Summary of the implementation of the river length system
The implementation of the river length system is of great significance for improving people's living environment. The following summary of the implementation of the river length system is compiled by me and shared with you here.
summary of the implementation of the river length system-
is the municipal tourism commission a permanent resident at the bridge port level? River length system? Responsible unit, for more than three years, in the Municipal Commission for Discipline Inspection? River chief? Under the guidance of the Municipal Water Control Office and in close cooperation with relevant responsible units in the Economic and Technological Development Zone and Xiuzhou District, in accordance with? One river, one length, one river, one policy, compartmentalization, division of labor, unified coordination and hierarchical management? Principle, earnestly implement it? River length system? Responsibility of the responsible unit, * * * to promote the comprehensive management of water environment in Changzhuqiao Port through consultation. The work in 21xx years is reported as follows:
1. Conscientiously implement the inspection and analysis system of responsible rivers.
Take the lead in formulating the annual regulation plan, supervise and urge the completion of the regulation tasks in each stage on time, improve the cooperative working mechanism of comprehensive river regulation, and the responsible units at the city, district and street levels regularly contact and communicate, patrol the river every month, record the situation, keep abreast of the progress, analyze the problems, and negotiate effective water control measures with each other. From the analysis of the water quality monitoring of Changzhuqiao Port this year, it is obvious that there has been progress compared with last year, but the three main indicators are still unstable, especially in June (see the water quality monitoring comparison table for details). Judging from the monthly inspection of river length units, the water quality of the river is sometimes clear and sometimes muddy, and sometimes it is black and white. Relevant responsible units, together with Xiuzhou District and Economic Development Zone Water Control Office, decided to carry out a comprehensive investigation of pollution sources along the line again, focusing on the investigation of sewage pipe networks and sewage outlets for leakage and string connection.
2. Strengthen the implementation of rectification of key special issues.
adhere to the problem orientation, focus on key points, attack difficulties, and continue to intensify the rectification of existing problems. First, in view of the problem that the renovation of the rain and sewage diversion pipe has not been completed in the northeast of Changnan Bridge in the economic development zone last year, strengthen contact and supervision. At present, the renovation project plan has been submitted to the military sub-district for examination and approval, and the instructions have not been issued; The project funds have been arranged to be RMB 1,111,111 yuan. However, due to the elevation problem of the urban sewage pipe interface in the economic development section, the original sewage pipe of the chemical defense group needs to be completely rebuilt, and the project involved is large. It is planned to be built and rebuilt together with the new building. Second, the renovation project of rain and sewage diversion pipe was not completed in the Economic Development Zone Branch of the Municipal Public Security Bureau last year, and the sewage receiving pipe project was completed in the first half of this year. Third, in view of the fact that there are no sewage pipes on the balconies of the old residential buildings along the river, the domestic sewage such as washing machines on the balconies is directly discharged and seeps into the river through the soil, which affects the indexes of ammonia nitrogen and total phosphorus in the river. Because it involves capital budget arrangement and approval procedures, it will be arranged by the Economic Development Zone and Xiuzhou District in batches and in stages, and will be included in the 21xx and future annual renovation plans. Fourth, in view of the parking platform of RT Mart and Longyu Hotel built on the river of Changzhuqiao Port, we will continue to do a good job in cleaning the water surface and pumping water at regular pumping stations to ensure the smooth flow of water. Since October, due to the problem that the river water under the parking platform in RT Mart is black and smelly, the Municipal Tourism Commission has negotiated with the Xincheng Street Water Control Office in Xiuzhou District to thoroughly dredge the river under the parking platform in RT Mart, and at the same time, comprehensively check the problem of rainwater and sewage pipes around the river again. The project is scheduled to be completed before the end of the year.
