The provisions on the establishment and management of the temporary storage yard of urban construction waste are as follows

In order to strengthen the management of temporary storage yards of urban construction waste, implement the regulatory responsibilities of local governments and departments, prevent the occurrence of illegal acts such as littering and dust pollution, maintain the city appearance and environmental sanitation, and protect and improve the ecological environment, these Provisions are formulated.

I. Scope of application

These Provisions shall apply to the administrative areas of Tongzhou District, Chongchuan District, Gangzha District and Economic and Technological Development Zone in Nantong City.

Construction waste temporary storage yard mainly includes engineering waste residue temporary storage yard, centralized collection and transportation point of decoration waste and decoration waste temporary storage point.

Second, the setting principle

(1) Overall arrangement. Comprehensive consideration is given to factors such as output, collection (transfer) capacity, transportation distance, disposal method, environmental impact, human will, etc. , scientific location, set the appropriate scale and quantity, and strive to set the number to basically match the actual needs.

(2) Strict control. Strictly abide by the relevant laws and regulations of the state, provinces and cities, conduct examination and approval management according to the specified requirements, and set up after examination and approval. Without approval, it is forbidden to set up a temporary storage yard for construction waste. Effectively strengthen the daily supervision of illegal dumping sites, strictly investigate outstanding problems such as illegal setting, irregular setting and inadequate safety and environmental protection management according to law, and ensure the standardized setting and management of temporary storage yards for construction waste.

(3) Safe operation. The temporary storage yard of construction waste shall be set up in accordance with the principle of "safety first" and set up and managed in strict accordance with the safety management requirements stipulated by laws, regulations and rules. The main unit of construction and operation must formulate a safety and environmental protection accident disposal plan, clarify the safety and environmental protection responsibility of on-site management, implement on-site safety and environmental protection management measures, and organize regular investigation and rectification of safety and environmental protection hidden dangers to prevent production safety accidents and environmental pollution.

Third, make rules.

(1) Temporary storage yard for engineering muck

1. The engineering muck temporary storage yard shall not be for profit.

2 should be set in the red line of the property right unit.

3. In accordance with the requirements of the law, go through the relevant procedures such as land lease, ensure the legality of land use, and clarify the responsibilities of land management.

4. The health protection distance should be ≥500 meters, and there are no leisure and living places such as residential quarters, schools, hospitals, commercial complexes and citizens' entertainment facilities within the health protection distance. It is strictly prohibited to set it in the range of 0/000 meters of the river bank/KLOC, 50 meters outside the ecological red line of the river, and within the specified range of the high-voltage corridor.

5. Necessary facilities such as fire safety, information supervision, vehicle washing, dust suppression, noise prevention and noise reduction should be set up, and pretreatment facilities such as sorting and crushing should be set up as needed.

6. It is necessary to set up a closed fence (enclosure), harden the roads and classified stacking sites, set up fixed vehicle washing equipment at the entrance and exit, install a video monitoring system, and realize real-time networking with the monitoring platform of the municipal urban management supervision and command center and the local urban management bureau. Should be set up in accordance with the provisions of the rain and sewage diversion system, set up dust online monitoring system and network with the municipal dust supervision system, set up warning signs and on-site management system publicity board in a prominent position.

(2) Decoration of centralized garbage collection and transportation point

1. Local streets should be set separately or jointly by adjacent streets according to actual conditions.

2. Set a closed hard enclosure with a height of not less than 2.0m, and set an openable and closable gate. Entrance and exit channels should be hardened, and washing facilities should be set up. Lighting, dust-proof, cleaning and safety fire-fighting facilities and equipment should be set up inside and outside the site according to the specification requirements, video monitoring equipment should be encouraged to be installed, and the stacking place should be managed 24 hours a day. Street decoration garbage centralized collection and transportation places shall set up mobile dust-proof covering facilities in appropriate positions.

3. Classified stacking sites should be set up inside, and "recyclable", "other garbage", "green garbage" and "harmful waste" should be distinguished by identification marks. The logo is unified with black characters on a yellow background, and the logo is unified with solid yellow lines.

4. Decoration of garbage collection and transportation sites shall be marked with the sign of "Decoration of garbage collection and transportation sites", and a management bulletin board shall be set up, indicating the opening and removal time of the management unit and responsible person, collection and transportation sites, supervision and reporting telephone numbers, etc.

(3) Decoration of temporary garbage dump

1. The old residential area without property management can be set up after comprehensive evaluation if there is a suitable location.

