The process and procedure of enterprises dealing with environmental assessment
After the project application is put forward by the process construction unit, the Environmental Protection Bureau will carry out environmental protection examination and approval according to the basic construction procedures.

1, review the environmental protection part of the project proposal, and determine the preliminary opinions on project establishment;

2, examination and approval of environmental impact report (table); Review the relevant environmental protection contents in the feasibility study report or design task book;

3 review the environmental protection articles (chapters) in the preliminary design, and issue preliminary design review opinions;

4, review the construction drawing design of construction projects, and issue a notice of "three simultaneities" audit on environmental protection of construction projects;

5. Conduct on-site supervision and inspection on the implementation of the "three simultaneities" of construction projects, and handle problems in time when found;

6, examination and approval of the construction project trial production (operation) application report, issued a notice of trial production (operation) audit;

7, review the completion acceptance report, issued by the construction project "three simultaneous" completion acceptance list.

Application materials (1) Project proposal stage

1, project proposal;

2, superior approval, topographic map (blueprint drawn by the Institute of Surveying and Mapping);

3. Letter of intent for planning and site selection of the planning management department.

(2) Feasibility study stage

1, environmental impact report in duplicate or fill in environmental impact report form in triplicate;

2, the feasibility study report or design task; General layout of the project (blueprint);

3, municipal drainage department documents (wastewater into the municipal sewage treatment plant project);

4, sewage indicators (water source protection areas and quasi water source protection areas to discharge water pollutants construction projects);

5, planning and site selection opinions of the planning management department.

(3) Preliminary design stage

1, preliminary design report and attached drawings;

2, the feasibility study report or the approval document of the design task;

3. Design scheme of environmental protection facilities.

(4) Construction drawing design stage

1. Submit the general plan of the construction project (urban area 1:500, suburban area 1:2000), general plan of water supply and drainage, drainage system diagram and exhaust system diagram;

2, power, substation, refrigeration, air conditioning, water (hot) pump, garage, entertainment and other equipment layout, environmental protection facilities design, construction drawings and main engineering process flow chart, process equipment layout, etc. ;

3, preliminary design approval documents;

4, "construction project pollutant discharge table", "construction project environmental protection" three simultaneous "single" in triplicate;

5. Entrusted treatment agreement (including waste water, sewage, solid waste, radioactive waste, etc.). , and the solid waste is transported out of the city for treatment and disposal, which needs to be certified by the local provincial environmental protection department).

(5) Trial production stage

1. Submit the application report for trial production (or trial operation);

2, "three simultaneous" audit notice (copy).

(6) Completion acceptance stage

1. Submit the completion acceptance report and environmental monitoring acceptance report, and fill in the "three simultaneities" of completion acceptance in quintuplicate;

2, within one month after the project acceptance, to the municipal environmental protection bureau for sewage declaration.

Commitment time limit

1. Sign the examination and approval opinions within 3 days after receiving the environmental impact registration form;

2. Sign the examination and approval opinions within 5 days after receiving the environmental impact report;

3. Give a reply within 7 days after receiving the environmental impact report (except for the hearing time of administrative license or the modification time of environmental impact assessment);

4, received the preliminary design of environmental protection chapter (chapter) 1 month review opinions;

5. Issue a notice of "three simultaneities" review within 1 month after receiving the "three simultaneities" submission form and other documents and drawings submitted by the construction unit according to regulations;

6. After receiving the trial production application report and relevant materials, and after on-site inspection, reply within 2 weeks.

legal ground

"Environmental Impact Assessment Law of the People's Republic of China" Article 16 According to the degree of environmental impact of construction projects, the state implements classified management on environmental impact assessment of construction projects.

The construction unit shall, in accordance with the following provisions, organize the preparation of an environmental impact report, an environmental impact report form or fill in an environmental impact registration form (hereinafter referred to as an environmental impact assessment document):

(a) may cause significant environmental impact, it shall prepare an environmental impact report, and make a comprehensive evaluation of the environmental impact;

(two) may cause minor environmental impact, it shall prepare an environmental impact report, environmental impact analysis or special evaluation;

(3) If the impact on the environment is not significant and environmental impact assessment is unnecessary, an environmental impact registration form shall be filled in.

The catalogue of classified management of environmental impact assessment of construction projects shall be formulated and published by the competent department of ecological environment of the State Council.