3. Carry out in-depth investigation and rectification of sewage pipe network.
since the beginning of this year, the municipal and district river responsible units have continued to strengthen the real-time supervision of sewage discharge and interception along the long-term bridge port, and implemented the system of regular inspection and maintenance of shore, open pipes and underground pipes, and found problems, communicated them in time and handled them in time. Relevant units focused on the comprehensive inspection of the discharge of rainwater pipes in the RT Mart parking platform section of Xiuzhou District, and invited professional pipeline companies to find out the causes of sewage leakage and implement rectification; Completed the sewage interception and acceptance construction project of Zhejiang Hecheng Rural Commercial Bank; Carry out the general survey of rainwater and sewage pipes of catering units in Penglai Road and Qimeng Road around Changzhuqiao Port. According to the survey results, Xiuzhou New District entrusts design units to carry out comprehensive renovation; Sewage from living quarters was found to flow into the river channel through rainwater pipes in the waters east of Chang Xiu Bridge, and the Economic Development Zone carried out pipeline renovation in time. Since the beginning of this year, six problems have been found in inspections, and three problems of leaking pipes have been found in investigations. Timely measures have been taken and relevant units have been contacted for rectification and implementation. In the second investigation of pollution sources in February, it was found that there were 14 leaking sewage pipes in old residential areas and commercial buildings along the river in wuyue section of Xiuzhou District, which were planned to be included in the 21xx annual remediation plan.
4. continue to promote the working mechanism of water management and protection.
seriously implement it? Four in one? Cleaning mechanism, a person shall be responsible for cleaning the river and the surrounding environment regularly, so as to keep the river free of floating wastes, obstacles and debris accumulation on the river bank, and ensure smooth water flow. We will continue to deepen ecological water control and greening and water conservation. Combined with urban organic renewal and eco-city construction, we will further do a good job in revetment greening and management of long-lived bridge ports. Do a good job in mobilizing propaganda on water control in the whole region, implement the supervision responsibility of water control and water protection of relevant streets, communities, enterprises and self-employed households, and create an atmosphere of * * * grasping * * governance for long-term residence in Qiaogang. We will strengthen supervision over the discharge of pollutants from restaurants, car wash shops, night stalls and other business units along the river, carry out centralized inspections and special treatment activities in a timely manner, and seriously investigate and deal with environmental violations such as direct discharge, illegal discharge, excessive discharge and evasion of supervision by enterprises and business households along the river. Carry out the publicity of water environmental protection knowledge of residential areas and business entities along the river, strengthen the awareness of enterprise and citizen autonomy, and protect the achievements of river management to realize the comprehensive improvement of water quality in the long-term bridge port.
water environment management is related to people's lives and the long-term development of the city. It is a long-term benefit project. In the next stage, the Municipal Tourism Commission will continue to work in the Municipal Commission for Discipline Inspection. River chief? Under the leadership of, in collaboration with relevant responsible units in the Economic and Technological Development Zone and Xiuzhou District, we will earnestly carry out river patrol and water quality monitoring and analysis, regularly check the sewage pipelines along the river, supervise and implement the project of chemical prevention and control, do a good job in cleaning the river and surrounding environment, continue to carry out biological and scientific water control research and implementation projects, and do everything possible to achieve the goal of governance, and strive to upgrade the water quality category of Qiaogang, which is a long-term resident this year. Summary of the implementation of the river length system II
Hewan Community is adjacent to sanhe town in the east and Fengle Street in the west. There are 592 households in the community, all of whom live along the Fengle River. Since the implementation of the river length system, our community has attached great importance to it. In strict accordance with the requirements of the river length system, we have carried out the management of the river length system from the following aspects.
1. Strengthen leadership and earnestly perform duties
The community has set up a leading group for the work of river length system, with Wang Yuhua, the general branch secretary, and other comrades of the two committees as members, and has formulated a practical implementation plan for 21xx in light of the actual situation of the community. River length system? Work plan, established daily management mechanism and work ledger. In accordance with the town government's goal of implementing the river length system, clear work responsibilities, and in accordance with the way of unified leadership and responsibility implementation, we will earnestly strengthen the water environment improvement in our community area.