2. The residential area managed by the property management company must set up a temporary stacking place for decoration garbage.

3. The temporary garbage storage site for decoration shall have an area of ≥50 square meters and a height of not less than 2 meters. The enclosed hard enclosure shall be provided with doors that can be opened and closed. The entrances, exits and access channels shall be hardened and equipped with lighting and fire-fighting equipment. If possible, it can be equipped with washing equipment and mobile dust-proof devices.

4. The temporary stacking place for decoration garbage should be provided with a three-format classified stacking pool, and obvious signs such as "usable construction garbage, combustible garbage and other garbage" should be set to facilitate residents to dump.

5. Temporary decoration garbage dump should be marked with "temporary decoration garbage dump" sign in a conspicuous position, indicating the opening time, supervision and reporting telephone number and other contents, and arrange special management.

Fourth, the examination and approval management

(a) the applicant who applies for the temporary storage yard of construction waste shall apply to the local district urban management department in accordance with the examination and approval procedures for the establishment of the construction waste disposal yard.

1. To apply for setting up a temporary storage yard for construction waste, a land use certificate (including land title certificate, land certificate, lease contract, etc.) shall be provided. ), land management responsibility book, opinions of local sub-district offices, land planning map, site setting, classified disposal plan and related materials.

2. Set up a temporary storage yard for engineering dregs, and the urban management department in the region shall be responsible for examination and approval management in conjunction with the planning, environmental protection, safety supervision and other departments; Set up centralized collection and transportation points of decoration garbage and temporary stacking points of decoration garbage, which will be directly examined and approved by the urban management department in the region.

3. After receiving the application materials, the district urban management department shall conduct on-site investigation in time, and the application for temporary storage yard of engineering muck may be submitted to the Municipal Urban Management Bureau for joint on-site investigation.

(2) After on-site investigation, the temporary storage site of construction waste meets the requirements, and the urban management department of the jurisdiction shall go through the relevant examination and approval procedures within 10 days, and report to the Municipal Urban Management Comprehensive Law Enforcement Detachment for the record. Do not meet the requirements, to inform the reasons in writing.

If the main management unit needs to continue to use it, it shall apply to the urban management department of the jurisdiction for extension thirty days before the expiration of the validity period.

(three) to cancel the centralized collection and transportation place of street decoration garbage, it shall apply to the district urban management department in advance, complete the site cleaning and cancel it after passing the acceptance of the district urban management department.

Verb (abbreviation of verb) related requirements

(a) the establishment of construction waste removal security system. Units that set up temporary storage yards for engineering dregs must sign agreements with units that provide land plots, and ensure that the temporary storage yards are thoroughly cleaned after the expiration of the use period in an appropriate way, and report to the urban management departments in their respective jurisdictions for the record.

(two) a clear time limit for demolition. In principle, temporary dumping sites for decoration garbage in residential areas should be cleared daily, and the longest time should not exceed 1 week. The centralized collection and transportation point of decoration garbage will be cleared when it is full, and the temporary stacking time of engineering muck will not exceed 6 months.

(3) Strictly standardize management. According to the requirements of the classified disposal scheme of construction waste, the yard shall specify the classification standards, stacking requirements and disposal specifications. Safety assessment must be carried out when the height of construction dump exceeds 3 meters to ensure safe operation. It is strictly forbidden to mix toxic and harmful, domestic garbage and construction garbage, and at the same time take measures such as dust prevention, seepage prevention and pollution prevention to prevent environmental pollution.

(4) Improve management responsibility. The temporary storage yard of construction waste is managed by the setting unit, and the urban management department in the district is responsible for supervision. When the temporary storage yard of construction waste expires, the setting unit must clean up the construction waste piled in the storage yard and level the site. After the on-site acceptance by the district urban management department, the land supply unit will carry out follow-up management. After the expiration of the set unit is not cleaned up in time, the land supply unit is responsible for the demolition.

(5) Strengthen transportation management. Vehicles engaged in construction waste disposal in the temporary storage yard of construction waste must be all transport vehicles owned by transport enterprises that have obtained the Nantong Urban Construction Waste Disposal (Transport) Permit issued by the Municipal Urban Management Bureau. At the same time, before the disposal activities, the construction waste discharge permit should be obtained. Construction waste shall not be handed over to individuals or unauthorized transportation enterprises for transportation.

(six) to ban illegal stacking places. According to the requirements of environmental protection and solid waste cleaning in the Yangtze River Economic Belt, the unauthorized temporary storage yard of construction waste must be cleaned and rectified before the end of February 20 19.