JD.COM is determined to build the automation operation center into a modern operation center with the largest building scale and the highest degree of automation in Asian B2C industry. Therefore, JD.COM named the project "the first in Asia".
JD.COM will invest in Beijing, Shanghai, Guangzhou, Shenyang, Chengdu, Han and other places to build "Asia first" and build a self-operated modern operation system covering the whole country. In 20 12, JD.COM Mall took the lead in establishing the first e-commerce operation center in East China, which integrated the functions of temporary storage, order processing, sorting and distribution, and supported and promoted the company's business development in East China.
The characteristic of Asia No.1 is that all goods are stored in the same warehouse in the logistics center, which reduces cross-regional operations, improves customer satisfaction and reduces costs. Quickly complete the sorting of goods and merge goods belonging to the same order. Automatic equipment can quickly sort orders, ensuring sorting efficiency and accuracy. Current situation in Asia-1
Many cities across the country have plans to build the "Asia No.1" project, which has been started and put into use one after another.
The key logistics equipment of Asia No.1 project-the goods-to-people system, is used to automatically access and transport containers such as cartons and turnover boxes, which can realize the goods-to-people picking technology. AS/RS system: automatic three-dimensional warehouse system, high-density storage form, which can make full use of storage space. Cross-belt sorting system: a high-speed automatic sorting system, which is suitable for the sorting of small and medium-sized parcels, and cooperates with the automatic parcel supply form to minimize personnel investment and improve sorting efficiency. AGV system: Automatic guided vehicle (AGV) replaces the manual mode of carrying heavy objects, repeats the routine material handling work, and can be combined with robots and automated three-dimensional warehouses. Attic shelf system: multi-layer shelf system with steel structure, making full use of space. Employees are picking goods in the roadway. Some projects of Asia No.1 adopt a four-story attic shelf system to increase the available picking area and maximize the use of storage space. Conveying system: The logistics center of Asia No.1 uses a large number of conveying lines to reduce the cargo handling capacity, reduce the labor intensity of personnel and improve the automation level. The prospect of Asia No.1 project will bring cheap, safe and fast shopping experience to consumers in the project area. The scale and automation are leading the world, setting a benchmark for modern logistics service industry and promoting the development of modern logistics industry.