2. Formulate measures to carry out comprehensive improvement
The river length system of the river bend community extends from the former Liu Yuntai Bathroom in Xiaojiaqiao in the west to Shenjingou in the east, bordering sanhe town, with a total length of about 5.4 kilometers. The line is busy and the task is arduous. We will carry out it to the residents through radio, electronic screens, billboards, conferences and other forms? River length system? Work publicity and education, constantly enhance the awareness of the whole people to participate in river regulation, and strive to create a good atmosphere for residents to participate extensively. In August, we concentrated on using ships to clean up floating objects and rotten duckweeds in the river for at least 21 times, cleaned up and transported all the garbage along the coast, and organized more than 1,111 people to eradicate the cultivation along the river. The toilets on the waterfront slope have been basically cleaned up and demolished. At present, only five toilets are being mobilized for work, and all of them will be demolished by the end of September. So far, this year? River length system? The community has invested more than 8,111 yuan in water environment management.
Third, strengthen measures to implement a long-term mechanism
First of all, we should strictly follow the work plan of the river length system, earnestly establish a river patrol system, adhere to the river patrol inspection at least once a month, and carefully record the river patrol. When patrolling the river, we should have pictures, and implement rectification in time when problems are found. We should not engage in formalism, go through the motions and leave no dead ends. Secondly, we should do a good job in monthly information collection, reporting and filing, at the same time, do a good job in water environment investigation and registration within our jurisdiction, coordinate and solve the problems in water body management within our jurisdiction, and make the river length system a long-term mechanism and advance smoothly. Summary of the implementation of the river length system III < P >? River length system? Since the work was carried out, has our district earnestly fulfilled it? River length system? Job responsibilities, combination? Three lines and three sides? Renovation and comprehensive improvement of Xin' anjiang river basin, actively promote the improvement of river water environment, and will? River length system? Management is put in place to ensure the normal activities. The summary report is as follows:
1. Fengle River Basin was introduced in 21xx? River length system? Implement opinions and fully implement them? River length system? Management by objectives. On September 4th, 21xx, our district issued "On the Comprehensive Establishment? River length system? , Implementation Opinions on Strengthening the Management of Fengle River Basin, a tributary of Xin 'an River, and comprehensively establishing rivers in the whole region? River length system? Management and protection system, to implement the responsibility of river management? River chief? .
second, in 2114? River length system? Manage the main work. The first is to deepen the construction of the responsibility system. Expand? River length system? The scope of management should be refined and the management level should be extended. In the Fengle River Basin, the length of the river should be extended from the second level to the third level of the village (community), and the three-level river course of the district, township (town, street) and village (community) should be implemented. River length system? Management responsibility system. There are 71 rivers (sections) in 7 towns and 47 administrative villages along the river in Fengle River Basin, including 12 first-class rivers, 12 second-class rivers and 47 third-class rivers. Implement hierarchical and segmented management, clarify the responsibility area, and strengthen daily supervision. The second is to carry out? River chief? Business training. On March 7th, organize the villages and towns? River chief? Participate in the organization department of the municipal party Committee and the city? River chief? Office, Municipal Water Conservancy Bureau, Municipal New Insurance Bureau held the 2114 Xin 'anjiang River Basin River Chief Training Course, for the township level? River chief? Conduct business training to deepen the understanding of? River length system? Manage the understanding of work, sort out the working ideas and improve the professional level. The third is to establish a patrol mechanism for river inspections. Establish a river patrol system and issue the "River patrol system in Fengle River Basin, Huizhou District, Huangshan City". River patrol teams are set up in the district, and villages and towns organize river patrol teams to patrol the rivers in the region. District patrol and rural patrol are combined to keep abreast of the river conditions.
Third, carry out clean-up actions for rivers and reservoirs. On September 27th, led by the District Water Conservancy Bureau and the District Civilization Office, more than 1,111 leaders of the four major teams in our district, cadres of organs directly under the district, townships (community offices), villages (community cadres) and volunteers participated? Protect mother river and clean Xin 'anjiang? Clean rivers and reservoirs, and concentrate thousands of people on general assembly activities. The focus of this clean-up operation is small and medium-sized rivers, reservoirs, ponds and dams, urban-rural fringe and important nodes of rivers in the whole region, including the urban section of Yansi River in Fengle River, major rivers in the residence of township governments and rivers along key villages such as national highways, provincial highways and tourist attractions. Focus on the cleaning of 16, 41.8 km river reach and Sicun reservoir area, as well as the cleaning of river water blocking obstacles and ditches.
