the winning bidder.

8. Work arrangement: The purchasing department is the overall lead organization department for bidding, and each functional technical department is responsible for the work within their respective responsibilities and cooperates with other departments in time. The cost department is responsible for compiling the bill of quantities and pre-tender estimate, and reviewing the commercial bid. The design department is responsible for providing bidding drawings and technical requirements, reviewing technical bids and taking the lead in organizing the selection of material brands.

* * * * Year * * Month * * Day

Minutes of Bid Review Meeting [2]

First of all, the construction unit introduces the basic situation of the project.

Second, on-site inspection of the seal of the tender

Third, the bid opening site, read the tender.

Fourth, introduce the judges

Verb (abbreviation of verb) construction negotiation

6. Announce the results of the negotiations.

Seven, send a letter of acceptance.

Eight, sign a contract

Construction bidding for pavement reconstruction project of Puhong section of Xianchong line in Xianning City, Hubei Province

Minutes of negotiation meeting

The construction drawing design of the pavement reconstruction project of Puhong section of Xianchong Line in Xianning City, Hubei Province has been approved by the Provincial Highway Bureau (E Lu Zong [2003] No.240). The Highway Management Office of Xianning City organized the bidding meeting of this project according to the spirit of the "Four Systems" project of the Ministry of Communications and the requirements of the Reply on Strengthening Highway Construction of the Provincial Highway Bureau.

The bidding of this project is divided into a construction contract section. The bidding scope is 7.672km from K 16+000 to K23+672.05, and a 9m wide asphalt macadam pavement is laid. K30+738.1-k36+250, k37+627-k38+313.3 is 6. 153km long, and the asphalt macadam pavement is 7m wide. K36+250-K36+738, K37+000-K37+627 are long1.15km, paved with cement concrete and 9m wide. The converted length of the turntable in Chibi Town is 0. 135km, and the width of the old pavement is 12m. Pave a 4cm thick fine-grained asphalt macadam overlay. Protection and drainage engineering construction and defect repair during the responsibility period. Bidding for this project began in 2003. On, 2003, Xianning Highway Management Office organized the preparation of bidding documents, and made the bidding public on, 2003.

On, 2003, Xianning Daxing Traffic Construction Co., Ltd., Hubei Daxing Chibi Wantong Company and Xianning Road and Bridge Engineering Company submitted their bidding documents to Xianning Highway Management Office. The Highway Management Office of Xianning City organized a bid evaluation team on March, 2003 and conducted a bid evaluation. The judges made a comprehensive evaluation on the credit standing, quotation and organization plan of each tendering unit, and finally the judges unanimously determined that Hubei Xianning Daxing Traffic Construction Co., Ltd. won the bid.

Signature of judge:

Xianning Highway Management Office, on, 2003.

Attachment: 1, Project Overview 2, Letter of Acceptance

3. Other information

I. Overview of the Project

1, project introduction

Xianchong Line is the main transit trunk highway in Xianning City. In recent years, with the continuous growth of traffic volume, the number of heavy-duty overloaded vehicles is increasing, and the road surface is seriously damaged. The Provincial Highway Bureau has approved the feasibility report and construction drawing design of the pavement reconstruction project of Puhong section of Xianchong Line, and the traffic and highway department of Xianning City plans to start construction in mid-August 2003 to ensure the safe and smooth traffic of Puhong section of Xianchong Line.

Reconstruction scheme: This project is a pavement reconstruction project. After the old pavement is stabilized, cement stabilized macadam base and asphalt macadam surface are added. The reconstruction scheme is 7.672km long from K 16+000 to K23+672.05, and the asphalt macadam pavement is 9m wide. K30+738.1-k36+250, k37+627-k38+313.3 is 6. 153km long, and the asphalt macadam pavement is 7m wide. K36+250-K36+738 and K37+000-K37+627 are two lengths.

1. 1 15km, paving cement concrete pavement with a width of 9m. The converted length of the turntable in Chibi Town is 0. 135km, and the width of the old pavement is 12m. Pave a 4cm thick fine-grained asphalt macadam overlay.

Necessary inspections should be carried out for bridges and culverts used along the line, and corresponding maintenance and reinforcement measures should be taken. It is forbidden to increase the dead load of the bridge deck to ensure safety.

The construction period of this project is 6 months. Construction started in mid-August 2003 and was completed and opened to traffic in mid-February 2004.

2, the construction scale, standard and construction bid division.

1) construction scale

The total length of the pavement reconstruction project of this project is 15.075km, and the pile number is k16+000 ~ k38+313.3.

2) Technical standards

Because this project is a pavement reconstruction project, the existing horizontal and vertical alignment will be kept unchanged, and the width of the existing subgrade pavement will be maintained, and the reconstruction construction will be carried out on the existing old cement concrete pavement. This pavement reconstruction project is divided into two standards:

1, k16+000-k23+672.05 and k36+250-k37+627 have the following main technical indicators:

Highway grade: Grade II in plain and hilly areas;

Calculate the driving speed: 80 km/h;

Subgrade width:12m; ;

Pavement width: 9m;

Minimum radius of horizontal curve limit: 250m

Maximum longitudinal slope: 5%;

Design load grade of bridge and culvert: steam -20, hanging-100;

2. The main technical indicators of K30+738.1-K36+250 and K37+627-K38+3 13.3 are as follows:

Highway grade: Grade II;

Calculated driving speed: 40km/h;

Subgrade width: 9m;

Pavement width: 7m;

Minimum radius of horizontal curve limit: 60m.

Maximum longitudinal slope: 7%;

Design load grade of bridge and culvert: steam -20, hanging-100;

Other technical indicators shall be implemented according to Technical Standards for Highway Engineering (JTJ00 1-97) issued by the Ministry of Communications.

3) Division of construction blocks

This project is invited for bidding, which is divided into a construction contract section. The bidding scope is 7.672km from K 16+000 to K23+672.05, and a 9m wide asphalt macadam pavement is laid. K30+738.1-k36+250, k37+627-k38+313.3 is 6. 153km long, and the asphalt macadam pavement is 7m wide. K36+250-K36+738 and K37+000-K37+627 are two lengths.

1. 1 15km, paving cement concrete pavement with a width of 9m. The converted length of the turntable in Chibi Town is 0. 135km, and the width of the old pavement is 12m. Pave a 4cm thick fine-grained asphalt macadam overlay. Protection and drainage engineering construction and defect repair during the responsibility period.

3. Sources of funds

The source of funds for the pavement reconstruction project of Puhong section of Xianchong Line in Xianning City is to apply for a loan from the provincial bureau, and the traffic and highway department of Xianning City is responsible for the construction and management of this project as a project legal person.

4. Project establishment

Reply of Hubei Provincial Highway Bureau on Construction Drawing Design of Pavement Reconstruction Project of Puhong Section of Xianchong Line (E Lu Zong [2003] No.240).

Second, the bid-winning notice

Hubei Daxing Traffic Construction Engineering Co., Ltd.:

Your company won the bid for the pavement reconstruction project of Puhong section of Xianchong Line in Xianning City, Hubei Province after the evaluation by the jury. It is hoped that someone will come to discuss and sign the contract within three days after receiving the notice of winning the bid. Overdue is regarded as automatic waiver.

I hereby inform you.

Xianning highway management division

Year, month, year, and year

Third, other information.