according to statistics, the region has used more than 21 surface salvage boats, 7 excavators, 6 forklifts, 16 transport vehicles and 43 garbage cleaning vehicles, and * * * has salvaged and cleared 86 tons of garbage. Through this renovation, the sanitation environment of Fengle River has been significantly improved, which has effectively improved the environmental awareness of the broad masses and effectively promoted the construction of beautiful villages.
fourth, strengthen the salvage of key rivers in Fengle River. First, strengthen publicity and guidance, and strengthen the awareness of protection. The District Water Conservancy Bureau, together with the District Civilization Office, the Environmental Protection Bureau, the New Insurance Bureau and other units, launched an initiative to protect the mother river, which was broadcasted on district TV stations and posted in village groups and communities, and distributed publicity materials to villages along the river, thus raising residents' awareness of protecting the water environment. The second is to do a good job in source management and highlight key areas. Village-level cleaning and river cleaning should be combined, and the responsible areas should be implemented in villages and towns, and the water surface cleaning of rivers should be brought into normal and refined management. The District Water Conservancy Bureau is responsible for the daily cleaning of the main road of Fengle River (the section from Baota Power Station in the urban area to Xixi Nanda Bridge is about 6 kilometers long), the urban section of Yingxi River and the second dam of Fengle Reservoir; Each township is responsible for the water surface cleaning of tributaries in its jurisdiction, and pays close attention to the management of floating objects effectively. The third is to strengthen the daily management of the main stream of Fengle River and the salvage team of Fengle Reservoir. Four professional cleaning teams were set up to be responsible for the water surface cleaning of Fengle River main road, Yingxi River urban section, Fengle Reservoir and Fengle Reservoir No.2 dam respectively. Our district also selected the river cleaning team by purchasing services from the society. In early September, the river cleaning project of Fengle River urban section was completed (2114? 21xx) bidding work, selected Huangshan Huizhou Rijie Cleaning Co., Ltd. as the project cleaning team, and signed a cleaning contract with it at the end of the month.
5. Strengthen sand mining control in river basins. Strengthen the management of sand mining in Fengle River and its 12 main tributaries, coordinate with relevant units directly under the district and towns along the river, standardize sand mining and sand washing along the river, strictly implement the permit system for sand mining in the river, and basically realize the goal of no unlicensed illegal sand mining. In response to the pilot work of Xin 'anjiang ecological compensation mechanism carried out by the municipal government, our bureau has approved river sand mining in recent years. Do subtraction? The examination and approval of river sand mining field was gradually cancelled, and the rivers in our area were basically designated as reserved areas and no mining areas, and there was no river sand mining field.
VI. Carry out? River chief? The work of setting up public signs. According to the work requirements of the municipal river system office, our district will be set up in the rivers of 7 towns in Fengle River Basin and 48 administrative villages along the river. River chief? Public signs. At the current municipal level? River chief? Public notice board 1 (city leader) and district level 2? River chief? 12 public signs (district leaders) have been basically completed, township level 3? River chief? Public signs and village level 4? River chief? Public signs are being made and installed.
VII. What's the next step?
What will our district do? River length system? Management by objectives requirements, through strengthening with the city? River length system? Office docking communication and exchange and study with brother counties, increase the cooperation and cooperation between departments and towns in the district, seriously and actively solve problems in the work, and do a solid and effective job in all aspects to ensure? River length system? New breakthroughs have been made in target management to ensure the continuous improvement of water environment in our region.
1. further improvement? River chief? Publicity card information, to lay a good foundation for the continuous and in-depth development of river length system;
2. Combining with the third-line and trilateral environmental improvement, strengthen? River length system? Implementation and supervision. Do a good job in cleaning the water surface of Fengle River from Sungong Bridge to Xixi South Bridge, Yingxi River urban section, Fengle Reservoir and the Second Dam.
3. Keep improving and perfecting? River length system? Management system and mechanism construction, the implementation of river patrol system, to carry out river patrol. Make a work plan, carry out river salvage, and control sand mining and washing. Do a good job in Fengle River Wenfeng Bridge to Xixi South Bridge, Yingxi River Urban Section and Fengle Reservoir.